Majid Imran

Lahore

Summary

Experienced Site Engineer managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management.

Overview

9
9
years of professional experience

Work History

Project Site Engineer

Hitachi Energy Pakistan
Islamabad
01.2024 - Current
  • Responsible Project Engineer for Charsadda Electrode site for execution of the remaining civil and Electrical installation works.
  • Serve as a project representative by building and maintaining effective relationships with customers as well as other local organizations.
  • Manage sub-contractors on site hired by Hitachi Energy to ensure necessary safety, quality, and progress achieved to meet delivery dates.
  • Plan on-site project activities related to the assigned discipline with Site Construction Manager and Project Manager.
  • Coordinating all on-site activities related to the assigned discipline to ensure the successful execution of civil construction, electrical equipment installation, erection,start-up.
  • Coordinate between customer and external resources on installation/construction targets, health and safety requirements, site organization, and policy.
  • Ensures correct handling, storage and installation of delivered equipment, coordinate with Construction Manager and Project Manager for on-site storage as well as shipment, logistics to secure timely site delivery of equipment and material.
  • Ensure detailed and up-to-date construction Health & Safety (H&S) plan is in place.

Project Site Engineer

Hitachi Energy Pakistan
Islamabad
02.2021 - 01.2024

Responsible for Installation of HV Equipment (Main Circuit equipment) AC & DC at CASA1000 HVDC Converter station Nowshera, Pakistan.

  • Supervise High voltage Equipment's installations.(both AC and DC Yard/filter area)
  • Supervise the Installation of HV AC circuit breaker HPL 550 (T)B2_63+BLG1002A ,HPL 245B1+BLG NBS interrupter (DC Switch) and LTB 170D1/B+BLK222 NBGS high speed switch.
  • Assist Supervisor during the commissioning of AC and DC Switches.
  • Area handing over/takeover for installation.
  • Preparation of Installation plan Inspection of installed material followed by layouts and drawings. (ITRs)
  • Manage and guide subcontractors to ensure completion of all installation activities efficiently and cost-effectively, in accordance with contract specifications, quality standards, and safety requirements
  • Contribute to planning and implementation of installation activities.
  • Coordinate the installation activities with the Installation Manager / PCCM.
  • Material Planning & Inspection prior Installations
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Completed visits before, during, and after installations to assess quality and performance.
  • Delivery notes supports Finance team for invoicing towards customers.
  • Oversaw quality control and health and safety matters for construction teams.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Coordinated materials SCM & Logistics, documentation and for installations.
  • Warehouse Management. Quality Control & Damage Handling, Goods Arrival management at site with the given timeline. Acting as a Local Transport Arranger.
  • Material planning, Responsible for Material Inspection prior the installation.

Regional Project Manager

Aqil Khan & Co.
Rawalpindi
09.2019 - 01.2021

Being Regional Manager/Coordinator of Central Region (C-A) for project of JAZZ OFC O&M. Develop thorough competency on optical transport Products and operations techniques of OFC. To perform high level O&M of OFC operations, PM/CM of the network, Fault Management, Network Audit from both technical & financial perspective, Health Checks, Project Execution with great product/technology. knowledge.

  • Plan CM/PM activities.
  • Analyzed sales and marketing data for improved strategies.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Developed and implemented project plans and budgets to ensure successful execution.
  • Monitored project progress, identified risks and took corrective action as needed.

Motive is to maintain high network availability with extensive PM/CM plan, Network health with agile response. Moreover, SLA timeline is the key.

Electrical Engineer

Smart Tracks Co. KSA
Jeddah
06.2019 - 08.2019

HAJJ operation short assignment. Responsible for existence system specially Related to Industrial Automation and BMS. Supervision of running systems. Planning and scheduling assign tasks and responsible for RFIs and DPR. Arrange/participate in meeting with costumers.

  • Responded to general inquiries from members, staff and clients via mail, e-mail and fax.
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Evaluated power needs for various systems.
  • Collected and analyzed data on vendor demographics, preferences and needs.

Service Engineer

ABB Power & Automation Pvt Ltd Pakistan
Lahore
11.2017 - 03.2019
  • Ensure technical solutions, using established standards, methods and technologies, to develop solutions and resolve issues, planning and scheduling define jointly with project manager. Preparing all project plan & documents. Responsible for design system architecture, hardware and network design, ordering, project costing & scheduling.

Complete system development including HMIs and hardware configuration. Participate/Arrange technical meetings to support sales staff and create additional opportunities through visiting client’s sites. Actively seeking feedback from client for improvement. Negotiates directly with the responsible persons at customer end (Pvt&Govt). Ensures that the project follows, execution, best practices according to ABB policies. Coordinates with supply chain management, and successfully procures required services, materials and equipment for the project from external and internal suppliers. Plan and schedule for FAT & SAT.

  • Developed, deployed and integrated Automation systems and networks.
  • Performed periodic testing of all networks and systems.
  • Analyzed, troubleshot and diagnosed problems and provided prompt repair and solutions.
  • Installed, configured and tested equipment on specialized platforms.
  • Resolved customer complaints in prompt, polite and professional approach.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Worked cross-functionally within organization and external partners, integrators and vendors.
  • Supported Engineering and Maintenance departments with technical support.

Project Coordinator

Relacom Pakistan Pvt Ltd
Gujranwala
04.2017 - 10.2017

Plan and schedule projects, procurement, supervise subordinates, maintain records and files. Motivate Teams to increase their productivity and meet work goals. Examine the sites and proper working procedures. Perform related work as required. Plan and schedule with Operator (CM Pak) for Site Inspection, FAT&PAT. Maintain the quality of all the parts of system to be high.

  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
  • Kept projects on schedule by managing deadlines and adjusting workflows.
  • Responded to requests for information on materials to inquiring parties.
  • Arranged travel and accommodation for team members and project partners.
  • Assembled manuals for team usage from vendor-supplied product data sheets and submittal information.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.

NOC Engineer

Elc Solution Pvt Ltd Pakistan
Lahore
03.2016 - 03.2017

Responsible to manage all activities of NOC site for monitoring and ensure smooth running of Network (Telenor-PK) through NETNUMEN (ZTE). Responding to breakdowns for all BTS analyzing, quickly concerned person in order to quick resolution of the problem. Checking and analyzing of all alarms. Any other special task or assignment given by Manager.

  • Monitored and maintained network and software components according to established guidelines and best practices.
  • Exceeded SLA standards for response times and problem resolution.
  • Established positive working relationships with users to quickly resolve problems.
  • Closed first-time tickets quickly and met resolution volume requirements.
  • Collaborated with other network engineers to configure and maintain network monitoring and load balancing.
  • Kept detailed documentation on each support ticket and added lessons learned to knowledge base.

Electrical Engineering

SALCON ELECTRIC KSA
Riyadh
04.2015 - 07.2015

Project Estimation. Project Design (Electrical Panels). Using EPLAN electric P8 & XL Pro3 software (Legrand) for Type-tested panels. Preparing BOQ, Quotation, Coordinate with Production Department and clients to fulfill their requirements. Responding to breakdowns. Projects handling of low voltage system. Maintain the quality of all the parts of system to be high.

  • Initiated and analyzed vendor quotes and pricing for electrical components.
  • Reviewed customer electrical specification to determine job scope.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Performed maintenance procedures and repairs on existing electrical products and systems.

Education

Bachelor of Science - Electrical Engineering

Hajvery University
Lahore, Pakistan
12-2013

Associate of Science - Associate Engineering Electronics Technology

Pak Polytechnic Institute
Lahore, Pakistan
10-2007

High School Diploma -

Govt. Higher Secondary School
Faisalabad, Pakistan

Skills

  • HVDC
  • Installation Supervision
  • Technical Documentation
  • Project Executioner
  • Scheduling and Planning
  • Field Support
  • Warehouse Management
  • Material handling
  • RFI Documentation
  • Health and Safety Regulations
  • Materials Testing
  • Project Administration
  • Project Coordination
  • Technical reporting

Languages

Urdu
First Language
English
Advanced (C1)
C1

Timeline

Project Site Engineer

Hitachi Energy Pakistan
01.2024 - Current

Project Site Engineer

Hitachi Energy Pakistan
02.2021 - 01.2024

Regional Project Manager

Aqil Khan & Co.
09.2019 - 01.2021

Electrical Engineer

Smart Tracks Co. KSA
06.2019 - 08.2019

Service Engineer

ABB Power & Automation Pvt Ltd Pakistan
11.2017 - 03.2019

Project Coordinator

Relacom Pakistan Pvt Ltd
04.2017 - 10.2017

NOC Engineer

Elc Solution Pvt Ltd Pakistan
03.2016 - 03.2017

Electrical Engineering

SALCON ELECTRIC KSA
04.2015 - 07.2015

Bachelor of Science - Electrical Engineering

Hajvery University

Associate of Science - Associate Engineering Electronics Technology

Pak Polytechnic Institute

High School Diploma -

Govt. Higher Secondary School
Majid Imran