Summary
Overview
Skills
Work History
Software
Education
Accomplishments
Interests
Timeline
Certification
COMPLETED PROJECTS
Generic
ABDULLAH AWAD

ABDULLAH AWAD

MECHANICAL & PLANT ENGINEER
ABU DHABI

Summary

Hardworking Mechanical Engineer bringing 5+ years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and plant matters. Strong knowledge of diesel
engines,hydraulic systems, Dewatering systems, power systems & plant
operations with safety measure.

Overview

5
5
years of professional experience
5
5
years of post-secondary education
2
2
Languages
1
1
Certificate

Skills

  • Analytical and Critical Thinking
undefined

Work History

WORKSHOP & PLANT ENGINEER

COMBINED GROUP COMPANY - UAE
ABU DHABI
02.2019 - Current

In addition to my previous job in (reverse osmosis sea water plant), i have worked in heavy equipment workshop to cover the company needs from heavy equipment, power systems, transportations & work tools in line with Reverse osmosis plant to cover site need from sweet water.

My duties include but not limited to:

  • Leading maintenance team to complete preventive maintenance on engines, transmissions, tires and other vehicle systems.
  • Followed factory and dealership standards to accurately perform repairs by maintenance team according to work order.
  • Conducted full operational compliance inspections before releasing the equipment for the site.
  • Managed parts inventory and tracked status of recent orders to maintain tool and equipment stock.
  • Tested newly installed equipment to determine proper functionality and compliance with regulations.
  • Ordered repair parts quickly to prevent delays in projects and repair work.
  • Maintained functionality and reliability of engines, machines and systems through regular diagnostic checks.
  • Consulted manuals, technical documentation and repair tree charts for further information prior to conducting fixes.
  • Oversaw employee attendance record, handled payroll and ordered new materials for sites.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Wrote monthly reports to help senior leadership make accurate operational plans and decisions.
  • Verified completed projects met approved time, quality and cost estimates.
  • Communicated daily with vendors to keep project fully operational.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Meticulously tracked parts and equipment used on each job site.
  • Reduced maintenance accidents by 70% by enforcing strict
    safety standards
  • Setup dewatering systems like well point, deep well, french drain, over pumping & pumping tests.
  • High experience in hydraulic systems to be implemented in project needs.
  • Follow up asphalt equipment for asphalt paving process to avoid delay in project submitting.
  • Mobile screen unit operating for sand screening to be used in
    project works.

Plant Engineer / RO & WET MIX

COMBINED GROUP COMPANY-OMAN
ABU DHABI
07.2017 - 02.2019
  • Treatment of more than 5 million cubic meter of seawater by using RO plant.
  • Design & setup of reverse osmosis plant including location, pipes, fittings filters..etc. for optimum production & reduced breakdown time using SOLIDWORKS and AUTODESK INVENTOR software
  • Interpreted plans and specifications to support construction manager during project implementation
  • Used critical thinking to break down problems, evaluate solutions and make decisions to keep reliability of plant
  • Conducted research, gathered information from multiple sources and presented results.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Tested and analyzed equipment design and performance feasibility to determine potential ROI.
  • Inspected supplier sites and procedures to research suppliers and compliances.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Prepared action plans for problematic processes and assets.
  • Interpreted blueprints and technical drawings to analyze equipment requirement of design modifications.
  • Illustrated potential obstacles when conducting site assessments for planned projects.
  • Maintained plant activities in line with budget requirements.
  • Updated policies to reflect changing demands and improve performance, quality and efficiency of plant operations.
  • Scheduled maintenance and repair projects to maintain optimal performance of all equipment and systems.
  • Complied with applicable mechanical and electrical regulatory standards for RO & WET MIX plant operation.
  • Organized and managed maintenance staff to fulfill requirements via scheduling and delegation.
  • Calculated overall production costs by evaluating material, labor and other expenditures.
  • Swapped out materials and finishes in product line to alleviate performance issues and reduce material waste.
  • Designed compaction tests of finished CBM of wet mix plant to check for quality.
  • Identified problems and specific resolutions to fix defective, damaged or malfunctioning parts, assemblies, equipment and systems.
  • Followed established HSE and production policies with all areas of plant operations.
  • Observed equipment in operation, system activities and control readouts on continuous basis.
  • Tested samples of reverse osmosis purified water to assess conformance with strict operating tolerances.
  • Determined salinity issues related to RO plant machinery and conducted timely repair work to keep equipment up and running.
  • Tracked data about all aspects of production to assess areas in need of improvement.
  • Directed employees and related programs to maximize team productivity and facility output.
  • Collaborated with technical and administrative teams to develop and implement successful corrective plans.
  • Anticipated and addressed production problems, material shortages, equipment malfunctions and unavoidable delays.
  • Secured necessary permits and renewals to keep operations compliance with legal standards.
  • Recognized low-cost suppliers and managed deliveries to cut downtime and save costs.
  • Evaluated production schedules and orders to arrange required materials and plan staffing needs.
  • Production of more than 312000 Ton of CBM (cement based
    material)
  • Worked with senior leadership to complete under-budget management on complex issues.
  • Collected samples for laboratory analysis.
  • Worked flexible hours across night, weekend and holiday shifts

Mechanical Engineer Intern

COMBINED GROUP COMPANY
KUWAIT
07.2015 - 08.2015
  • Developed technical skills through training and shadowing experienced professionals.
  • Assisted with engineering calculations, design drawings, preliminary cost estimates and field visits to observe manufacturing progress.
  • Conducted cost-effective experiments with prototypes, documented results and delivered presentation to peers and professor.
  • Complied with government and corporate safety policies and regulations.
  • Studied cement manufacturing processes to improve overall knowledge.
  • Interfaced with project management team to prepare engineering submittals and work plans.
  • Documented survey information and organized data for review by senior engineers.
  • Worked closely with engineers and assisted with testing of cement products.
  • Served as point of contact during plant emergencies, overseeing disaster recovery and expediting restoration efforts.
  • Received and processed stock into inventory management system.
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.

Software

  • Solidworks
  • Autodesk inventor
  • CMMS
  • MS office

Education

Bachelor of Science - Mechanical Engineering

EASTERN MEDITERRANEAN UNIVERSITY
FAMAGUSTA - NORTHERN CYPRUS
02.2014 - 02.2016

Bachelor of Science - Petroleum Engineering

SYRIAN PRIVATE UNIVERSITY
DAMASCUS-SYRIA
10.2008 - 02.2012

Accomplishments

  • Supervised team of more than 50 members.
  • Increased company revenue 10% with contributions to construction of Doqum dry dock (IP4) by optimal production of wet mix & RO plant.
  • Increased efficiency of the batch plant by 5% with the implementation of wise use of raw materials.
  • Documented and resolved water treatment issues which led to
    increase the productivity up to 95% of the RO plant.
  • controlled more than 500 heavy equipment through preventive &
    corrective maintenances to achieve 410 villas in 18 Month.

Interests

  • Documentary programs
  • Tennis

Timeline

WORKSHOP & PLANT ENGINEER

COMBINED GROUP COMPANY - UAE
02.2019 - Current

Plant Engineer / RO & WET MIX

COMBINED GROUP COMPANY-OMAN
07.2017 - 02.2019
  • (ABET) Accreditation Board for Engineering & Technology
02-2016

Mechanical Engineer Intern

COMBINED GROUP COMPANY
07.2015 - 08.2015

Bachelor of Science - Mechanical Engineering

EASTERN MEDITERRANEAN UNIVERSITY
02.2014 - 02.2016

Bachelor of Science - Petroleum Engineering

SYRIAN PRIVATE UNIVERSITY
10.2008 - 02.2012

Certification

  • (ABET) Accreditation Board for Engineering & Technology

COMPLETED PROJECTS

  • Doqum dry dock;IP4 , Sultanate of Oman

Project value: 145 million USD


  • Al marfa project (410 villas construction & maintenance) , ABU DHABI, UAE

Project value: 341 million USD


  • Al marfa storm water drainage , ABU Dhabi , UAE

Project value: 6.5 million USD


  • Al reef storm water pipe line , ABU Dhabi , UAE

Project value: 95 million USD

ABDULLAH AWADMECHANICAL & PLANT ENGINEER