Summary
Overview
Work History
Education
Skills
Timeline
Generic
Abdul Wasit Khan

Abdul Wasit Khan

Telecommunication Expert Engineer / Manager
Dubai

Summary

Dedicated Honest Professional delivering large Scale Projects on time in
allocated Budget with high degree of accuracy ,resulting high Revenue to organization I have Ability to work in Multiple Domains and to adopt the new challenges .

Overview

10
10
years of professional experience
4
4
years of post-secondary education

Work History

Implementation and Acceptance Manager

HUAWEI TECHNOLOGIES CO UAE
Dubai
04.2016 - Current

UAE DU MBB 3G/LTE/5G / SRAN PROJECT

  • Preparation of the project's master Implementation and acceptance plans according to milestones and contractual PIP
  • Budgeting and cost realization management
  • Resource allocation and management
  • Risk and communication management
  • Scope and Change Management
  • Project Planning /management /Project Delivery
  • Interaction with Different Departments (Internal and External) to
    Collect and align data/terms/duration For project Delivery technically and Financially.
  • Project Progress Reporting daily / Weekly / Monthly from all
    Perspectives (team Performance / Revenue / Technical KPIs etc.) from survey , material , CR , installation and acceptance .
  • Customer relations/Subcontractor/Resource Management
  • Ensuring the installation Quality Standards and acceptance of installed Network in one go
  • Ensurance of Network Safety and EHS standards from on sites and remote teams.
  • plan preparation and fallow up from teams for clearance of Snags raised by FLM during PAT.
  • FAC / PAC Database, tracking, Clearing, claiming, invoicing and
    reporting
  • Preparation of sites qualified for PAC (provisional acceptance certificate)) and provide it to the BOQ team for preparation , Fallowing from Customer for approval
  • Preparation and update of FAC master tracker defining FAC status , dependency , owner , amount and clearance plan . Claiming the eligible FACs and sending to finance department for invoicing.
  • Multiple Reports Preparation/Submission for customer and Huawei Management on daily / weekly and Monthly basis.
  • Allocating responsibilities to team members / Sub Contractors
  • Trackers/Database Management.
  • Final Acceptance Certificate Closure
  • Planning for OSS Servers installation / Configuration / acceptance asper requirements.
  • New Wireless in/outdoor Site Designing Expert // Technical Site Survey and Technical Site Survey and Design report (TSSR / TSSDR)
    IBS/Outdoor Swap Solution provider for 3G/LTE/5G indoor/outdoor Site
  • Installation/integration Expert
  • Wireless Site Electrical / Solar Power solutions and troubleshooting /Alarms Troubleshooting
  • Microwave link installation/Commissioning / LOS Surveys and LOS
    reports
  • Genex Probe /Genex Assistant / TEMS Investigation/U2020/
    ImanagerPRS

Wireless Network Designing & Implementation Expert

HUAWEI TECHNOLOGIES CO UAE
Abu Dhabi
04.2014 - 04.2016

UAE ETISALAT WIRELESS NETWORK MODERNIZATION PROJECT;

  • Responsible for providing and proposing 2G/3G/LTE Macro, Micro and IBS Sites solutions(according to RF requirements as well) in order to swap Alcatel/Motorola/Ericson equipment with Huawei’s Equipment (BTS3900/3900L , APM30 , AC OMB , DC OMB , TP4860c , BBU DBS3900 , RRUs , BBU cards UMPT/WMPT etc , Rectifier , Battery bank , DCDUs , CPRIs , power/Grounding Cables , RF Dual/Triple/Quad Band Antennas ).
  • Supervised the all types of indoor & outdoor Wireless sites installation , Integration and Cutover.
  • 2G/3G/LTE Site integration expert, upgrading BBU Software. Uploading the script of all technologies in respective Cards/BBU to make the site visible to OMC.
  • Site Survey and Technical site survey and Design Report preparation and submitting on magic flow central IT system of Huawei, according to updated solution and preparing and submitting Material Request against Each site.
  • Successfully Performed Survey of VVIP Technical sites(including Palaces, Ministries offices , army/police premises etc) for swap/upgrading, arranging access for installation/ DT teams in Abu Dhabi area
  • Responsible for Reviewing and approving Subcontractor’s Teams site surveys, TSS&DR, installation and Guiding Teams for surveys/installation, commissioning/integration of 3G/LTE
  • Reviewing TSSDRs submitted by Huawei Engineers, Subcontractors Teams, and full authorized over acceptance and rejection of reports according to defined standard/swap solutions.
  • Trained All Engineers/Teams on Etisalat Modernization Project, Solutions, Standard Operation procedure and TSSR uploading on IT system, Site check list and Photo requirement.
  • Tracker updating for surveys , TSSDRs, installations , cutover, etc
  • Approving PO for subcontractors upon their completed activities
  • Responsible for fallowing up the transmission link status from Etisalat (Customer), collecting IPs from ETISALAT’s MNI System, updating IP sheet and sharing with the whole Project team.
  • Close coordination with Huawei Sites Engineers/Subcon implementation teams and Etisalat‘s Management to solve the issues on sites.
  • Presenting TSSRs to Customers for approving and acknowledgement to concerned department so as to proceed for Material Request.
  • Weekly meeting with Etisalat Management to discuss and fix the dates of implementation, and submitting the pre implementation work (Civil, Power, Transmission etc) Details.
  • Sites room location and access arrangement, helping Teams for smooth flow of work. Demonstrated respect, friendliness and willingness to help wherever needed
  • Daily reporting and weekly meeting with management for progress and coming week work improvement.
  • Proven ability to develop and implement creative solutions to complex problems.
  • Gained extensive knowledge in data entry, analysis and reporting.
  • Skilled at working independently and collaboratively in a team environment

RF PLANING AND OPTIMIZATION :

  • Worked as RF Engineer/Coordinator (Post Processing/DT & WT Data Analysis)
  • Managed RF project drive test teams for commercial launch drive test. and Main Customer interface for Drive Test reports Approval
  • RF optimization based on Drive test log analysis Cluster optimization, Daily/Weekly KPI reports for the region.
  • 2G/3G/LTE KPIs Monitoring/Plotting in excel sheet via iManagerPRS.
  • SSV Report preparation of IBS Comparison and O/D Sites for 2G, 3G and LTE.
  • Cluster Report preparation for 2G, 3G and LTE
  • Post IBS/Outdoor Sites Complete WT report preparation for 2G, 3G and LTE using Huawei GENEX Probe & GENEX Assistant 3.14 &3.15 and plotting all the parameters of 2G, 3G and LTE and analysis of plots.
  • Close coordination with Customer for Coverage and Call Drop issues, fallowing the complaint until completion and submitting complete analysis report to Huawei and Customer management.
  • Collecting all the completed Post IBS Reports and submitting to customer for review and acceptance on weekly basis.
  • Updating the master tracker containing IBS/Outdoor reports acceptance/rejection status and complete site info from Survey to final Report preparation.

ETISALAT-HUAWEI SMART PARKING PROJECT:

Complete Survey of parking area specifying space for sensors and installation of RF Antennas, RRUs, BTS and server.

Submitting the Whole proposal to Customer and fallowing up project until acceptance

Implementation Network and Wireless Engineer

LCC TechMahindra Middle East FZ LLC
Dubai
08.2013 - 03.2014

DU-HUAWEI LTE PROJECT 2013

  • Supervised Installation of LTE-4G Sites for DU LTE Project 2013 with New BTS (DBS3900), RF Antenna, RRU installation & BBU cutover as per Huawei Standards with quality of implementation & VSWR within acceptable range.
  • RF Antenna Swap from 3G Single polarized to Dual Polarized Antenna.
  • Huawei DBS3900 (LTE/E-Node B) Site integration with software upgrade, script upload and rectification of alarms by all snags clearance.
  • VSWR, RRU power (dbm) measuring and troubleshooting.
  • Assembling and installation of Hybrid Couplers, High & Low ODU Installation & commissioning of Hybrid MW links with Huawei RTN 900 series.
  • Software Commissioning of RTN950A, RTN950 & RTN620.
  • Performed Acceptance Test Procedure (PAT) for installed LTE Sites adn MW links.
  • Design LOS transmission plan for microwave LOS clearance (Path Survey, Balloon Test & Flash Test) with complete report preparation.
  • Suggest the height for microwave dishes both sides after conducting TS survey.
  • Generate path profile for MW-LOS clearance using PATHLOSS.
  • Performed survey work for DU LTE project 2013 with complete TSSR generation.
  • Performed IDU replacement(RTN620,910,950 to 950A),software, hardware(1+0 to 1+1 & 1+1to 2*1+1) upgrade of existing MW links
  • Performed 3G/4G traffic migration (AMS/DU-FIX/MW) activities.
  • Assigning & managing work by LCC’s subcontractor

Telecommunications Engineer

International System Engineering & Services (Pvt.) Ltd. Pakistan
Islamabad
10.2012 - 07.2013
  • Performed day-to-day monitoring, management, administration and Installation of Modern Telecom Equipment
  • Site BSS, LOS, POWER and MICROWAV Survey , Survey Report , Installation of 12volt (155A & 150A) & 2volt (400A) Batteries Bank and PAT (Provisional acceptance Test) of installed Batteries Bank.
  • Design LOS transmission plan for microwave LOS clearance (Path Survey, Balloon Test & Flash Test).
  • Suggest the height for microwave dishes both sides after conducting TS survey.
  • Generate path profile for MW-LOS clearance using PATHLOSS.
  • Installation and configuration of software for PDH & SDH links at Huawei, CMPAK project
  • Assembling and installation of Hybrid Couplers, High & Low ODU
  • Installation & commissioning of PDH, STM, XPIC and SD Links for Huawei
  • Installation , Software Commissioning and PAT of Huawei RTN 900 series RTN 910, 950 & 980
  • Commissioning of Huawei BTS (3900)
  • VSWR, RRU power (dbm) measuring and troubleshooting.
  • Walk Test For RF Coverage and Quality
  • RF Channel Optimization through TEMS Investigation 9.1.
  • BCCH Plot and Column Chart using MapInfo 8.5.
  • BCCH Handover and Reselection Test.
  • GPRS and EDGE Test.
  • GSM 900/1800 2W Wireless Broadband Repeater installation
  • Final RF Report For Approval from Customer


Education

Bachelor of Science - Electronics Engineering

Comsats University Islamabad , Abbottabad Campus
Abbottabad
03.2008 - 06.2012

MBA - Project Management

Lincoln University College
Malaysia
03.2023 - Current

Skills

    Planning and implementation

undefined

Timeline

MBA - Project Management

Lincoln University College
03.2023 - Current

Implementation and Acceptance Manager

HUAWEI TECHNOLOGIES CO UAE
04.2016 - Current

Wireless Network Designing & Implementation Expert

HUAWEI TECHNOLOGIES CO UAE
04.2014 - 04.2016

Implementation Network and Wireless Engineer

LCC TechMahindra Middle East FZ LLC
08.2013 - 03.2014

Telecommunications Engineer

International System Engineering & Services (Pvt.) Ltd. Pakistan
10.2012 - 07.2013

Bachelor of Science - Electronics Engineering

Comsats University Islamabad , Abbottabad Campus
03.2008 - 06.2012
Abdul Wasit KhanTelecommunication Expert Engineer / Manager