Summary
Overview
Work history
Education
Skills
References
Languages
Courses
Timeline
Generic
AHMED ALJEDAIL

AHMED ALJEDAIL

Abu Dhabi

Summary

Accomplished project management professional with extensive expertise in strategic planning and execution, adept at aligning projects with organisational objectives. Proficient in both Agile and Waterfall methodologies, ensuring optimal approach based on project needs. Demonstrates advanced project management skills, including scope definition, scheduling, resource allocation, and quality control. Skilled in budget management and cost control to maximise ROI. Exceptional stakeholder engagement abilities ensure clear communication and alignment of goals. Adept at risk management, identifying potential risks and implementing mitigation strategies. Strong leadership and team-building capabilities foster a collaborative work environment. Experienced in change management initiatives for smooth transitions to new processes. Excellent decision-making and problem-solving skills enhance project outcomes. Technically proficient with the latest project management tools for efficient tracking and reporting.

Overview

19
19
years of professional experience
2007
2007
years of post-secondary education

Work history

Vice President – Infrastructure & Roads

Aldar
Abu Dhabi
2023.05 - Current
  • Led strategic planning initiatives to enhance infrastructure development and operational efficiency.
  • Oversaw project management processes ensuring timely completion and adherence to quality standards.
  • Collaborated with cross-functional teams to drive innovation in road design and construction methodologies.
  • Developed and implemented best practices for project delivery, focusing on sustainability and safety measures.
  • Evaluated and improved existing workflows to optimise resource allocation and reduce operational costs.
  • Introduced innovative solutions with a focus on problem-solving and critical thinking skills.
  • Built strong networks within industry, opening new avenues for collaboration.
  • Established partnerships for expansion opportunities.

Senior Project Manager

Currie & Brown (CI) Limited
Abu Dhabi
2023.05 - 2026.02
  • Construction Works -Internal Roads and Infrastructure Works in Various Areas in Al Ain, UAE - (Stage 24, 25 & 26) in Al Ain
  • DHS. 750 million.
  • AECOM.
  • Aldar.
  • November 2023 - Present
  • The Project is a low-density Emirati housing development community, composed of several land uses, mostly being residential (2013 units), together with religious, schools, commercial, government, community facilities, open spaces, etc. spanning around 651 Hectares. The project scope consists of the following:
  • Roads, Infrastructure and Public Realms
  • Primary & Secondary Substations with a Switching Station.
  • The Creation of 262 Residential Lands in Al-Qou’ Area in Al Ain
  • DHS. 215 million.
  • AECOM.
  • Aldar.
  • November 2023 - Present
  • AlQou’a Project is a low-density Emirati housing development community, composed of several land uses, mostly being residential (262 units), together with religious, commercial, government, community facilities, open spaces, etc. spanning around 107 Hectares. The project scope consists of the following:
  • Roads, Infrastructure and Public Realms
  • Secondary Substations.
  • Development, Infrastructure and Public Realms for AlNoud
  • DHS. 1.5 billion
  • AECOM.
  • Aldar.
  • November 2022 - Present
  • AED1.5 billion
  • AlNoud Project is a low-density Emirati housing development community, composed of several land uses, mostly being residential (3017 units), together with religious, schools, commercial, government, community facilities, open spaces, etc. spanning around 651 Hectares. The project scope consists of the following:
  • Roads, Infrastructure and Public Realms
  • Primary & Secondary Substations with a Switching Station.

Infrastructure Project Manager

Fibrex Construction Group
Abu Dhabi
2016.05 - 2023.04
  • North Yas - Yas Living (NOYA).
  • DHS. 1.2 Billion.
  • Arcadis.
  • Aldar.
  • September 2021 till April 2023
  • Residential project comprised of more than 1200 villas spread across 3 phases NOYA, NOYA luma & NOYA Viva.
  • Each boasting its own community center with modern and contemporary designs. landscapes and infrastructure works includes construction of Roads, Sewerage, Storm water, Potable water, Telecom, Irrigation, 6 nos 11 Kv Sub stations, Underground Irrigation Reservoir and Pump station.
  • Al Reef II Development.
  • Infrastructure Project Manager.
  • DHS. 900 million.
  • Dorsh Gruppe DC Abu Dhabi.
  • Manazel.
  • November 2017 till August 2021
  • Residential project comprised of 860 villas consists of two and three bedroom villas spread across 4 areas, 4 community centers, open landscapes and infrastructure construction of Roads, Sewerage, Storm water, Potable water, Telecom, Irrigation and Sub stations.
  • Yas South Integrated Destination Resort (5 star Hotel) – Abu Dhabi
  • Construction Manager.
  • DHS. 980 million.
  • WSP.
  • Miral.
  • April 2018 till March 2019:
  • A visionary resort district located on the southern tip of Yas Island which includes waterfront, retail, restaurants, gardens, plazas, Construction of Internal Roads and execution of Sewerage, Storm water, Potable water, Telecom, Irrigation and Sub stations.
  • Khalifa University Campus Expansion – Abu Dhabi
  • Construction Manager.
  • DHS. 980 million.
  • ELITE DESIGN & ENGINEERING CONSULTANCY LLC
  • Khalifa University.
  • June 2016 till March 2017:
  • Khalifa University Campus Expansion
  • Abu Dhabi based campus was expanded by 132,000 sqm by the end of 2017
  • The new campus will house:
  • A large auditorium with a capacity of 500
  • A new student hub completes with restaurants, a gymnasium and other sporting facilities
  • Cutting edge classrooms, engineering laboratories and research facilities
  • The campus expansion will support Khalifa University’s rapidly growing community and will ensure that both future and current students have access to the highest quality of educational services, which will help to ensure KU achieves its goal of becoming an internationally recognized research university.
  • Khalifa University will continue to be a hub of creativity and innovation and a home to some of the brightest minds in the country.

Infrastructure Project Manager

Gulf Target Transportation and General Contracting (UAE)
Abu Dhabi
2010.01 - 2016.05
  • ADISC-Residential, Leisure and Commercial Compound Abu Dhabi.
  • Infrastructure Project Manager.
  • DHS. 1.2 Billion.
  • WS Atkins & Partners Overseas.
  • Private property management.
  • April 2013 till March 2016:
  • Residential & commercial project comprised of more than 420 villas and 8 towers, community centers, landscapes and infrastructure works
  • Maintenance of Miscellaneous Road Works in Khalifa city A and Khalifa city B
  • Construction Manager.
  • DHS. 40 million.
  • ECIL.
  • ADM.
  • February 2011 till May 2013
  • Maintenance of existing roads includes milling & relaying Asphalt, asphalt pothole, kerbstone, interlock, sign board and soil improvement.
  • Maintenance of Miscellaneous Road Works in Mussafah East and West Areas, Mohammed Bin Zayed City (Contract 21/2013)
  • Construction Manager.
  • DHS. 40 million.
  • ECIL.
  • ADM.
  • February 2011 till May 2013
  • Maintenance of existing roads includes milling & relaying Asphalt, asphalt pothole, kerbstone, interlock, sign board and soil improvement.
  • Explosive Storage Facilities, West Region Abu Al Abiad.
  • Senior project engineer.
  • DHS. 15 million.
  • Hill international.
  • ADNOC.
  • April 2010 till April 2011:
  • Execution of road works, fixing kerbstone, interlock, sign board and road marking.
  • Shuweihat 3 IP Al Rwaise – Abu Dhabi.
  • Project engineer.
  • DHS. 10 million.
  • TRANSCO
  • April 2010 till April 2011:
  • Execution of road works, fixing kerbstone, interlock and sign board and road marking.
  • Program of Parking Management.
  • Project engineer.
  • DHS. 18 million.
  • Parsons
  • DOT
  • January 2010 till September 2010:
  • Rehabilitation of car parking in Abu Dhabi city, kerbstone, interlock and sign board and road marking.

Infrastructure Site Engineer

Trans Horizon International Roads Contracting L.L.C
2007.03 - 2010.01
  • Al Nakheel Development Area Project-AJMAN.
  • Site engineer.
  • DHS. 60 million.
  • Khatib & Alami.
  • AJMAN MUNICIPLITY.
  • March 2007 till January 2010
  • Storm water, sewerage, street light. In addition, road maintenance, earthwork, traffic signals, milling and widening of existing asphalt

Education

B.Sc. - Civil Engineering

Islamic University-Gaza
Gaza

Joint Master program - Infrastructure Engineering

University of Macklin Ford

Skills

  • Strategic Planning and Execution: Expertise in developing and implementing strategic plans that align with organizational objectives, ensuring project deliverables meet the highest standards
  • Agile and Waterfall Methodologies: Proficient in both Agile and Waterfall project management methodologies, able to apply the best approach based on project requirements and team dynamics
  • Advanced Project Management: Deep understanding of advanced project management concepts and practices, including scope definition, scheduling, resource allocation, and quality control
  • Budget Management and Cost Control: Skilled in managing large budgets, optimizing resource use, and controlling costs to maximize project ROI
  • Stakeholder Engagement: Exceptional ability in engaging and managing stakeholders at all levels, ensuring clear communication, understanding, and alignment of project goals and expectations
  • Risk Management: Adept at identifying potential risks, conducting risk assessments, and implementing mitigation strategies to minimize impact on project timelines and outcomes
  • Leadership and Team Building: Strong leadership skills with a focus on team building, talent development, and fostering a collaborative and inclusive work environment
  • Change Management: Experienced in leading change management initiatives, ensuring smooth transition and adoption of new processes and systems within projects
  • Decision Making and Problem Solving: Excellent decision-making abilities, coupled with strong analytical and problem-solving skills, enabling effective resolution of complex project challenges
  • Technical Proficiency: Up-to-date with the latest project management software and tools, enhancing efficiency and effectiveness in project tracking and reporting

References

References provided upon request

Languages

English
Proficient (C2)
Arabic
Proficient (C2)

Courses

  • Management Skills.
  • AutoCAD.
  • Ms Project Program.
  • FLYPS Program (In design pumps).
  • Engineering Specifications for Construction.
  • Quality is the first of our goal.

Timeline

Vice President – Infrastructure & Roads

Aldar
2023.05 - Current

Senior Project Manager

Currie & Brown (CI) Limited
2023.05 - 2026.02

Infrastructure Project Manager

Fibrex Construction Group
2016.05 - 2023.04

Infrastructure Project Manager

Gulf Target Transportation and General Contracting (UAE)
2010.01 - 2016.05

Infrastructure Site Engineer

Trans Horizon International Roads Contracting L.L.C
2007.03 - 2010.01

Joint Master program - Infrastructure Engineering

University of Macklin Ford

B.Sc. - Civil Engineering

Islamic University-Gaza
AHMED ALJEDAIL