Forward-thinking Construction Manager with excellent organization and leadership abilities. Builds relationships quickly to engage teams and clients in activity for continual project progress. Calm under pressure to deliver project completion within agreed constraints.
Driven professional with robust background in project management and team leadership. Demonstrates strong organisational skills and keen problem-solving abilities. Poised to enhance project efficiency and foster collaborative work environments.
Experienced Construction Manager with knack for leading diverse teams and ensuring project delivery on time and within budget. Known for driving significant improvements in site safety and operational efficiency. Successfully enhanced client satisfaction through strategic planning and meticulous attention to detail.
Organised construction management professional with extensive experience running productive, profitable sites. Motivated to deliver within cost, timeframe and quality constraints through strategic project planning. Hardworking and passionate to lead high-performing teams by example.
· Offshore, Basic H2s (OPITO APROVED)
· Basic H2S Awareness & EEBA Level 2
· Basic offshoreSafety Induction & Emergency Training (OPITO APROVED).
· Offshore Sea Survival (OPITO APROVED)
· ADNOC Document For Safe Driving
· FMS office Enterprise 2000 Plus Ver.2.2105
MAIN PROJECTS PARTICIPATED
OFFSHORE PROJECTS:
Ø Conversion of ACPT -1 Level 3 Recreation & Majlis to 10 Rooms Similar to Level 2 Rooms & Gymnasium Extension at ACPT-2 Level 5.
Client: ZADCO
Field: UZ (ACPT-1 &ACPT-2)
Year: 2012
Scope of Work:
1. Steel structural repairing and modification inside accommodation platform ACPT-1 for installation of new 10 accommodation rooms
2. Extension Steel structural of accommodation platform ACPT -2 nearest helideck for Gymnasium Extension.
3. Lifting operation for steel structural and HVAC equipment’s nearest helideck.
Ø SO.847377 - Conversion of PGP Transformer Room to Electrical Workshop and Supervisor’s Offices
Client: ZADCO
Field: UZ
Year: 2012
Scope of Work:
1. Demolishing of existing steel structural of PGP Transformer Room.
2. Modification of existing steel structural of PGP Transformer Room.
3. Installation of new HVAC system for new Electrical Workshop and Supervisor’s Offices
Ø UAD Full Field Development Project – Phase 1 (installation of ESP at WHP-07 & WHP-15)
Client: ZADCO
Field: Abu Dhabi – UAD Field
Year: 2013-2014
Scope of Work:
1. The scope comprised of carrying out residual engineering, procurement, installation and commissioning of the enabling works related to the installation of ESP (Electrical Submersible Pumps) at WHP-07 & WHP-15 including structural extension, installation of new electrical rooms, mechanical and piping works upstream of the ESP as well as associated E&I works.
2. The scope also included installation of nine segments of subsea composite cable between different platforms using DP-2 cable laying ship.
3. All required marine spread (accommodation barge, offshore support vessels, anchor handling tugs, towing tug, crew boats, diving support vessels and geotechnical survey vessels) was part of the scope of work
Ø ADGAS / EPC Works for the./Replacement of Obsolete Caravans in Jimi ( Das Island
Client: ADGAS Field: Das Island
Year: 2015 -2016
Scope of Work:
1. Installation of new accommodation caravans on Das Island including all Steel Structural, Foundations , Piping Cable Bulling and A/C Installation
Ø ADMA / EF-031 revamp of HVAC system in USAAP & PGB at USSC & ZWSC.
Client: ADMA
Field: USSC & ZWSC
Year: 2017 -2018
Scope of Work
1. Extension Steel structural of accommodation platform USAAP.
2. Installation of new steel structural platform for installation of new A/C package units.
3. Installation of HVAC system on USAAP & PGB at USSC & ZWSC.
Ø ADMA OPCO / REFURBISHMENT / UPGRADE of PGB ventilation room and HVAC systems at GTP b10 & USEAP (offshore)
Client: ADMA
Field: USSC
Year: 2018
Scope of Work
1. Repairing and replacing of all existing steel structural for PGB ventilation room.
2. Installation of new steel structural for replacement of existing A/C package units for GTP b10.
3. Installation of HVAC system for GTP b10.
4. Installation of HVAC system including all steel structural related at USEAP
v ADNOC / EPC SCOPE OF FOUR (4 NOS.) SITE SCHEMES IN UPPER ZAKUM FIELD
Client: ADNOC offshore Field: Upper Zakum
Year: 2022
Scope of Work
v E1085- PACKAGE A - EMERGENCY DIESEL GENERATOR (EDG) REPLACEMENT PROJECT
UZCC
• Replacement of the existing EDG’s (1x1300 KW) with associated auxiliaries and generator control panel. New EDG rating is 1 x 1800kw.
• Replacement of 380V Ess. Switchboard (250-SB-012).
• Retrofit of following switchgears:-
1- 380V Essential HVAC Purge MCC (250-MCC-021E)
2- 380V Essential HVAC Purge MCC (260-MCC-021E)
3- 380V Essential HVAC Purge MCC (290-MCC-021E)
• Temporary Switchgear inside temporary container
• All related modification work to the new EDG.
• All related modification in the instrumentation systems, (DCS, ESD/ F&G).
• Room extension and additional ventilation AHU.
• Extension of NOVEC system in EDG room.
ACPT 1
• Replacement of the existing EDG’s (2x1300 KW) with associated auxiliaries and generator control panel. New EDG rating 2 x 1300 kw..
• Temporary EDG
• All related modification works to the new EDG.
• All related modification in the instrumentation systems. (DCS, ESD/ F&G).
v E1199 - PACKAGE B - FIRE & GAS REPLACEMENT PROJECT
ACPTs 1 & 2
• Supply of additional F&G detectors and devices and Relocation of existing F&G detectors and devices
• Modification of existing DCS system (OEM: Honeywell).
• Modification of existing F&G/ ESD system (OEM: Honeywell).
• Modification of existing FACP (OEM: Tyco).
• Modification of existing Remote Alarm Panels (YRAPs) at ACPT-2 (OEM: Protec-Fev).
• Supply of additional system and Marshalling cabinet at ACPT-1 for F&G system (OEM: Honeywell)
• Modification of existing DCS system at FCC located at ACPT-1 Level-6 (OEM: Honeywell).
• Modification of existing UPS distribution board to feed the new F&G cabinet.
• New NOVEC System in Battery Charger room at ACPT-1, Level 6.
• Existing Heat Detectors to be changed with Flame detectors at ACPT-1 & 2 Level 5
•
UZCC (GTP/CSP, PGP & WIP)
• Supply of additional F&G detectors and devices and Relocation of existing F&G detectors and device
• Modification of existing DCS system (OEM: Honeywell).
• Modification of existing F&G system, Hard Matrix panel and Momentum PLC (OEM: Schneider).
• Replacement of existing Remote Alarm Panels (YRAPs)
• Supply of additional Marshalling cabinet at PGP for F&G system (OEM: Schneider).
Satellite Platforms (NSP, SSP & WSP)
• Supply of additional F&G detectors and devices and Relocation of existing F&G detectors and device
• Modification of existing DCS system (OEM: Honeywell)
• Modification of existing F&G system, Hard Matrix panel and Momentum PLC (OEM: Schneider).
• Replacement of existing Remote Alarm Panels (YRAPs) and sounder and Beacons.
• Modification of existing LV Switchboards with respect to the new UPS incomer rating
• Modification of Frangible network at NSP and SSP
v E1151 - PACKAGE C - SEWAGE TREATMENT PLANT (STP) REVAMP
v E1691 - PACKAGE D - DEBOTTLENECKING OF WATER INJECTION
UZCC/WIP
• Residual and Construction Engineering
• Upgrade Additional one Fine Filter (Filter F)
• Install 6th Booster Pump
• Upgrade of Chemical Injection Systems by the addition of scale inhibitor down stream of Winning Pumps and replacement of Scale Inhibitor injection pump (260-P-008A/B).
• Modification of existing Sequencer PLC system and Installing new field instruments.
• New Local Control Panel for Fine Filter
• Modification of existing PMS system.
• Modification of existing Switchgears.
• Modification of existing DCS system.
• Detailed Engineering and the AFC Package had been carried out by Company.
• Company free issue materials is 5 nos. On-Off Valve and 6th Booster Pump.
ONSHORE PROJECTS:
Ø BROG / HVAC Works Borough 2 Building - Technical Ruwais.
Client: BROG
Year: 2009
Ø SBM Atlanta TDS 2000 & TDS 2500, Three Semisubmersible Drilling Griggs (All to ABS Class),
Client: SBM Atlanta
Year: 2010
Ø ADMA OPCO /Architectural Outfitting and HVAC work of 200 Man Accommodation for.
Client: ADMA
Year: 2010 /2011
Ø SBM Atlanta & GPC / Hull Outfitting Deep PA Nuke PFC.
Client: SBM Atlanta
Year: 2011
Ø McDermott / D-5763 Karan Gas Field Development Offshore Platform and Subsea Pipelines Project for Saudi ARMCO.
Client: Saudi ARMCO
Year: 2016
Ø McDermott / New architectural & HVAC works for ADMA - OPCO ZAKUM water injection upgrade.
Client: ADMA
Year: 2016 /2017
Ø NPCC / TECHNICAL BUILDING (switchgear building) for project no. 7243/7244.POGS / Abu Dhabi - Umm Shaif - Ingersoll Rand compressor.
Client: ADNOC Onshore
Year: 2019
Ø NPCC / SUBCONTRACT FOR ARCHITECTURAL AND HVAC WORKS for technical buildings associated with once r-series 5 well platforms & pipeline project.
Client: Armco KSA
Year: 2019
Ø ADNOC Onshore / EPC FOR UPGRADATION AND MODIFICATION WORKS FOR pipelines & terminals project tips for up gradation and modification works for pipelines & terminals project.
Client: ADNOC Onshore
Year: end of 2019, 2020 & 2021.
Work Packages:-
1. Package 1: EPC for the Segregated Compressor Starter Panel at MOT,IPS and MPS.
2. Package 2: EPC for Replacement of 15 Nos. Pig Signallers
3. Package 3: EPC for Passive Fire Protection of all stations
4. Package 4: EPC for 415 V Switchgear Replacements at Jebel Dhanna
5. Package 5: Concrete Valve Pit &, Oil Chamber Repair.
Site Locations:-
1. Main Oil Terminal (MOT) located at Fujairah
2. Intermediate Pump Station (IPS) in Sweihan
3. Main Pump Station (MPS) in Habshan area & MP-21
4. Jabel Dhanna, Oil Tank Farm
5. BVS Locations between MOT and MPS
Site Location
Package 1
Package 2
Package 3
Package 4
Only at Jabel Dhanna
Package 5
(MOT) at Fujairah
2 No. Motor starter panels with Structural steel sun shade
1 Nos Pig Signaler with related Civil Works
PFP for Steel Structure
PFP for Actuator Vales/Hydraulic Panels
J30/H60 Fire Wall
SUBSTATION 1:
New room extension including installation of new electrical DB & MOV DB-4401-01, Lighting and HVAC System
NewMSWG-4401 Switchgear
Fire Extinguishers
& Electrical Safety Kit
Transfer of loads
Demolition works
Fire water valve pits (111 Nos.)
Oil chambers/ manholes (69 nos.)
(IPS) at Sweihan
1 No. Motor starter panels
with Structural steel sun shade
2 Nos Pig Signaller with related Civil Works
PFP for Steel Structure
PFP for
Actuator Valves/Hydraulic Panels
• J30/H60 Fire Wall
SUBSTATION 2:
New foundations for New MCC-4408
NEW MCC-4408
Transfer of loads
Demolition works
(MPS) at Habshan
1 No. Motor starter panels
with Structural steel sun shade
MP21 5 Nos Pig Signaler
MPS – 2 Nos Pig Signaller
with related Civil Works
PFP for Steel Structure
PFP for Actuator Valvs/Hydraulic Panls
J30/H60 Fire Wall
MAIN SUBSTATION:
New foundations
Cable Trench
New MSWG-4411 415V Switchgear
New MSWG-4413 415V DB
New DB-4554 110VDC DB
Marshalling Panel XMR-4413-01
Load transferring
Fire Extinguishers & Electrical Safety Kit
Upgrade of HVAC System
Demolition works
BVS Locations
5 Nos Pig Signaller with related Civil Works
PFP for Actuator Valv s/Hydraulic Panls for BVS 1 to 10.
Jabel Dhanna, Oil Tank Farm
Ø NPCC / SUBCONTRACT FOR EPC WORKS FOR TECHNICAL BUILDINGS (ZULP EDP & ABSF EDP)
FOR PROJECTS 9226 AND 9228
Client: Armco KSA
Year: 2021
ARCHITECTURAL SCOPE.
Detailed engineering supply and installation of:
§ Fire Rated Insulation Internal & External (including pins, wire mesh, washers, under deck weather protection and all accessories)
§ External & internal walls Lining panels
§ External & Internal Doors
§ Screed Underlayment, Floor Finishes & Skirting.
§ GIS and 13.8KV Bus duct penetrations
§ Mechanical & Electrical and equipment supports for CCTC-supplied equipment
§ Loose Furniture
§ Architectural Safety Signs
§ Provide weight inputs pertaining to CCTC scope of work
HVAC SCOPE :
Detailed engineering, supply, installation, Testing and Final Air Balancing and pre-commissioning and commissioning of HVAC System.
§ HVAC System Comprises of Main Equipment's and ancillaries as follows:
§ Package Air-conditioning Units for ABSF EDP
§ Split Air Conditioning Units For ZEDP-1
§ EPCI of HVAC System ancillaries include External and Internal Ducting (including Duct system and Ducting accessories with all motorized and manual dampers / duct inline accessories / temp. controllers, terminal duct heaters, filters, HVAC control panels, Battery room Exhaust Fans and accessories, sound attenuators, air outlet & inlets, HVAC instruments/transmitters, JB’s, penetrations for HVAC, supports and painting of supports, insulation for equipment and duct, piping, HVAC drains etc.).
§ Factory Acceptance Test (FAT) for following equipment are required:
§ Package Air-conditioning Units
§ Split Air Conditioning Units
§ HVAC Power Panel
§ HVAC Control Panel
§ Design , supply and inside building installation of all piping works related to HVAC drain
E & I RELATED TO HVAC SCOPE
Engineering, Procurement, Supply, Installation, Testing and Commissioning for:
• HVAC Package Unit Local Control panel
• HVAC Power Panel and Fans Starter Panels
• HVAC DDC based Control Panels.
• HVAC instruments
• HVAC related cables, cable trays, Junction boxes, Isolators, ESPB, cable glands, MCTs, Earthling system and accessories.
• Factory Acceptance Test (FAT) for following equipment are required:
• Package Air-conditioning Units including LCP
• HVAC Power Panels
• HVAC Exhaust Fans Starter Panels
• HVAC Control Panels
E& I SCOPE
Engineering, Procurement, Supply, Installation, Testing and Commissioning for:
§ 400/230VAC Distribution Boards for Lighting & Small Power with all required upstream and downstream work including all required cables, cable glands, cable trays, MCT’s and accessories.
§ Normal lighting, emergency lighting and small power sockets inside the Building (RTU Termination room, Switchgear room and Battery room)
§ Lighting on the external building walls.
§ Cables, Cable Trays / Ladders, Conduits, Junction boxes, supports, MCT and accessories for CCTC supplied equipment.
§ Earthling for lighting, Sockets, Junction boxes 400/230VAC Distribution Boards, etc. Supplied and Installed by CCTC
FIRE & GAS SCOPE
§ Installation and pre-commissioning of free-issued Fire Alarm devices (Smoke Detectors, Manual call points, Visual & Audible Alarms) inside the building and on HVAC air intake.
§ Installation and pre-commissioning of free-issued Fire Alarm devices cables and cable glands. All related Consumables such as cable tags, ferules, lugs, etc. shall be under CCTC scope.
§ Design, supply & installation of cable trays, cable tray supports, MCT’s & accessories for fire alarm system inside the building and on HVAC fresh air intake.
SAFETY & FF SCOPE
§ Design, supply and installation of safety signs
§ Installation of free issued firefighting equipment and lifesaving equipment
TELECOM. SCOPE
§ Installation and pre-commissioning of free-issued Telephone and Data outlets (Wall mounted) inside the building.
§ Installation and pre-commissioning of free-issued Telephone and Data outlets cables and cable glands. All related Consumables such as cable tags, ferules, lugs, etc. shall be under CCTC scope.
§ Design, supply & installation of cable trays, cable tray supports, MCT’s & accessories for Telephone and Data outlets.
MECH./ PIPING SCOPE
§ Design, supply & installation of Drain piping inside the building and up to tie-in point.
§ Construction Isometrics shall be provided.
§ Design, supply & installation of Piping related to other works inside the Building (Any utility piping/plumbing) and up to tie-in point, including the tie-in flange outside the Building.
Lifting Responsibilities :
Ø Monitoring and inspection of equipment on site and implementation of HSE policies.
Ø Approved Loading and unloading of construction materials from supply boats on offshore or long trailers on onshore based on request apply by appointed person ( A.P) .
Ø Reviewing with HSE engineer and appointed person (A.P) of Task Risk Assessment and Coordinate available resources at site to ensure upkeep of cranes and lifting equipment and provide safe and efficient lifting services to meet the requirements of Operations, Maintenance and Projects.
Ø Management of mechanical systems such as pedestal cranes and other loose lifting equipment at site; ensuring lifting equipment and relevant personnel have valid and current certification.
Ø Conduct safety and tool box talks, attend safety meetings, conduct safety observation tours.
Ø Ensure compliance to all relevant safety, quality and environmental management policies, procedures and controls to guarantee safety, legislative compliance, delivery of high quality products/service and a responsible environmental attitude.
HSE Responsibilities
Ø Daily coordination with site teams for WMS requirements, and coordinate the same with client accordingly.
Ø Participating in TRA preparation with the HSE engineer.
Ø Ensure that hazards are identified and action plans in place for rectification.
Ø Conducting regular toolbox talk for a major or routine activity.
Ø Participating in accident investigation and follow-up recommendation to prevent the incident occurrence.
Ø Maintaining daily housekeeping & complying with waste management procedure.
Ø Implementing emergency plan in liaison with client HSE dept.
Ø Supporting HSE engineer during site HSE meetings.
Ø Encouraging Near misses reporting and avoids blaming culture.
Monitoring HSE performance of employees and sub-contractors.