Summary
Overview
Work History
Education
Skills
Languages
Timeline
SoftwareEngineer
Ahmed Mohamed Ali Ibrahim

Ahmed Mohamed Ali Ibrahim

Abu Dhabi,UAE

Summary

Accomplished Surveying engineer with extensive expertise in road and infrastructure construction principles, pavement design, and grading design.

Proficient in drainage systems, traffic control plans, and materials testing procedures. Demonstrated ability to provide technical guidance and ensure compliance with engineering standards and regulations.

Skilled in engineering design review, Shop drawing preparation, project management, material submittals, quality control processes, and shop drawing.

Adept at using advanced surveying techniques including RTK survey and static survey for topographic mapping and underground utility mapping. Experienced in utilising Civil 3D, Trimble business canter, ArcMap and AutoCAD for precise modelling and construction forecasting.

Strong background in fieldwork coordination,Measurement and Valuation, quantity estimation, Preparation of BOQ, and database management.

Proven track record of effective decision making, scheduling, risk assessment, budget control, team leadership, negotiation expertise, and BIM understanding.

Overview

16
16
years of professional experience
4
4

Years of university education

Work History

Projects Director-Engineering Director

Ramah General Contracting L.L.C
Abu Dhabi, UAE
09.2020 - 01.2025
  • Roles and responsibilities
  • Having a very strong knowledge and experience of pavement design, drainage systems, traffic control plans, and materials testing procedures.
  • Providing technical guidance and support to the engineering team.
    Ensuring the project adheres to all relevant engineering standards and regulations.
  • Reviewing and approving engineering designs and plans.
    Leading project's technical engineers staff.
  • Preparing RFIs and cooperating with the Contract department to prepare claims and variations orders.
  • Tracking approved drawings from Consultative and municipality.
    Reaching solutions to problems that may arise during the work before implementation, leading to achieving the shortest possible period and avoiding performance issues.
  • Cooperating with other department heads such as Estimation, Quantity Surveyor, Quality Control, Health, and Safety departments.
    Coordinating with various stakeholders, including engineers, surveyors, contractors, and government agencies.
  • Surveying Techniques: More than 16 years of experience in the surveying field using all kinds of surveying technology to establish site control, perform grade checks, and ensure construction adheres to plans. Responsibilities include:
  • Topographic survey, OGL maps, contour maps, and calculating cut and fill.
  • Creating road design surfaces, alignments, cross-sections, profiles, corridors, and setting out.
  • Designing earthwork projects that reference surface terrain and balance cut and fill quantity.
  • Exporting site datum for the site construction team.
  • RTK and Static survey.
  • Supervising the Surveying team to control the full site by making Traverse for the control point to cover all sites and give more accuracy up to 10 mm.
  • Knowing the GIS requirements for each authority section.
  • Project's
  • AL AMRAH ENABLING WORKS | August 2024 - To Date | Duration: 10 Months | Project Value: AED 235 Million | Project by Al Ain Municipality | Enabling work
  • LAND LEVELING AND GRADING WORKS FOR
    FARMS IN NAHEL B AREA
    | January 2024 - June 2024 | Duration: 6 Months | Project Value: AED 36 Million | Project by Al Dar Properties | Main Contractor: Nail and bin Harmal | Enabling work
  • Construction of sewer and stormwater line in Al Ain distributed areas project | December 2023 - To Date | Duration: 12 Months | Project Value: AED 139 Million | Project by Al Dar Properties | Main Contractor: AL Fahjan | Infrastructure work
  • Construction of new road in Liwa Tal mareeb | July 2023 - December 2023 | Duration: 5 Months | Project Value: AED 10 Million | Project by Al Dar Properties | Main Contractor: Noor Al Sahara | Road work
  • Construction of sewer and stormwater line in Reem Hills project | June 2023 - To Date | Duration: 12 Months | Project Value: AED 39 Million | Project by Al Dar Properties | Main Contractor: National Projects Company | Infrastructure work
  • Construction of new road in Abu Alabiad area | January 2022 - June 2023 | Duration: 23 Months | Project Value: AED 8 Million | Project by Al Dar Properties | Main Contractor: Nail and bin harmal | Road work
  • Damac Lagoon stage 1 and 2 | December 2021 - November 2023 | Duration: 23 Months | Project Value: AED 65 Million | Project by Damac | Main Contractor: RMB | Cut and fill 6 Million of material (Earthwork)
  • Etihad rail way package D HJR Ch10+000 to 26+000 | July 2021 - December 2021 | Duration: 6 Months | Project Value: AED 51 Million | Project by Etihad Railway | Main Contractor: NPC / CRCC JV | Constriction of rail Core embankment includes all foundation layers.
  • Solar park at Dhafra Area | July 2021 - June 2022 | Duration: 6 Months | Project Value: AED 23 Million | Project by Dhafra Power | Main Contractor: CEMC / China 8 | Grading and enabling of site 5 Million SQ.M.
  • Liwa Tal Mareeb new road | July 2021 - September 2021 | Duration: 2 Months | Project Value: AED 7 Million | Project by Al Dar | Main Contractor: NBHH | Road construction for 8 KM length.
  • Upgrading of an existing link road from E11 to military airbase | September 2021 - February 2022 | Duration: 5 Months | Project Value: AED 18 Million | Project by Al Dar | Main Contractor: NBHH | Road construction for 18 KM length.
  • Riyadh City South Phase 4 - Infrastructure and Streetscape | September 2021 - October 2022 | Duration: 11 Months | Project Value: AED 55 Million | Project by Al Dar | Main Contractor: Norul Infrastructure and road work.
  • Etihad railway package A | January 2020 - November 2021 | Duration: 23 Months | Project Value: AED 45 Million | Project by Etihad Railway | Main Contractor: CSCC / SK JV | Constriction of rail core embankment includes all foundation layers.

Contracting Division HEAD

ABDULLA ALQAMZI Transport & general contracting
Abu Dhabi - AlAin, UAE
04.2014 - 08.2020
  • Roles, responsibilities and achievements
  • Improved team productivity by implementing efficient work schedules.
  • Coordinated hiring, recruitment and training strategies to build successful administrative team.
  • Devised staff succession plans to enable professional development.
  • Oversaw procurement processes, ensuring quality control and cost-efficiency.
  • Set strategic objectives aligned with business vision and mission.
  • Developed empowering employee culture focused on equipping staff to independently meet customer needs.
  • Project's
  • Construction of internal road and infrastructure works at Shamkha Area | August 2018 - July 2019 | Duration: 11 Months | Project Value: AED 18 Million | Project by Musanda | Main Contractor: Bin Hafiz | Infrastructure and Road construction.
  • NFPC Mega Plant at KIZAD Sector KHIA8, Plot 65, Khalifa Industrial Zone | September 2017 - February 2019 | Duration: 14 Months | Project Value: AED 25 Million | Project by NFPC | Main Contractor: CES | Road construction.
  • YAS ACRES DEVELOPMENT (Phase One) | November 2016 - August 2017 | Duration: 10 Months | Project Value: AED 50 Million | Project by Al Dar | Consultant: AECOM | Main Contractor: Bauer | Grading and Enabling Works
  • NFPC Mega Plant at KIZAD Sector KHIA8, Plot 65, Khalifa Industrial Zone | April 2016 - June 2016 | Duration: 6 Months | Project Value: AED 4.5 Million | Project by NFPC | Main Contractor: NSCC | Grading and Enabling works.
  • Improvement of Mafraq to Al Ghwaifat Border Post Highway Section 3A: Baynounah Forest to Al Mirfa | May 2015 - December 2015 | Duration: 5 Months | Project Value: AED 30 Million | Project by Musanda | Consultant: Parsons | Main Contractor: Al JABER | Road construction.
  • AL-RAHA BEACH DEVELOPMENT INFRASTRUCTURE THIRD PARTY PLOTS-AL DANA ISLAND NORTH AREA PROJECT | July 2015 - November 2015 | Duration: 5 Months | Project Value: AED 5 Million | Project by Al Dar | Consultant: HYDER | Main Contractor: NPC | Road construction.
  • GRADING AND ENABLING OF WAHAT AL ZAWEYA Project | April 2014 - April 2015 | Duration: 12 Months | Project Value: AED 49.5 Million | Project by Wahat Al Zaweya | Consultant: HYDER | Grading And Enabling

Survey Engineer

Al Fara'a General Contracting CO, U.A.E.
Abu Dhabi, UAE
05.2010 - 04.2014
  • Roles and Responsibilities
  • Managed site visits for thorough data gathering and analysis.
  • Advised on technical, aesthetic and economic aspects for well-informed map production.
  • Minimised project risks, conducting structural monitoring to ensure maximum safety and stability.
  • Performed field calculations to complete assessments.
  • Utilised CAD software proficiently, improving the design process.
  • Followed local, regional and national guidelines.
  • Worked with clients and stakeholders to understand project requirements and specifications.
  • Maintained up-to-date knowledge of industry trends for continuous professional growth.
  • Fostered strong relationships with existing and new clients for increased satisfaction.
  • Updated maps and charts using information gained by technological advancements.
  • Drafted detailed drawings using AutoCAD to aid in decision making processes.
  • Created maps, sketches and charts to analyse data.
  • Supervised and guided field staff to perform tasks and follow protocols.
  • Provided accurate technical support for land development projects.
  • Projects
  • WQAF COMMERCIAL BUILDING in Abu Dhabi | May 2013 - April 2014 | Duration: 12 Months | Project Value: AED 324 Million | Project by The Crown Prince Court Abu Dhabi | Project Management: KEO INTERNATIONAL | Project Consultant: HEBERGER ENGINEERING | 5 basement + G + 2 Mezzanine 29 FLOOR
  • ADNIC - Three Buildings at Khor Al Raha in Abu Dhabi | September 2011 - April 2013 | Duration: 20 Months | Project Value: AED 215 Million | Project by ALDAR PROPERTIES | Project Consultant: DAR AL-HANDASA | 2 basement + G + 7 FLOOR.
  • AL AIN Labor village in Al Ain | May 2010 - September 2011 | Duration: 17 Months | Project Value: AED 155 Million | Project by ALDAR PROPERTIES | Project Consultant: Architecture & Planning Group | 26 BUILDING (G + 3 Floor) + Mosque + 5 play yard + 5 sub-station

Senior SURVEYOR

M/s. AL Nile Janobi Construction & Irrigation Est.
Al Ain, U.A.E.
01.2009 - 03.2010
  • Project's
  • .B963-Development and Beautification of Municipality Street from Al Jimi Wadi Bridge Area to Al Masoudi Area
  • Landscaping of some streets in AL AIN by Non-Plant materials
  • Improved measurement accuracy with thorough on-site investigations.
  • Compiled data from satellite imagery, survey data and aerial photographs to produce maps and charts.
  • Implemented new survey techniques to improve efficiency.
  • Fostered strong relationships with existing and new clients for increased satisfaction.
  • Created thematic maps to present, organise and categorise survey data.
  • Read and utilised topographical data to complete analysis of land.
  • Created maps, sketches and charts to analyse data.
  • Conducted detailed site surveys for project feasibility studies.

Education

Bachelor's degree - geography and geographic information system (Surveying and mapping)

Alexandria University | Faculty of Arts
Egypt
09.2004 - 06.2008

Skills

  • Technical Skills
  • Road and Infrastructure Construction Principles Pavement Design Grading Design Drainage Systems Traffic Control Plans Materials Testing Procedures Technical Guidance Engineering Standards and Regulations Engineering Design Review Project Management Material Submittals Quality Control Processes Shop Drawing Modeling Infrastructure works Construction forecasting Underground utility mapping Database management BIM understanding
  • Surveying Techniques
  • Topographic Survey Topographic mapping OGL Maps Contour Maps Cut and Fill Calculation Road Grading Surfaces Alignment Cross-Sections Profiles Corridors RTK Survey Static Survey Machine Control Technology GIS Requirements Surveying instrumentation mastery Topographic data analysis Surveying technology mastery Mapmaking Topographic mapping
  • Leadership and engineering Skills:
  • Decision making Scheduling Risk Assessment Budget control Team Leadership Quantity estimation Measurement and Valuation Negotiation expertise Geostatistical analysis
  • Software
  • Civil 3D
  • Trimble Business Centre
  • AutoCAD
  • GIS ArcMap
  • NAVIS WORK

Languages

English
Advanced
Arabic
Proficient (C2)
Urdu
Beginner

Timeline

Projects Director-Engineering Director

Ramah General Contracting L.L.C
09.2020 - 01.2025

Contracting Division HEAD

ABDULLA ALQAMZI Transport & general contracting
04.2014 - 08.2020

Survey Engineer

Al Fara'a General Contracting CO, U.A.E.
05.2010 - 04.2014

Senior SURVEYOR

M/s. AL Nile Janobi Construction & Irrigation Est.
01.2009 - 03.2010

Bachelor's degree - geography and geographic information system (Surveying and mapping)

Alexandria University | Faculty of Arts
09.2004 - 06.2008
Ahmed Mohamed Ali Ibrahim