Dynamic Project Engineer with a proven track record at Construction field, adept in project estimation and technical leadership. Successfully managed budgets and improved stakeholder communication, ensuring projects met financial targets and deadlines. Recognized for effective planning and deployment, enhancing operational efficiency in high-pressure environments.
Overview
9
9
years of professional experience
1
1
Certification
Work History
Project Engineer
ROYAL TECH EMW. | IPP 500MW Solar Plant MANAH-II |
03.2024 - 12.2024
Extracting the coordinates from Autocad and excavation work according tho the drawings.
Cable laying from cable schedule and achieve the progress bas e targets. For shifting the drum arrangements with coordination of Logistic team.
Planning and execution for laying and termination MV cables 1Cx630mm sq.mm, 3Cx240 sq.mm, LV Cable 1Cx400 sq.mm and DC Solar Cable 1Cx6mm sq.mm.
Testing & assistance in commissioning with EPC team along with Loop test, Insulation and Resistance test of cables, VLF Test of MV Cables.
Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
Improved communication among stakeholders through regular updates and meetings.
Managed budgets effectively for multiple projects, ensuring financial targets were met.
Project Engineer
| ROYAL TECH LLC | AL DHAFRAH 2.1GW Solar Plant |
11.2023 - 03.2024
Installation of additional support & cleat on 33KV & 11KV MV cable.
33kv & 11KV, LV and DC Solar cable laying, pulling & dressing and termination.
Work as a Solar Project Engineer and supervised rectification work and check & clear the punch point list.
Leading the operation of PV module cleaning Robots.
Control box & Antenna installation for signal system of tracker moving and RS 485 Cable laying.
Maintenance on Solbright Robotic System with battery replacement,Fuses replacement for smooth operation.
Changing the PV modules, bridge rectification and replacing the mechanical structure.
Installation of cable trays, supports, Inverter frame and MV Station Structure.
Preparing daily, weekly and monthly Progress Report for Management, consultant, and Client.
Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
Senior Site Engineer
| DAWN ENGINEERNG REGD. | IBRAHIM FIBERS LTD. |
04.2022 - 10.2023
Work on renovation of TEXTILE PALNT-3 & HFO Plant.
Renovation of Textile plant with complete replacement of cable back pulling of control and power cables.
Facilitated smooth handovers by thoroughly documenting all relevant information related to completed projects.
Spearheaded efforts towards continuous improvement within the organization through ongoing development of best practices in site engineering.
Renovation of HFO Plant by replacing the power and control cables of CATERPILLER heat furnace oil generator with all electrical and instruments accessories.
Reduced construction costs through diligent evaluation of materials and suppliers, ensuring best value without compromising quality.
Electrical Site Engineer
| FALCON INTERNATIONAL | ICI POLYESTER PLANT |
11.2021 - 03.2022
Work on NEW R-PET PLANT for reprocess of plastic by using grains.
Work on site BOQ,make planning, execute and achieve the targets and lead the project effectively.
Arrangements of resources and coordinate with client for work front and progress base meetings.
Installation of cable tray, conduit, Lighting system, Fire Alarm system, Emergency exit system and small power system.
Work on LV cable, Instruments cables, and earthing system along with earth pits and lightening system.
Coordinated effectively with utility companies during power supply connections, ensuring uninterrupted service for end-users upon completion of the project.
Increased safety standards by conducting thorough risk assessments and implementing preventive measures for electrical installations.
Electrical Site Engineer
| DAWN ENGINEERING REGD. | IBRAHIM FIBERS LTD. |
05.2018 - 10.2021
Work on installation for TEXTILE PLANT-4 1 lakh spindle plant as a main contractor company for erection of electrical work.