Summary
Overview
Work History
Education
Skills
Timeline
Generic

Alireza Najafi

Canada

Summary

Adaptable Project Manager with experience managing high-value construction projects. Leads by example to uphold quality and productivity standards. Briefs staff and contractors on key project requirements and motivates teams to achieve them.

Overview

14
14
years of professional experience
5
5
years of post-secondary education

Work History

Project manager

Abtin Tolid Setak
Shiraz, Iran
09.2023 - Current
  • Managing Various construction projects that include dredging operations, river clearing, and excavation to prevent flooding, in addition to managing artificial recharge projects, flood control, and groundwater replenishment to increase water levels.
  • Kept appropriate stock levels to match expected demand.
  • Generated Key Performance Indicator reporting to drive better performance.
  • Wrote reports outlining project progress and results.

Senior project coordinator

Abtin Tolid Setak
Shiraz, Iran
03.2021 - 09.2023
  • Implementation of modern irrigation systems, including strip, sprinkler, and drip irrigation for agricultural lands, gardens, and municipal green spaces
  • Having comprehensive knowledge of various types of pipes and polymer, cast iron, and brass fittings, as well as valves and different types of polyethylene welding, along with the construction of concrete pools and water storage reservoirs using geomembrane sheets.
  • Investigated issues affecting group operations, prepared reports and helped correct problems.
  • Developed extensive project plans, ensuring clear direction throughout the lifecycle of the project.

Senior project coordinator

Abtin Tolid Setak
Shiraz, Iran
02.2018 - 03.2021
  • Working on water transmission line projects with various types of pipes, including polyethylene, corrugated, and GRP, in sizes ranging from 90 millimeters to 450 millimeters.
  • Managed estimation processes by preparing bid packages, procurement plans and contract reviews.

Senior coordinator

Forouz Tarh Arang
Shiraz, Iran
12.2014 - 02.2018
  • Cordinating Projects for the construction of irrigation and drainage networks, followed by land leveling and consolidation
  • Oversaw project timelines to ensure timely completion.
  • Oversaw facility maintenance and allocated needed resources to meet standards.

Survey engineer

Firouz Tarh Arang
Shiraz, Iran
10.2010 - 12.2014
  • Surveying with a New Total Station in irrigation and drainage network construction projects, as well as the collection of primary and secondary maps for various engineering projects, including excavation, land leveling and consolidation, pipeline water transfer schemes, and the implementation of modern irrigation systems.
  • Created wiring and assembly diagrams for manufacturing work.
  • Generated complex detail drawings showing individual system components.

Education

Bachelor of Engineering - Mechanical Engineering-Heat and Fluids

Islamic Azad University
Shiraz
02.2008 - 09.2010

Associate's degree - Technical Technician Of Mechanics

Islamic Azad University
Shiraz-Iran
09.2005 - 02.2008

Skills

  • KPI setting and management
  • Agile methodology
  • Effective communication
  • Leadership in team settings
  • Customer service orientation

Timeline

Project manager

Abtin Tolid Setak
09.2023 - Current

Senior project coordinator

Abtin Tolid Setak
03.2021 - 09.2023

Senior project coordinator

Abtin Tolid Setak
02.2018 - 03.2021

Senior coordinator

Forouz Tarh Arang
12.2014 - 02.2018

Survey engineer

Firouz Tarh Arang
10.2010 - 12.2014

Bachelor of Engineering - Mechanical Engineering-Heat and Fluids

Islamic Azad University
02.2008 - 09.2010

Associate's degree - Technical Technician Of Mechanics

Islamic Azad University
09.2005 - 02.2008
Alireza Najafi