Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Competent HSE Professional with around 15 years of experience that reflects pioneering expertise & year on-year success in implementation of Occupational Health & Safety Management Systems.
Corporate HSE - Business Development, Subcontracts & Proposals
Corporate - HSE Management
Support and actively participate in various projects.
Project : Bu Hasa Integrated Field Development (BUIFDP)
Value : $1.4bn
Client : ADNOC Onshore
Country : UAE
Key Element : Increase and sustain production plateau in Shuaiba to 560 MBOPD contributing towards 650 MBOPD across Bu-Hasa Asset. Construction of new gas lift compression station and gas lift distribution network, Development of water injection network across Bu-Hasa Field and upgradation of CDS facilities for handling increased water cut.
Project : Lower Fars Heavy Oil Development Program (Phase 1)
Value : $4.3bn
Client : Kuwait Oil Company (KOC)
Country : Kuwait
Key Element : Phase-1 facilities comprise of two well blocks (930 wells) which designed to process a nominal 60,000 BOPD of heavy oil. The field will be developed using a thermal recovery process which will employ Cyclic Steam Stimulation (CSS) followed by Steam Flood (SF). The broad scope involves development of Production Support Complex (PSC), Central Processing facility (CPF), Well Blocks 02 and 03, Infield Satellite Station (ISS), Trunk and Steam Lines, Pipelines for Export Oil, Fuel Gas, Make Up and Disposal Water, Sub Stations, New Storage Tanks along with Loading and Filling Manifolds and New Crude Oil Control Centre (COCC) and Pumps in South Tank Farm (STF).
Responsibility and achievements:
Project : Integrated Gas Development Expansion Project (Package # 3)
Value : $860m
Client : Abu Dhabi Gas Industries Ltd., (GASCO)
Country : Abu Dhabi
Key Element : It is part of ADNOC program to produce 400 MMSCFD (million cubic feet) of additional gas from its offshore fields in order to increase onshore gas sales. Project consists of several gas processing units, gas pipelines, condensate pipelines and all required interconnections.
Responsibility and achievements:
Project : ZWSC (Zakum West Super Complex) additional 100MBD Modification Stage # 4 Oil Circuit Offshore Campaign
Value : $300m
Client : Abu Dhabi Marine Operating Company (ADMA OPCO)
Key Element : Installation of New B14 bridge between existing Riser Platform and Collector Separator Platform & New Local Control Room building and Electrical Room on new B14 Bridge. Installation of MOL Pumps, Lube Oil Skid, Sea Water Filter Package and associated piping and instruments. Demolition of redundant lines and facilities in existing LCR and telemetry cabin.
Responsibility and achievements:
Project : Shah Sour Gas Field Development
Value : $10bn
Client : Abu Dhabi Gas Development Company (Al Hosn Gas)
Key Element : Develop sour gas from the Shah reservoir and operate all facilities required to produce, transfer, and process & transport the sour gas to the delivery points and market Sulphur for export abroad.
Responsibility and achievements:
Project : ZCSC (Zakum Central Super Complex) Demothballing Project
Value : $350m
Client : Abu Dhabi Marine Operating Company (ADMA OPCO)
Key Element : De-mothballing and Re-commissioning of Oil Production facilities which includes demolition of existing facilities, equipment & piping, installation of structural extensions, new equipment & piping at refurbishment of existing vessels (separators & gas scrubbers). The ZCSC Demothballing Project is part of the overall ADMA Lower Zakum 100MBD programme aimed at enhancing the oil production capacity from Zakum Field.
Responsibility and achievements:
Project : Petronet LNG Kochi Terminal
Value : INR3700Cr
Client : Petronet LNG Limited
Key Element : Construction of LNG Receiving, Storage & Re-gasification Terminal at Kochi. Mechanical installation activities including piping, tankages, total equipment erection and all associated works.
Responsibility and achievements:
Project : Strategic Gas Transmission Project (SGTP)
Value : $800m
Client : Qatar Petroleum
Country : Qatar
Key Element : Laying 211 km of pipeline with associated stations and infrastructure. The project will transport 2000 MMSCFD of sweet lean gas from Ras Laffan to different consumers via 36-inch diameter pipelines.
Responsibility and achievements:
Project : SPR Group Residential Project – Osian Heights
Value : $800Cr
Client : SPR Group
Country : India
Key Element : Osian Heights, SPR Group first project in Mint - Chennai is a scaled-up dimension of every home lover’s dream that has become a reality today. It is a testimony to the highest comforts that lifestyle pleasures demand. Osian Heights with a 3 Lakh Sq.ft of construction and world class amenities stands as the tallest tower in North and Central Chennai
Responsibility and achievements: