ODOO
Proficient Project Engineer with 10+ years of experience driving over 100+ projects to completion. Skilled in overseeing technical staff ensuring that projects are completed on schedule, within budget and according to specifications.
Practical and hands-on experience also adept at successfully and effectively interacting with contractors across multiple construction sites. Excellent project management abilities demonstrated by career history of on-schedule and on-budget completed projects. Particular experience in TELECOM and ELV projects.
•CREATED AND DEVELOPED PROJECT TIMELINES AND GOAL SETTING TO COMPLETE PROJECTS.
•ENSURED PROJECTS REMAIN ON SCHEDULE, COST AND TIME TO SUPPORT DIVISION OBJECTIVES.
•COORDINATED WITH PROGRAM MANAGERS AND CUSTOMERS TO SUPPORT DELIVERABLES AND OBJECTIVES.
•RESPONSIBLE FOR ADHERING AND CREATING MILESTONE SCHEDULES, DRAFTING POLICIES AND PROCEDURES, AND ACCURATE MANPOWER ESTIMATES.
•LED AND CONDUCTED MEETINGS TO ELICIT, DEFINE AND DOCUMENT THE REQUIREMENTS OF VARIOUS PROGRAM MANAGERS AND STAKEHOLDERS.
•ENSURED TEAMS AND PROGRAMS HAVE TOOLS NEEDED TO MEET PROJECT MILESTONES.
•ASSISTED IN DOCUMENTING PROJECT PHASES AND CREATING SUMMARY REPORTS FOR MANAGEMENT.
•CONDUCTED QUALITATIVE ANALYSIS OF EXISTING IMPLEMENTATIONS AND PROVIDE THOUGHTFUL, STRATEGIC IMPROVEMENT RECOMMENDATIONS.
•MET WITH CLIENT TO DETERMINE THE SCOPE OF THE PROJECT AND ANALYZE CURRENT SYSTEMS AND PROCEDURES.
•ASSIGNED PROGRAMMING TASKS TO TEAM MEMBERS AND SET MILESTONES TO MONITOR PROGRESS.
•RESPONSIBLE FOR DOCUMENTATION PREPARATION (USING MS WORD AND MS POWERPOINT) AND REVIEW.
•REVIEWED FIELD INSPECTION REPORTS FROM CONSULTANTS THROUGHOUT THE LIFECYCLE OF THE PROJECT.
•ENSURED THE DELIVERY FROM THE PROJECTS ADHERED TO THE APPROPRIATE LEVELS OF QUALITY, ON TIME, IN ACCORDANCE WITH THE PLAN AND GOVERNANCE MODELS.
•PROVIDED SUPPORT TO THE SYSTEM TESTING TEAM AND BUG FIXING OF THE APPLICATION.
•SUPPORTED DURING UAT AND INCORPORATION OF ANY CHANGES REQUIRED IN THE DEVELOPED APPLICATION.
•MET MONTHLY TO DELIVER PROJECT STATUS UPDATES AND TO REPORT ON NEW AND EXISTING PRODUCTION ISSUES.
PROJECT-NEW NEW ABUDHABI INTERNATIONAL AIRPORT (MID FIELD TERMINAL BUILDING(MTB):
RESPONSIBILITIES:
PHASE-2 PROJECT-ABUDHABI INTERNATIONAL AIRPORT(CURRENTLY ACTIVE) :
RESPONSIBILITIES:
PROJECT- NEW ABUDHABI INTERNATIONAL AIRPORT (MID FIELD TERMINAL BUILDING-MTB ):
RESPONSIBILITIES:
SPECIFIC DUTIES & RESPONSIBILITIES:
•EXPERIENCE IN FUSION SPLICING OF SINGLE MODE AND MULTIMODE FIBERS USING MACHINES FUJIKURA FSM-50S, FSM- 60S, FSM-80S.
• EXPERIENCE IN OPTICAL FIBER TESTING USING EXFO FTB-1, JDSU MTS-6000, MTS-4000 AND OPTICAL LINK AND EXFO POWER METERS.
• EXPERIENCE IN FAULT DETECTION AND RECTIFICATION OF FOC.
• EXPERIENCE IN FIBER MANAGEMENT SYSTEM (FMS) HANDLING AND ROUTING.
• TERMINATIONS OF FIBER OPTIC CABLES TO PATCH PANELS (ODF).
• RF SURVEY. LOS SURVEY, NEW SITE SURVEY, QUALITY CHECKING AND AUDITING OF SITES.
• ELECTRICAL AUDIT, POWER AUDIT AND SITE SURVEY.
• CO-COORDINATING WITH SERVICE PROVIDERS AND CLIENTS FOR TROUBLESHOOTING AND ENSURING MINIMUM DOWNTIME.
• CHECKING OF VSWR AND TRANSMIT POWER AND ENSURING THE VALUES TO BE IN ACCEPTABLE RANGE.
• TESTING OF FIBER OPTIC POWER USING POWER METER.
• ANALYSIS OF OPERATION AND MAINTENANCE OF SITES.
PROJECT NAME - INDUS TOWERS,QUIPPO – WTTIL,ETISALAT CIRCLES: MAHARASHTRA, UP(E), UP(W), BIHAR & JHARKHAND,VISAKHAPATNAM
SIZE OF THE PROJECT: OVER 20 SITES (BSC SITES)
SPECIFIC DUTIES & RESPONSIBILITIES :
• PROVIDED TECHNICAL SUPPORT FOR VARIETY OF SYSTEMS.
• PREPARED REPORTS AND DOCUMENTATION FOR ONGOING PROJECTS AND ROUTINE SERVICE CALLS.
• INSTALLED NEW SYSTEM COMPONENTS.
• REPAIRED AND REPLACED COMPONENTS AS NEEDED.
• CHECKED AND TESTED NEW INSTALLATIONS AND REPAIRS TO ENSURE FUNCTIONALITY .
• COORDINATED SERVICES WITH CLIENTS.
Coordinating team projects
ODOO
CITRIX(DU)
AUTOMATION CERTIFICATIONS
DRIVING
FOOT BALL PLAYING