Critical-thinking Facilities and MEP Operation with 22 years of proven successful cost-reduction techniques, efficient planning with scheduling, and error-free compliance inspections. Adept at aligning departmental goals and personnel assignments to achieve on-time job completion, supporting overall company objectives.
Overview
22
22
years of professional experience
3
3
years of post-secondary education
1
1
Certification
4
4
Language
Work History
Head of Operation and Maintenance
Promater Technical works
Dubai, UAE
01.2018 - Current
Led facility management staff and consultants in producing business plan that focused on facility operations.
Evaluated facility operations and personnel for safety and health regulations compliance.
Oversaw finances and made recommendations to reach or exceed budget in unforeseen circumstances.
Oversaw all aspects of equipment installation, maintenance, and repair for both internal and external services.
Supervised staff of 42 in day-to-day activities.
Tracked and documented operational and financial records to perform analysis of performance and costs.
Conducted inspections of facility grounds, external structure, systems, and equipment.
Skillfully managed facility operations as functioning CEO for multi-million dollar healthcare company.
Maximized profitability through revenue development, cash control and expense reviews.
Held classes to teach staff facility procedures.
Ordered, maintained and distributed supplies and inventory.
Reviewed and oversaw construction and renovation projects.
Set and enforced departmental budgets, goals and deadlines.
Maintained facility grounds, equipment and safety compliance.
Maintained lost and found and unclaimed property, disposing and donating items unclaimed for long periods.
Developed and oversaw budgets for facilities and worked within cost restraints.
Prepared reports and schedules with accuracy.
Oversaw facility space leasing and kept peace among units.
Senior Maintenance Engineer
A&H INVESTMENT L.L.C
dubai, UAE
11.2013 - 12.2017
Developed process improvements to increase reliability and equipment performance.
Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
Dismantled defective machines and equipment and installed new or repaired parts.
Actualized strategic plans and managed equipment, lifecycles and processes.
Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
Cleaned and lubricated parts to keep equipment operating at peak performance.
Improved processes, helping to save department over AED300,000annually.
Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
Finalized work on building systems by completing basic carpentry and other finish work.
Installed electrical systems ranging from LV to HV
Conducted cost estimates and performed preventive maintenance materials items.
Worked with colleagues on special projects such as turnkey and emergency
Sourced and procured components adhering to company purchasing rules.
Developed work scope for contracted projects, analyzing received quotes and recommending preferred vendors.
Performed troubleshooting and repair for complex electrical equipment.
Diagnosed and resolved machine operation variations and equipment problems.
Performed general building upkeep, painting, and normal machine maintenance.
Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
Reviewed technical documentation to complete equipment maintenance and repair.
Investigated and corrected mechanical problems with machinery
Organized and directed maintenance shutdowns and startups.
HVAC Engineer
Clifton Interiors
dubai, UAE
01.2012 - 10.2013
Developed instrument diagrams, formal calculations and equipment datasheets.
Drafted system and equipment designs using CAD software.
Repaired and installed split systems, chillers and boilers.
Compiled operational, performance and safety data on HVAC and support systems.
Conducted safety analyses and hazard evaluations for systems.
Promoted positive solutions for preventive maintenance, equipment repair and component fabrication to match specifications.
Designed HVAC systems and specified components for successful installation and operation.
Prepared reports and studies to resolve open technical issues.
Used HAP and CAD to draft assemblies, models and other technical drawings.
Coordinated with engineering group and other disciplines to develop new system designs.
Helped maintenance and building engineers make accurate assessments and repair plans for HVAC systems.
Reviewed designs and counseled variable clients on courses of action to remedy issues while staying under-budget and sticking to timelines.
Created, prototyped and tested Community systems for stakeholders clients.
Applied mechanical problem solving skills to develop creative solutions for quality products.
Used ArcInfo to process field collected data for performance evaluation.
Examined existing documents and blueprints to best update and maintain project records.
Established project system to promote increased reliability and profitability.
Researched past clients and new designs to maintain customer satisfaction and guarantee long-lasting, high-quality work.
Supported data center power and cooling infrastructure and consistently applied critical facility operational best practices.
Drove reliability and profitability through introduction of bussines developed system.
Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
Delegated tasks to entry-level engineers, closely monitoring work to monitor quality, maintain speed and exceed daily project goals.
Planned multiple projects from beginning to end, focusing on timelines, budgets and mechanical feasibility.
Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
Interpreted blueprints, technical drawings, schematics and computer-generated reports for new product development.
Specified system components and directed product modifications to comply with engineering design and performance specifications.
Designed budgets and cost estimates for projects with speed and accuracy while working closely with clients, drafters and employees to determine best courses of action.
Liaised effectively between Project department and financial facility, keeping parties informed of project changes.
Developed internal processes and plans for mechanical verification, product development and factory processes.
Designed new automated sensors for CHW pumps systems.
Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.
Identified suitable materials for production use that aligned with environmental concerns and budget constraints.
Surveyed potential project sites before design, checking for space restrictions, mechanical feasibility and manufacturers guidelines.
Incorporated solutions that met various project challenges and adhered to environmental, packaging and vibration requirements.
Applied technical troubleshooting to create quality HVAC and air control solutions.
Troubleshot and diagnosed HVAC equipment issues, quickly made plans for repairs and monitored use to rectify issues.
Created HAP system resulting in increased reliability and profitability.
Educated clients on more energy-efficient solutions for old systems that meet project requirements for timelines and budgets.
MEP Engineer
Al Futtaim Engineering
Dubai, UAE
04.2006 - 12.2011
Interpreted architectural designs and engineering plans for systems, new construction and existing facilities.
Carefully analyzed completed projects and studies for compliance with established budgets and policies.
Optimized supply levels to keep stock within ideal parameters for expected needs.
Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
Organized ongoing maintenance schedules to boost system performance.
Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
Monitored safety compliance to maintain strict standards and protect team members from harm.
Assessed employee work and improved performance with time to time approaches.
Evaluated final results to determine quality levels and isolate root causes of any identified faults.
Displayed tact and discretion when working with confidential project contracts and contractor information.
Analyzed problems in LV rooms and operation room before formulating and enacting solutions.
Developed standards and technical specifications for MEP and projects.
Carefully studied and perfected terminology and symbols directly related to design and drafting of building construction.
Implemented processes for inspection and evaluation of Aluminum industrial facilities.
Conducted detailed cost estimates for non-complex approved and variation of the projects.
Gathered statistical information to delegate funds, equipment and personnel without overextending company budget.
Maintained company GIS database for cost estimating purposes.
Established and maintained best practices on maintenance management measures by routinely reviewing and updating factory standards.
Interviewed representatives of leading manufacturing companies for pricing and specifications of mechanical equipment and manufacturing plans.
Monitored systems to assure increase in power flow and integrated new system components, fixtures and motors.
Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
Reviewed and studied blueprints to double-check installation and implementation project requirements.
Hired and trained new sub contractor workers to improve efficiency of department and cultivate productive work atmosphere.
Oversaw team of service professionals focused on Facilities
Analyzed account information to improve and optimize customer relations.
Managed efficient teams of up to 17 employees.
Planned and implemented solutions for technical problems such as Preventive and maintenance
Contributed to development, implementation and execution of maintenance programs.
Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
Monitored product quality and communicated necessary improvements to site superintendent.
Efficiently assisted service workers with problematic transactions to maintain customer satisfaction and quickly rectify issues.
Site Engineer
Blue star Limited
Chennai, India, Tamil Nadu
03.2001 - 02.2002
Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
Analyzed survey reports, maps, blueprints and other topographical and geologic data to plan infrastructure and construction projects.
Developed cost estimates for planned projects to aid in costing and budget planning efforts.
Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.
Recorded daily events and activities in site diary to evaluate process and improve productivity.
Surveyed, graded and leveled Multi construction sites.
Managed construction equipment maintenance to minimize costs and avoid project disruption.
Checked technical designs and drawings for adherence to standards.
Implemented on-site sustainable waste disposal and recycling programs to reduce project environmental impact.
Performed critical reviews of proposed plans to detect potential faults and streamline proposed designs.
Reviewed construction plans and financial projections to verify accuracy and feasibility of HVAC projects.
Monitored team of 09 personnel during construction activities for compliance with health and safety requirements.
Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
Oversaw quality control and health and safety matters for construction teams.
Prepared master schedule to track project deliverables and meet key milestones.
Supported calculations and design decisions relating to HVAC studies.
Addressed integration of various on-site utility and facility assets.
Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and MS Project.
Published project-related deliverables for distribution to customers and stakeholders, iterating easy-to-understand language and media.
Analyzed and interpreted construction designs and specifications created in AutoCAD and SolidWorks.
Surveyed site, marked locations and oversaw construction of roads and other infrastructure components.
Drafted construction planning documents for internal use and submission to applicable inspectors.
Identified and resolved technical issues and design conflicts to minimize project delays and maintain tight schedules.
Prepared development plans for HVAC projects, iterating customer requests and applicable regulatory compliance needs.
Served as primary interface between clients and company during projects and post-completion support phases.
Supervised and monitored daily tasks of various subcontractors.
Ordered and tracked delivery of construction materials and supplies from vendors.
Prepared diagrams, charts and surveys showing information about job locations and project scopes.
Technical Service Engineer
Hitachi Air Conditioners
Chennai, India, Tamilnadu
06.1999 - 02.2001
Worked cross-functionally within organization and external partners, integrators and vendors.
Developed, designed, deployed and integrated HVAC systems
Participated in client consultations and product capability demonstrations to support sales efforts.
Assisted techincal team through preparation and delivery of technical presentations and statements of work by matching specific client business requirements with effective technical solutions.
Developed and maintained broad knowledge of applications and industry activity to stay aware of trends, issues and competitions.
Installed, configured and tested equipment on specialized platforms.
Analyzed and evaluated performance and optimized efficiency.
Analyzed, troubleshot and diagnosed problems and provided prompt repair and solutions.
Drafted failure analysis reports and prepared quotations for repair.
Provided customer feedback to team to facilitate project road map and relationship planning.
Engaged in first-level support for customers requiring routine support and troubleshooting.
Educated prospects on product implementation and usage and answered technical and security questions.
Created relationships with key decision-makers and served as external technical spokesperson.
Escalated and re-produced problem to internal development sources to reach solution.
Followed up with clients to verify optimal customer satisfaction following support engagement and problem resolution.
Increased sales by educating prospects on benefits of products and services in comparison to competitors.
Collaborated with vendors to locate replacement components and resolve advanced problems.
Project and maintenance about MEP (Facilities) Interiors fit out design handling and Execution Maintenance and operation in Real-estate, commercial, Residential, Industrial Procurement and estimation Heat load calculation, Auto CAD drawing and design execution in ASHARE standards
Business Development Associate at Perfect Technical Works and Landscaping LLCBusiness Development Associate at Perfect Technical Works and Landscaping LLC