To have a growth oriented and challenging carrier, where I can Contribute my knowledge and skills with an organization of high Repute and enhance my experience through continuous learning and teamwork.
Overview
7
7
years of professional experience
1
1
Certification
Work history
MEP SUPERVISOR
TRANSGUARD GROUP
SITE-TOWN SQUARE NSHAMA DUBAI, UNITED ARAB EMIRATES
12.2024 - Current
Managing day to day activities and coordinating with clients & in-house team for PPM & corrective task action plan.
Monitoring CAFM system and operating, scheduling PPMs, and reactive maintenance and assigning to concern team and ensuring timely completion all raised request.
Ensure all PPM and reactive are close with SLA.
Knowledge in circuit breakers (ACB,VCB,MCCB,MCB) variable frequency drive of motor controls.
Operation and maintenance of 350 KVA diesel generator.
Knowledge in transformer, circuit breakers, uninterrupted power supply.
Conducted regular site inspection to monitor quality of work and adherence to project specifications.
Specialized for central and district cooling system, operating and maintaining of water cooled and air cooled chillers. Trouble shooting of AHU, FAHU, FCU, split and window AC. Exhaust and ventilation system. Solve the problem of electrical and plumbing works. Operating and monitoring BMS & CCTV system. Controlling and monitoring fire alarm and fire fighting system, maintaining pool water and spa related equipment.
Assigning breakdown call to technicians, Executing the PPM & casual jobs, Daily utilities consumption report making and records maintaining, carry out the PPM HVAC system and assisting to colleague, follow up break down.
Coordinate with suppliers and sub contractors to complete the job With the planned schedule, coordinate with tenant and their complaints.
Supervising a team of 15 technicians in the organization handling escalated calls.
Coordinate with team for preventive maintenance & annual maintenance of all kind of air-condition & refrigeration system and maintain the inspection log sheet, document.
Worked on chiller plants of TRANE like 350TR.
Giving online support over the phone to the to the technicians.
Taking temperature reading and maintaining cooling as required by the clients.
Handling problems related to FAHUS, AHUS, FCUS.
Installation, repairing and maintenance of window AC, split AC, duct split unit, HVAC system, VRF system and central air conditioning plants cooling tower chilled water & condenser water pump.
MEP SUPERVISOR
ALTIS FACILITY MANAGEMENT
SITE-DLF CITY CENTRE MALL GURUGRAM, INDIA
05.2021 - 10.2024
Monitored building management systems to ensure optimal performance.
Executed maintenance on specialised equipment, including BMS actuators and VFD drives.
Liaised with contractors, achieving smooth workflow.
Implemented preventative maintenance plans to reduce downtime.
Achieved high safety standards with strict adherence to regulations.
Performed troubleshooting tasks, quickly resolving system issues.
Coordinated subcontractors' activities; ensured timely execution of tasks.
Supervised maintenance team and reviewed completed work to evaluate performance.
Procured information from various vendors to support cost-effective purchasing.
Documented daily work performed in company logs and on equipment-specific reports.
Restored equipment to operational condition by removing and replacing or repairing components.
Inspected mechanical components to identify issues and determine proper corrective actions.
Conducted routine inspections and servicing to guarantee reliability of controllers.
PRODUCTION ENGINEER
JBM AUTO PVT LTD J-3
IMT Manesar Gurugram, India
10.2018 - 04.2024
Company Overview: Joint venture with India's largest car manufacturing MARUTI SUZUKI INDIA LTD and tier-1 sheet metal stamping and weld assemblies.
Execution of daily production plan with respect to the daily, weekly dispatch plan.
Achieve SPP target on daily, weekly and monthly basis.
Monitoring the processes (welding) for ensuring the quality of product as per standards.
Responsible for implementation of 5S activities and KAIZEN activities.
Responsible for safety improvements on line by removing unsafe, near miss condition from line. Ensure that all the safety rules are adhere by operators.
Implementation of POKA YOKE & KAIZEN for quality and productivity improvement.
Plan for meeting customer requirement which includes quantity as well as quality.
Coordinating with supporting departments for smooth flow of production process.
Control and monitoring of rejection and rework.
Manpower management, monitoring & removing welding defect from the process.