

Qualified Electrical & Instrumentation Engineer cum Supervisor with 7 years 6 months of experience in entire gamut of Power and instrument management. Scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step; targeting challenging assignments with a leading organization of repute in Power Distribution and E&I sector.
Project: Raptor Upgrade ADNOC Refining Mussafah Terminal-Emerson.
(Installation of new Radar Level gauge,Installation of New canopy (FRP) with mounting structural support for Radar Level Gauge,Cable Laying and termination of new cable from the tank hub to the tank gauge, Installation of CableTags, Ferrules, Earth Cables, Testing and Commissioning Assistance, Preparation of HSE Documents related to mobilization and pre-mobilization audit for tanks).
Project Management: TRIZAC Abudhabi,Sole Proprietorship L.L.C.UAE.
Consultants: Camber Electromechanical LLC,Abudhabi,UAE.
Client: Abudhabi National Oil Company (ADNOC)
Duration: Dec 2025 to Jan 2026.
Project Management: TRIZAC Abudhabi,Sole Proprietorship L.L.C.UAE.
Consultants: Camber Electromechanical LLC,Abudhabi,UAE.
Client: Abudhabi National Oil Company (ADNOC)
Duration: Dec 2025 to Jan 2026.
Project: Provision Of New Slurry Pump, Gas Con C3 Recovery Improvement & New Steam Reboiler Along with Associated Facilities at RFCC Unit RR-I.
(Cable segeration requirements, installation and laying of cables – underground, cable laying installation and laying of cables – aboveground, installation of cable tray with support, glanding and termination of cables, installation of earth bus bar,installation of earthing cable, bare conductor laying, connection & termination, installation of cadweld system, installation of instrument junction box, installation of light poles, installation of light fixtures, installation of lighting junction box, installation of the field instruments, installation of supports for tubing installation, installation of tubes and fittings, cable termination in DCS, ESD and MCMS panel, loop checking).
Consultants: Camber Electromechanical LLC,Abudhabi,UAE.
Client: Abudhabi National Oil Company (ADNOC).
Duration: Jan 2025 to Nov 2025.
Specific responsibilities include:
Project: Changi Water Reclamation plant (PUB), Changi coastal Area, Singapore. (Thickening and Dewatering Centrifugal pump Operation & Maintenance, MODBUS and RPBA Signal Testing, Loop Calibrating, Injecting Signals for Testing through Process meters.)
Project Management: GEA Westfalia Separator.
Consultants: GEA
Client: Public Utilities Board (PUB)
Duration: Feb 2024 to Oct 2024.
Project: Auto Filler Extraction Project In Packaging Conveyor Lines, Sunview Way, Singapore. (Installation, Testing & Commissioning of Switch Gear, VFD, PLC, Transmitters, Level switches, Flow Meters, Proximity Sensors).
Project Management: Sumitomo Mitsui Constructions Co. Ltd. (SMCC).
Client: Pepsi Company (PEPSICO).
Duration: Oct 2023 to Feb 2024.
Project: Rerouting of Power Cables and Instrument cables for Evaporator Systems and SILO Extraction Sunview way, Singapore. (Testing and Commissioning of Flowline Pumps, Alfa Level Thinktop and Control Valves).
Project Management: Sumitomo Mitsui Constructions Co. Ltd. (SMCC).
Consultants: Tetrapak
Client: Pepsi Company (PEPSICO)
Duration: Nov 2021 to Oct 2022.
Project: Rainwater Reclamation to Process water for Production (Installation, Testing and Commissioning of level Switches, Flow meters, Proximity Sensors)
Project Management: Reckitt (Mead Johnson),Singapore.
Consultants: Omnicrest Engineering and Constructions Pte. Ltd, Singapore.
Client: Reckitt(Mead johnson),Singapore.
Duration: June 2020 to Oct 2021.
Specific responsibilities include:
Sai Electrical Engineering Pvt ltd, Chennai –India.
Project: Installation of X-ray detector for detect foreign materials in Food Packaging line.
Project Management: Sai Electrical Pvt Ltd.
Client: Voltas Electromech Solutions.
Specific responsibilities include: