Accomplished Fit-out Project Manager and MEP Engineer/Fit-out Engineer with a proven track record at SHAMS INTERIORS, adept in overseeing complex projects from conception to completion. Skilled in Project Management and Advanced Problem Solving, I excel in resource allocation and workforce training, ensuring projects exceed quality standards while adhering to budget and timelines. Demonstrates a strong ability to manage stressful situations, ensuring team cohesion and project success.
Overview
14
14
years of professional experience
Work History
Project Manager
SHAMS INTERIORS
Dubai
06.2020 - Current
Responsible for all MEP design and installation.
Responsible for all fit-out services (block work, plaster, gypsum partition, paint).
Supervision of MEP installations to ensure conformance with engineering design, performance specifications, and assist in work measurements.
Responsible for carrying out all installations according to the method statement, regulations, and authorities' standards.
Ensuring the project meets agreed specifications, budgets, and timescales.
Involved in all fit-out material procurement and installations.
Coordination and follow-up with material suppliers and subcontractors.
Coordinate with the client, consultant, and other departments.
Responsible for preparing submittals and method statements.
Ensuring that health, safety, and sustainability policies and legislation are adhered to.
Follow inspections with the consultant engineer and QA/QC.
Prepared cost estimates for projects of varying sizes.
Created and implemented processes to ensure successful completion of projects.
Created team objectives and roles with specific goals outlined for each individual.
Conducted regular status meetings with internal teams and external partners to track progress against established milestones.
Made changes to project scope and cost and implemented most effective change management processes to keep project up-to-date.
Facilitated resolution of conflicts between team members when necessary.
Identified needs and coordinated resource allocation to deliver quality standards on time and within budget.
Conducted periodic inspections of job sites for quality and progress.
Reviewed project risks and devised proactive strategies to avoid potential roadblocks.
Coordinated resources across multiple departments and teams as needed for successful completion of projects.
Analyzed data from various sources such as surveys, interviews, focus groups. to inform decision-making related to projects.
Managed multiple projects with competing deadlines simultaneously.
Actively sought out feedback from stakeholders throughout the duration of a project in order to identify areas needing improvement or adjustment.
Developed solutions to project risks and issues, meeting quality and timeline goals and objectives.
Determined project staffing needs and led resource management.
Focused on project monitoring and management by developing forecasts and tracking expenses.
Participated in cross-functional teams responsible for developing innovative solutions for complex problems.
Drafted project construction schedule and updated as job progressed.
Negotiated with project stakeholders or suppliers to obtain resources or materials.
Led meetings with internal team members, consultants and contractors.
Submitted project deliverables to clients, consistently adhering to quality standards.
Implemented effective communication protocols between internal teams working on different aspects of a given project.
Generated and tracked change orders and other contractual modifications affecting budget and schedule.
Negotiated contracts with vendors and suppliers based on company objectives and budget constraints.
Managed contracts with vendors and suppliers by assigning tasks and communicating expected deliverables.
Electrical Engineer
Alemco Electro-Mechanical Contracting
10.2019 - 06.2020
Responsible for all ELV and electrical installations in the mall and car parking.
Supervision of ELV and electrical installations to ensure conformance with engineering design and performance specifications, and assist in work measurements.
Responsible for carrying out all installations according to the method statement, Dewa regulations, and the authorities' standards.
Ensuring the project meets agreed specifications, budgets, and timescales.
Involve yourself in design and coordinate on-site as per site coordination with the MEP team.
Coordinate with the client, consultant, and other departments.
Responsible for preparing submittals and method statements
Ensuring that health, safety, and sustainability policies and legislation are adhered to.
Follow inspections with the engineer and QA/QC.
Reporting to the Construction Manager and the Project Manager.
Provided technical support for the installation and maintenance of various systems.
Calibrated and updated electrical systems to improve performance.
Oversaw the installation, testing, and commissioning of electrical systems, ensuring adherence to safety and quality standards.
Developed and implemented electrical engineering strategies, plans and designs.
Alstom Transport
Dubai
03.2017 - 08.2019
Responsible for Third Rail Power Supply Installation Tie-In for route Expo Link 2020.
Supervision of all electrical installations for power supply from DEWA to substations, and from substations to LV rooms.
Responsible for all electrical installations on the viaduct and tunnel.
Responsible for the power supply installation of future rails at RSY Depot.
Follow inspections with the engineer and QA/QC.
LPIC for workgroup and coordination with SERCO for book in activities.
Managing teamwork and finishing given tasks on time.
Survey work for measuring the third rail dimension for the Red Line of Metro Dubai.
Planning and survey of the site for Expo Link 2020 electrical work.
Managing track electrical installations, planning, coordination with the QC department, and Serco.
Visual inspection with the client engineer and Serco, RTA, for clearance of the track.
Setting out the work in accordance with the drawings and specifications.
Observance of safety requirements.
Collaborated with other engineers on design projects to ensure safety and quality standards were met.
Initiated updated drawing package to increase manufacturing productivity.
Led training sessions for junior engineers and technical staff to improve team skills and knowledge.
Managed electrical project timelines and budgets, ensuring projects were completed on schedule and within financial constraints.
Provided technical support for the installation and maintenance of various systems.
Coordinated with suppliers, contractors, and clients to ensure project success.
Determined power requirements for specific applications based on load calculations and other factors.
Trained personnel on proper operation and maintenance of newly installed equipment.
Designed, controlled and installed electrical systems and products.
Analyzed test results to diagnose malfunctions in electrical systems.
Tracked company inventories, reported equipment damages and ordered new items to prevent shortages.
Ensured projects adhered to environmental regulations and sustainability practices.
Oversaw the installation, testing, and commissioning of electrical systems, ensuring adherence to safety and quality standards.
MEP Electrical Engineer
Delta Emirates Contraction Company
10.2016 - 12.2016
MEP DB installations and terminations of 214 villas project.
Loop check and short circuit check of DBs, SMDBs.
Testing and commissioning of DBs, SMDBs.
Wiring for Power and Lighting of Villas.
Terminations and final fixes of villas.
Managing teamwork and finishing given tasks on time.
LV cables pulling, meggering, and erection.
Analyzed key performance indicators to identify effective strategies.
MEP Electrical Engineer
China State Construction Engrg Corp. (Middle East) LLC
Dubai
01.2015 - 12.2016
Has previous experience working with pre-inspection lists, pre-testing witnessing, and client sign-off.
Exposed to organizing and liaising with subcontractors and the installation team.
Quality control is conducted in accordance with statements, quality plans, and inspection and test plans, all prepared by the project management team and subcontractors.
Liaising with the company or project purchasing department to ensure that purchase orders adequately define the specified requirements.
Supervising and counseling junior or trainee engineers.
Providing data in respect to variation orders and site instructions.
Preparing record drawings, technical reports, and site diary.
Job review of subordinate staff.
MEP construction work according to project standards and method statements in the hotel area and residence area.
Managing teamwork and finishing given tasks on time.
Hotel work includes marking according to the drawing for H/L, L/L, power, fire alarm, SCN, and emergency system for the hotel room.
Containment installation according to the drawing.
DB, LCP panel, and GRMS (Guest Management System) installation and erection.
Testing and commissioning of DB, SMDB, LCP, and MDB.
Testing and commissioning of lighting and small power systems.
Management skills for managing more than 50 workers.
MEP Electrical Sub Contractor Engineer
Ilyas and Mustafa Galadari Group
05.2016 - 08.2016
Analyzed key performance indicators to identify effective strategies.
Resolved any problems encountered during the course of construction work.
Reviewed and interpreted blueprints, specifications, and other technical documents to ensure accurate project execution.
MEP LV panel installations and terminations.
Loop check and short circuit check of DBs, SMDBs.
Testing and commissioning of DBs, SMDBs.
Open House Lighting Installations in LV, Cartoon Network Zones.
Loop check and short-circuit test for lightings.
Testing and Commissioning of Lighting.
FCU installations and testing commissioning.
Managing teamwork and finishing given tasks on time.
LV cables pulling, meggering, and erection.
T & C Engineer
Alstom Transport
06.2014 - 12.2014
Testing and Commissioning Engineer, RSG.
Magnetic and selective testing of SD, ID, and FD loops on tracks.
Installation of TLC.
Installation, testing, and synchronizing of LRT detectors for SD, ID, and FD loops.
RSG Loop Testing.
Has previous experience working with pre-inspection lists, pre-testing witnessing, and client sign-off.
Exposed to organizing and liaising with subcontractors and the installation team.
Documentation and inspections of TLC with SYSTRA and RTA.
Meetings with clients for project specifications and standards.
Direct reporting to the construction manager.
TLC completed commissioning and synchronization with the LRT detector within TRAM testing.
Preparing pre-installation check reports for junction testing.
Installation of DCS cabinets, antennas on track.
Boundary wall CCTV installation.
Electrical Engineer E&I
DESCON Engineering PVT Limited
04.2011 - 03.2014
Overview of project UCH Power Plant Having 404 MW capacity and two Gas Turbines of 128MW and Steam Turbine of 133MW and Step-up Transformers of 211MVA and 199MVA
Switch Yard of 220KVA
Client: GDF Suez Energy International
(Asia Branch)
Own e r 's Engineer Universal Research Services, London, England
Co-Partner: Hyundai Engineering and Construction, Korea
(Thailand Branch)
Education
Bachelors -
Electrical Engineering
01.2010
Skills
Project Management
Project tracking
Project development
Systems implementation
Workforce training
Work flow planning
Safety protocol
Resource allocation
Advanced problem solving
Project regulations
Staff training and mentoring
Commercial construction experience
Construction management
Price quote preparation
Systems installation, configuration, and upgrading