B. TECH in Electrical Engineering with More than Twenty-three (23+) years of experience in Construction Site Supervision of all Electrical Installation and Testing and Commissioning activities, and Co-ordination of other Electrical works, While working in UAE, Qatar, Kuwait , Saudi Arabia & India Actively involved in Site Supervision and coordination of Installation and Testing & Commissioning activities, Site execution, Project Management , Construction Site Supervision , Coordination of Engineering and Site Management of Electrical activities in transmission &Distribution System of Power Project up to 400kv Substation , in the Industry of Power/ utility and Energy sector Involved in Metro project / Infrastructure project /Airport project, and actively involved in Witnessing of Site acceptance testing works, Construction Site Supervision, Electrical Installation and Testing and Commissioning works Such as Testing of Protection Relays auxiliary Backup, Main protection, Testing of Power Transformer up to 500MVA 400/132/33kv , Testing of SWG up to 400kv GIS EHV, HV, and MV, LV SWG up to 400kv ss level, Testing of Batteries / DC System, Scheme and Functional checks of all types of transmission system protection including Over current, busbars, line differential, transformer differential, Distance protection and Tele protection, Site Supervision of Earthing works, Cable tray Installation, Material Inspection ,Documentation , Lighting Small power, Main Equipment, control and relay panel installation , Installation inspection of HV ,MV cable laying ,Review drawing and Method Statement etc.
Energo Projeckt Entel Consulting Engineers, Dubai
Projects Handled with Dubai Electricity and water authority
From Dec 2021 to Present-Forsan 132/ 11kv SS-Project Contract No: 2804.
From Nov 2020 to Dec 2020-SRSBM 400KV Series reactor Project.
From April 2019 to Nov 2020-Performer Village 132/ 11kv SS- Project Contract No: 9012.
From March 2018 to April 2019-MPS Project 132/ 33kv SS Contract No: CONT 5218 DXP METRO for Dubai Expo 2020 Metro Extension Project.
Responsibilities:
· Supervised contractor work processes of General Electrical inspection Installation Testing and Commissioning and other electrical activities and co-ordination of Civil, MEP, HVAC and FPS works and adherence to project schedule.
· Overall Project Co-ordination and Site Supervision and witnessing of Installation and Testing & Commissioning activities of 40MVA 132/11kv SS and 80MVA 132/33kv SS, and involved in Installation and testing of 33kv SWG activities and related protection works with Dubai RTA.
· Responsible for Conduct site visits to ensure that quality procedures are being followed and ensure the jobs are executed by contractors according to applicable Codes, standards, approved drawing and technical specifications
· Witnessing of Testing and Commissioning activities of Site acceptance test as per approved Standard specification and as per Client requirements.
· Responsible for Overall Site supervision of Electrical / MEP activities inspection, coordination with Engineering dept for drawing approvals follow ups etc.
· Reviewing the Contractor Technical Submittals / Method Statement, Testing procedure and Testing and Commissioning Schedule etc.
· Monitoring and Controlling the Project Daily / Weekly and program as Scheduled.
· Requesting and arranging DEWA witness as per the Weekly program Scheduled.
· Attending the Weekly Progress/ Site Co-ordination Meeting with Contractor& Client to discuss the progress and site related issues and Prepare the MOMs.
· Issuing the Site Note/ NCR for related to discrepancy item and against to Contract Specification.
· Review the Project Progress in timely manner to ensure to meet the project milestones.
· Tracking and Maintaining the Site records and updating to client on weekly basis (Sat report, Fat report RFC / As build drawing & O& M manual and Snag work).
· To maintain a proper Co-ordination with Contractor and Client for an effective Supervision of all the Parallel activities of Installation and Testing and Commissioning activities.
· Coordination with Engineering department for Modification and other related issues.
· Coordination with site/project management for expediting different erection works to facilitate important testing activities.
· Performing inspection of Electrical activities Installation of Major Equipment Control panels, DC system, Cable tray, Power and Control cable laying and Termination etc.
· Inspection of Power cable, Control cable, Earthing Sleeves for main building and auxiliary building, earthing System and cable tray other related activities.
· Inspection of SRCs for related Main Equipment's panels and accessories
· Arranging field Modification, if necessary, after Consulting with Contractor & Client.
· Co-ordination & follow up with Safety Standards to avoid the Incidents.
Energo projekt Entel Consulting Engineers, Dubai
Projects Handled with Dubai Electricity and water authority:
From Oct 2016 to March 2018-HDQNSHBA&MDNAMBR two 132/11kv SS.
From Jan 2015 to Sep 2016-Jazerasum / City Walk 132/11kv DEWA Sub Station.
Responsibilities:
• Responsible for Overall site Supervision activities and Co-ordination of Installation and Pre-Commissioning Testing and Commissioning activities from execution to up to energization.
• Responsible for Conduct site visits to ensure that quality procedures are being followed and ensure the jobs are executed by contractors according to applicable Codes, standards, approved drawing and technical specifications
• Witnessing of Testing and Commissioning activities of Site acceptance test as per approved Standard specification and as per Client requirements.
• Responsible for Overall Site supervision of Electrical / MEP activities inspection, coordination with Engineering dept for drawing approvals follow ups etc.
• Reviewing the Contractor Technical Submittals / Method Statement, Testing procedure and Testing and Commissioning Schedule etc.
• Monitoring and Controlling the Project Daily / Weekly and program as Scheduled.
• Requesting and arranging DEWA witness as per the Weekly program Scheduled.
• Attending the Weekly Progress/ Site Co-ordination Meeting with Contractor& Client to discuss the progress and site related issues and Prepare the MOMs
• Issuing the Site Note/ NCR for related to discrepancy item and against to Contract Specification.
• Review the Project Progress in timely manner to ensure to meet the project milestones.
• Tracking and Maintaining the Site records and updating to client on weekly basis (Sat report, Fat report RFC / As build drawing & O& M manual and Snag work).
• To maintain a proper Co-ordination with Contractor and Client for an effective Supervision of all the Parallel activities of Installation and Testing and Commissioning activities.
• Coordination with Engineering department for Modification and other related issues.
• Coordination with site/project management for expediting different erection works to facilitate important testing activities.
• Performing inspection of Electrical activities Installation of Major Equipment Control panels, DC system, Cable tray, Power and Control cable laying and Termination etc.
• Inspection of Power cable, Control cable, Earthing Sleeves for main building and auxiliary building, earthing System and cable tray other related activities.
• Inspection of SRCs for related Main Equipment's panels and accessories
• Arranging field Modification, if necessary, after Consulting with Contractor & Client.
• Co-ordination & follow up with Safety Standards to avoid the Incidents.
Lahmeyer International GMBH, Dubai
Projects Handled with Transco:
Abu Dhabi Transmission & Dispatch Company
From March 2014 Dec 2014: New 400/132/33kv Shamkha Grid station in Abu Dhabi.
From June2012 to February 2014: New 400/132/33 kV AJMAN Grid station in Ajman.
Projects Handled with FEWA: Federal Electricity
From Nov 2010 to April 2012: 3x132/11kV substations (Naimiya Sawan and Corniche and water tower bay Extension work)
Responsibilities:
• Responsible for Overall Project Co-ordination and Site supervision and witnessing of following Testing & Commissioning Works in 400kV SS and providing Supporting to RE.
• Testing of Numeric, Static and Electromagnetic relays. Siemens/Areva Make Relays Numerical O/C &E/F Relays, 7SJ6** Series, Differential relays7UT6**Series, Bay Control Unit 7SJ6** Series and 7SS60(BB Protection relay), 7SD**Cable differential, P141SZ, P543 Line differential etc.
• Testing & Commissioning of Power Transformers up to 500MVA, 400/132/33kv, Vacuum / SF6 Circuit breakers, Current Transformers, Voltage Transformers and Distribution Transformers etc.
• Testing &Commissioning of Control and relay Panels for EHV, HV, LV Switchgear Panels and Power transformer's Controls relay and RTCC panels, Meter Calibration etc.
Projects Handled with DEWA: .
From October 2008 to September 2010-MSJA, ETMR, CMLR & NAD AL SHBA 132/ 11KV SS.
Responsibilities:
• Responsible for Overall Project Management, Site supervision of Construction activities.
• Responsible for Site supervision of Installation and Testing and Commissioning of Electrical works.
• Co-ordination with Engineering and provide technical Support for Construction activities.
• Site Supervision & Performing inspection of Electrical activities Installation of Major Equipment Control panels, DC system, Power and Control cable laying and Termination etc.
• Inspection of Floor opening and Cutout verification for Major Equipment IDT, GIS and SWG etc.
• Inspection of Power cable, Control cable, Earthing Sleeves for main building and auxiliary building, earthing System and cable tray other related activities.
• Inspection of SRCs for related Main Equipment’s panels and accessories.
• Arranging field Modification, if necessary, after Consulting with Contractor & Client.
• Reviewing the Contractor Weekly and daily Schedule in line with Project requirement.
• Monitoring the Weekly and Daily Progress as per program as Scheduled.
• Requesting and arranging DEWA witness as per the Weekly program Schedule.
• Attending the Weekly Progress Review Meeting with Contractor& Client to discuss the progress and site related issues and Prepare the MOMs.
• Issuing the Site Note for related to discrepancy item and against to Contract Specification.
• Tracking and Maintaining the Site records and updating to client on weekly basis (Sat report, Fat report RFC / As build drawing & O& M manual and Snag work).
• To maintain a proper Co-ordination with Contractor and Client for an effective Supervision of all the Parallel activities of Installation and Testing and Commissioning activities.
• Ensure the Safety Standards during project execution to avoid the Incidents
Projects Handled: CUC CARGO 132/ 11kv SS Airport Project:
Responsibilities:
• Overall Project Co-ordination and Site Supervision of Installation and Testing & Commissioning activities.
• Witnessing of Protection Testing activities as per DEWA approval • Reviewing the Contractor Testing and Commissioning Schedule in Weekly and daily in line with Project requirement.
• Monitoring the Weekly and Daily Progress as per program as Scheduled. • Requesting and arranging DEWA witness as per the Weekly program Scheduled.
• Attending the Weekly Progress Review Meeting with Contractor& Client to discuss the progress and site related issues and Prepare the MOMs.
• Issuing the Site Note for related to discrepancy item and against to Contract Specification.
• Review of weekly Percentage of Progress as per actual and update the Site note Status, As build drawing & O& M manual Status to Client.
• To maintain a proper Co-ordination with Contractor and Client for an effective Supervision of all the Parallel activities of Installation and Testing and Commissioning activities.
• Coordination with Engineering department for Modification and other related issues.
• Tracking and clearing FAT comments and Site notes and snags. Preparation of daily and weekly progress reports
• Coordination with site/project management for expediting different erection works to facilitate important testing activities
• Co-ordination & follow up with Safety Standards to avoid the Incidents.
Projects handled in Overseas:
Projects handled With Saudi Electricity:
• Testing & Commissioning of 132/33kV Sub Substation at Saudi Electricity Company, KSA for Al-Gihaz Co Ltd.
• Testing & commissioning of 230/115/34.5kV Jawatha BSP GIS Substations at Saudi Electricity Company, KSA for ABB Contracting Co Ltd.
Projects handled With Qatar Electricity:
• Testing of 220/66/11kV GIS West Bay Super-2 GIS Substation at Qatar General Electricity & Water Corporation, DOHA, Qatar for Siemens.
• Testing of 66/11kV GIS West Bay Tower East GIS Substation at Qatar General Electricity & Water Corporation, DOHA, Qatar for Siemens.
Projects handled With Kuwait Electricity:
• Testing & commissioning of 132/11kV Khiran Peral –f GIS substation at ministry of electricity & water, Kuwait for Siemens
Projects handled in Domestic:
• Involved in Testing & Commissioning of 400/220/132/33kV S/S at M/s WBSEB, Arambagh, West Bengal for Crompton Greaves Ltd, India. • Involved in Testing & Commissioning of 400/220/132kV S/S at M/s KPTCL, Bellary, Karnataga for BHEL, India.
• Involved in Testing & Commissioning of 400kV HVDC Substation at M/s PGCIL, VIZAG for ABB Ltd, India. • Involved in modification of Control and Relay Panels and Commissioning of 400/220kV Substation at M/s PGCIL, Madurai for Siemens, India. • Involved in Testing & Commissioning of 132/25kV Traction Substation at Tiruppati, Andrapradesh, India. • Involved in Testing & Commissioning of 25MW Generating Power Plant, M/S KPTCL, Hiriyur, Karnataka for R.K. Power Gen Pvt. Ltd. • Involved in Quality Control Test For Control & Relay Panels of ABB, GE & SIEMENS at their Factory. • Involved in Testing & Commissioning of 400/220/132/33kV S/S at M/s CSEB, Bhatabara, Chatishkar for ABB Ltd, India.
• Involved in Testing and Commissioning of 110/6.6kV Substation at M/s Hitech Carbon, Chennai for Siemens, India.
• Involved in Installations, Testing & Commissioning of 110/33/kV Substation at M/s Shakthi Sugar Ltd, Erode for GET, India
• Involved in testing & commissioning of 20MW Hydel Power Plant at M/s CSEB, Chatissgarh for Boving Fouress Ltd, India.
• Involved in Testing & Commissioning of Jindal Power & Steel Plant at M/s JSW, Bellary for JVSL, India.
• Involved in Testing & Commissioning of 400/220/132kV S/S at M/s BSEB, Muzaffarpur and Bihar for BHEL, India.
Responsibilities:
• 400/220/132/33kv protection Components & Back up relays and related Scheme checks. • 400/220/132/33kv SWG Component Checks • Testing & commissioning of Power Transformer & Shunt Reactors. • Testing & commissioning of 400/132/33 SWG
• Testing & commissioning of Power Cable • Testing & commissioning of Batteries and DC System.
• Testing& commissioning of LVAC and auto Change over Scheme Checks.
• Testing & commissioning of Earthing System. • Testing & commissioning of AVR and Remote tap Change Controller and related Scheme.
• Testing& commissioning of Capacitor Bank and PFC Logic • Testing & commissioning of 400/132kv Transformer Stability & Sensitivity Checks.
• Testing & commissioning of 400/132/33kv BB Stability and Sensitivity Checks.
• Testing & commissioning of CT Primary Injections (O/C, Metering, B/B protection core) & VT secondary injections.
• Testing & commissioning of 400/132/33kv BB Fictional Checks and CBF Logic.
• Testing & commissioning of SWG Interlocks and Voltage Selection Scheme Checks.
• Testing & Commissioning of over current / Transformer protection / Bus Bar protection and Distance protection, Tele protection scheme checks.
Projects Handled With TNEP:
Gas Turbine power plant 94MW Power project. Involved in Testing & Commissioning of 94MW Power plant project testing and commissioning and related 110/6.6kV S/S at M/s TNEB, Ramanathapuram, Tamilnadu for BHEL Ltd , India.
Responsibilities:
Testing & Commissioning of control and relay panels for HV, LV switchgear.
• Testing & Commissioning of CT, VT, Auxiliary & Protection Relays.
• Testing & Commissioning of up to 40MVA Power Transformers, Distribution Transformers, AVR & RTCC PANEL scheme check.
• Testing & Commissioning of MV & HV Circuit breakers & related Interlock scheme checks.
• Testing & Commissioning of HT and LT motors and cable HI pot test. Testing & Commissioning of over current, Transformer protection, Busbar protection, Distance protection and Tele – Protection schemes.
Responsibilities,
Involved in Testing of 33/11kV CT, VT, circuit breakers, power transformer & scheme checks of Control and Protection and alarms. VT Secondary Injection and CT primary injection test and all type of electromagnetic relays test, etc.
Site Supervision and Coordination of Electrical Installation and Testing and Commissioning activities
undefinedCertification:
DEWA Approved: Protection Engineer
DEWA Approved: Lead Commissioning Engineer
DEWA Approved: Site Manager
ADDC, ADWEC-Transco Approved: Assistant Resident Engineer
Fewa Approved: Assistant Resident Engineer
Certification Course: Electrical design course on going Expected to complete end of Oct 2022.
Personal details
Date of Birth: 04.06.1978
Marital Status: Married
Nationality: Indian
Language proficiency: English, Tamil, Hindi
Driving License: Valid UAE driving License