

With more than 13 Years of experience in the construction sectors like Infrastructure Utilities, Building MEP Construction and Oil and Gas Construction including a prominent role as a Lead Planning Engineer at Al-Nasr Contracting Company L.L.C. in Abu Dhabi, I am confident in my ability to contribute to the success of your projects through meticulous planning, resource optimization, and effective schedule management. Involved in EPC roles for project controlling and costing involved in construction using planning tool’s Primavera P6 and Microsoft Excel (Macros) possessing a proven track of preparing and executing project plans and programs, preparing micro schedules in compliance with baseline schedules, monitoring the progress using Critical Path Analysis to facilitate the timely completion of project. Identification of the root cause of the delay and preparing the Recovery Plans and finding out solution to avoid further delays. Preparation of Extension of Time (EOT) claims using Window Analysis and Time Impact Analysis (TIA).
MAJOR PROJECTS UNDERTAKEN
§ Transmission Pipeline DN1600 DI from KHURAJAH NEW WDC to AL HELIO WDC
o Client: Etihad Water & Electricity (EW&E)
o Location: Ras Al Khaimah (RAK – UAE)
o Project Value: AED 225M
§ Design and Construction of KIZAD GAS Network (Phase 2)
o Client: Abu Dhabi Ports Company (ADPC)
o Location: Abu Dhabi (AUH – UAE)
o Project Value: AED 130M
§ Infrastructure Works – Dubai Island A
o Client: Dubai Holding Real State (DHRE)
o Location: Dubai (DXB – UAE)
o Project Value: AED 170M
§ Infrastructure Works – Expo Valley
o Client: Expo City Dubai (ECD)
o Location: Dubai (DXB – UAE)
o Project Value: AED 250M
§ Site Clearance Package – DEC
o Client: Dubai World Trade Centre (DWTC)
o Location: Dubai (DXB – UAE)
o Project Value: AED 80M
§ Hot HP Separator (1520-D-005) Replacement – ADNOC Refinery RRW
o Client: ADNOC
o Location: Abu Dhabi (AUH – UAE)
o Project Value: AED 110M
§ Hot HP Separator (1520-D-005) Replacement
o Client: ADNOC Refinery RRW
o Location: Abu Dhabi (AUH – UAE)
o Project Value: AED 110M
§ EPC for ADCOP Remaining Works for MOT, MPS and IPS
o Client: ADNOC Onshore
o Location: Abu Dhabi (AUH – UAE)
o Project Value: AED 65M
JOB RESPONSIBILITIES
§ Prepared Project Control Documents for tendering and implementation stages.
§ Coordinated project proposal submissions to ensure timely delivery.
§ Developed planning packages, progress measurement systems, and schedules using Primavera P6 or Microsoft Project.
§ Monitored and controlled project activities, highlighting deviations from baseline schedules.
§ Advised on recovery plans after consulting with project management to achieve milestones.
§ Generated monthly project progress invoices and conducted final reviews for client approval.
§ Estimated manpower requirements based on standard productivity norms to forecast resource needs.
§ Participated in HSE studies including HAZOP and HAZID workshops.
PROJECT UNDERTAKEN
§ Construction of High-Rise Commercial Building (7B+G+5P+49F)
o Client: ICD Brookfield Place
o Location: Dubai (DXB – UAE)
o Project Value: AED 225M
Job Responsibilities:
Major Projects Undertaken:
Job Responsibilities:
Project Undertaken:
Job Responsibilities: