Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Additional Information
Software
Certification
Interests
Timeline
Generic

Bacha Said

Senior Land SURVEYOR
Jeddah

Summary

Total Years of Experience: +26 years More than 26 years of versatile experience with consultants and reputed contractors in the position of Senior Land Surveyor, Civil Inspector, and Site Supervisor. Recently, my responsibilities as a consultant. Monitor and inspect a variety of construction work to ensure that construction is confirmed to the specifications of shop drawings and other contract requirements. Inspect and monitor construction sites to ensure safety standards. Review and examine materials delivered to the site for installation. Prepare daily and monthly reports. Conduct final inspections and par pairing list. And before that, carrying out the duties of a contractor. Different kinds of activities Road highway bridges underpasses retaining walls and pipeline sewerage collection system treatment plant drainage Irrigation and all utilities corridors. Follow up execution of planned work and liaison with client and consultant supervision of all construction works. Holding specified responsibilities in the position applied for and to contribute my experience for achieving company’s stated objectives with the betterment of my career prospects and equipping myself more professional and technical skills. Area of Expertise Structure, Infrastructure, roads Brigid’s Building Tunnels system, walkways, storm lines, sewerage lines, water supply, irrigation line ETC

Overview

22
22
years of professional experience
3
3
Certifications
1
1
Language

Work History

Land Surveyor

Louis Berger WSP, KES
Jeddah
02.2020 - Current
  • Project, Supervise and inspection of construction & development of Roads, Bridges, Tunnels, playgrounds, parks, Gardens, pedestrian walkways land scaping and infrastructure/utilities Work at all Jeddah
  • Responsibilities:
  • Read and understand the working drawings according to the plan and specifications of the Projects
  • Preparation of daily, weekly and monthly reports
  • Work on approved drawings and required speciation
  • Supervision of Earthwork Excavation and Filling
  • Maintaining the quality of the project as per the requirement of the client
  • Solve site related construction problems and consult with seniors.
  • Compiled measurement and marker data from plates and drawings using public records to determine geographical boundaries of land parcels and utility locations.

Senior Land surveyor

Government of KPK Pakistan Communication& Works
Swat
05.2018 - 08.2019
  • Infrastructure,
  • Responsibilities:
  • Supervise and inspect channel construction work according to approved profiles
  • Read and understand the working drawings according to the plan and specifications of the Projects
  • Preparation of daily, weekly and monthly reports
  • Work on approved drawings and required speciation
  • Supervision of Earthwork Excavation and Filling
  • Maintaining the quality of the project as per the requirement of the client
  • Solve site related construction problems in consultation with Senior Consultant Engineers.
  • Inspection of the as-built work for the final invoice.

Senior Land surveyor Project

Tepasa Consultant Engineers and Architects Jeddah
Jeddah
08.2015 - 04.2017
  • Pre-Stressed Concrete Water Reservoirs in Al Faisalih & Steel Water Reservoirs in Baraminic Jeddah city Saudi Arabia
  • Scope/Description:
  • Structure and Infrastructure
  • Responsibilities:
  • Review of Project Technical Specifications (PTS) including Scope of Work (SOW)
  • Steel water Tank 06 No’s (Día=110 meters, Height of walls=18.37 meters, Dome
  • Height=22.07meters) Capacity of water in one-tank=166666X6=1000000 cubic meters
  • Pre-stressed Tanks 04 No’s (Día=120 meters, Height=18 meters Capacity of water in one- Tank=181818m3
  • Chlorination building Powerhouse, Pump Station, SEC Room Control Building and Security building
  • During the start of excavation of the project check that the contractor its working with Approved
  • Documents (Shop drawings, Materials, Subcontractors, Methods of Statement, Quality Plan, formats,
  • Infrastructure development, including pipes network, open channel Road & Walkway
  • Inspection of natural ground level, setting out cutting, filling level and utilities
  • Concrete Inspection during cost concrete, LP test
  • Inspection of Steel Tank, Shell Plate Verticality, Bottom Plate Elevation, Roundness form, Levelness form, Plumbness form and Nozzle Orientation form,
  • Inspection as built work for the final invoice
  • Responsible for supervision of complete work from foundation to finishing of work
  • Layout,
  • Excavation as preapprove drawings & Instruction of Site Engineer for building
  • Project
  • Inspection of setting out of major head points and center line of water line, water
  • Culvert and Chambers
  • Supervision and Inspection of Road construction works according to approved
  • Profiles read and understood according to the plan and Specification of the project
  • Review of Project Technical Specifications (PTS) including Scope of Work (SOW)
  • Steel water Tanks 02 No’s (Día=95 meters, Height=19 meters) Capacity of
  • Concrete Elevated Tank 01 (Capacity of water in Elevated tank=500 m3
  • Chlorination building Powerhouse, Pump Station, SEC room control Building and
  • Security building
  • During the start of the excavation of project checking that the contractor its working with
  • Approved documents (Shop drawings, Materials, Subcontractors, Method of
  • Statement, Quality Plan, formats, etc.)
  • Infrastructure development, including pipes network, open channel Road & Walkway.Inspection of Natural ground level, setting out cutting, filling levels Lay out and utilities
  • Concrete Inspection during cost concrete, LP test
  • Inspection of Steel tank, Shell plates Verticality, Air leak between shell plates and
  • Nozzles, manhole welding and as-built work for the final invoice
  • Responsible for supervision of complete work from foundation to finishing of work Layout, Excavation as per approved drawings & Instruction of Site Engineer for Building project
  • Inspection of setting out of major head points and center line of water line, water
  • Culvert, and Chambers.

Senior Land surveyor Project

Ibrahim Bin Attaullah(Al-Sadie Consultant).
Jeddah
11.2010 - 01.2011
  • Management and Maintenance of Road Traffic Signs for the assigned area
  • Management of House Numbering System for the assigned area.

Senior Land Surveyor

Saudi Consolidated Engineering Company (Khatib &Alami)
Jeddah
05.2006 - 05.2009
  • Sewerage main interbranch lines and House connection
  • Responsibilities:
  • Performing coordination as a Team member, review the drawing for ongoing projects
  • Checking of Ground levels
  • Checking of Alignment of Excavation
  • Checking of Alignment of pipeline
  • Checking the Defalcation of pipes According to manufacturing company standard
  • Checking of Installation of Manholes
  • Checking of leveling of Manholes
  • Checking thickness of layers backfilling &subbase
  • Checking of alignment of pipes through Micro Tunnel
  • Checking of AS built and Installation of Sewerage Network in North Jeddah City.

Site Supervisor & Surveyor Project

Muhammad Ali Turki Mott MacDonald’s consulting
Jeddah
05.2009 - 05.2010
  • Jeddah CMS Project is a large project which include Roads, Bridges, Gardens, Hydraulics, Facilities
  • Responsibilities:
  • Supervise and inspection of road construction work according to approved profiles
  • Read and understand the working drawings according to project specifications
  • Inspection of road sub-grade, sub-base, Asphalting Rc2, Base course Mc1, wearing
  • Subbase, lean concrete and curb stone of footpath
  • Preparation of daily, weekly, and monthly reports
  • Handling of emergencies, and emergency duty
  • Work on approved drawings and required speciation
  • Supervision of Earthwork Excavation and Filling
  • Organize meetings with clients, owner, and consultants
  • Maintaining quality of project as per the requirement of the client
  • Solve the site related construction problem in consult with senior Consultant Engineers.

Senior Land surveyor

SAUDI CONSOLIDATED ENGINEERING COMPANY KHATIB & ALAMI
Khamis Mashyt (Al-Aseer Region)
01.2011 - 07.2015
  • Ministry of water & electricity General Directorate of water al Aseer Region
  • Scope/Description:
  • Structure, Infrastructure
  • Responsibilities:
  • Project (1st): AL-Asser water transmission Line 60kms khamis Mushyat to
  • Tureeb & 65kmskhamisMushyat to Wadi bin Hashibal Al-Asser Region Saudi Arabia
  • During my tenure in the company, I was responsible for the following tasks and
  • Responsibilities
  • Inspection of Natural ground level and utilities with contractor surveyors
  • Inspection of setting out of major head points and center line of water line
  • And chambers
  • Checking of shop drawings and Modifications according to the site problems
  • Inspection of as built work for the final invoice
  • Inspection of Natural ground level and utilities with contractor surveyors
  • Inspection of pipe laying Deflection according to specification of manufacturing
  • Company
  • Checking of shop drawing and Modification according to the site problems 2nd project: strategic water reservoirs for urban phase 2 Rawana Khamis Mushayat Al Aseer region
  • Reviewed of Project Technical Specifications (PTS) including Scope of Work (SOW)
  • Steel water Tanks 02 No’s (Dia=95 meters, Height=19 meters) Capacity of water in one
  • Tank=125000X2=250000 cubic meters
  • Concrete Elevated Tank 01 (Capacity of water in Elevated tank=500 m3
  • Chlorination building Powerhouse, Pump Station, SEC room control Building and
  • Security building
  • During the starting excavation of project checking that the contractor its work with
  • Approved documents (Shop drawings, Materials, Subcontractor, Method of
  • Statement, Quality Plan, formats, etc.)
  • Infrastructure development, including pipes network, open channel Road & Walkway
  • Inspection of Natural ground level, Elevation, setting out cutting, filling levels Lay out
  • And utilities
  • Inspection of Concrete during cost concrete, LP test
  • Inspection of Steel tank, Shell plates Verticality, Air leak between shell plates and
  • Nozzles, Manholes welding and as built work for the final invoice
  • Responsible for supervision of complete work from foundation to finishing of work
  • Layout, Excavation as per approved drawings & Instruction of Site Engineer for
  • Building project
  • Inspection of setting out of major head points and center line of water line, water
  • Culvert, and Chambers.

Chief Surveyor

Salco General Construction Company Al, Ministry of Water & Electricity Saudi Arabia
10.2002 - 05.2006
  • Storm water main line, Strom water Culverts boxes
  • Responsibilities:
  • Most relevant experience: Sitework execution
  • Layout and stakeout for Storm water network by the Total station
  • Preparing inspection request for the work done on sites
  • Site checking Ground Level and Utilities
  • As built work for the final invoice
  • Coordination with consultant for the site inspection
  • Concrete and Layoutof Strom water Culverts boxes.

Surveyor

Industrial Engineering Enterprise Construction
11.2000 - 03.2002
  • Abu Dhabi Sewerage scheme Contract No 718A, Sewerage main linesman lines
  • Responsibilities:
  • Most relevant experience: Site work execution
  • Layout and stakeout forSewerage water network by the Total station
  • Make request for all inspection of surveyor work
  • Site checking Ground Level and Utilities
  • Internal Inspection before consultant
  • Inspection with consultant for all activities
  • Excavation for sewerage network main, branch and house connection
  • Installation of sewerage pipe GRP, U-PVC, VCP main and branch line
  • Installation of all type’s manholes for sewerage ling
  • Installation of backdrop line form main and branch connection
  • Installation of inspection chambers for house connection
  • As built work for the final invoice
  • Coordination with consultant for the site inspection.

Surveyor

Admak General construction company, Abu Dhabi – Al Ain Express way
01.2000 - 11.2000
  • Tunnels and Interchanges
  • Responsibilities:
  • Pos Most relevant experience: Site work execution
  • Layout and stakeout for Roads, Bridges&Tunnels by the Total station
  • Preparing inspection request for the work done on sites
  • Sitechecking Ground Level and Utilities
  • As built work for the final invoice
  • Coordination with consultant for the site inspection Surveyor.

Trainee Sub Engineer Supervisor

Government of KPK Pakistan Communication &Works, C&W, Department, Swat Highways
10.1995 - 12.1997
  • Supervise and inspection of road construction work according to approved profiles
  • Read and understand the working drawings according to plan and specifications of the Project
  • Inspection of road sub-grade, sub-base, Asphalting Rc2, Base course, Mc1, wearing course and
  • Curbstone of foot path
  • Preparation of daily, weekly, and monthly reports
  • Handling of emergencies, and emergency duty
  • Work on approved drawings and required speciation
  • Supervision of Earthwork Excavation and Filling
  • Organize meetings with clients, owner, and consultants
  • Maintaining quality of project as per the requirement of the client
  • Solve the site related construction problem in consult with senior
  • Consultant Engineer.

Education

Diploma -

SCE - undefined

6 Month Certificate in Quantity Surveying

Skill Development Council
Peshawar Pakistan

Skills

Project site supervision

Project requirements

Project Management Professional (PMP)

Community project development

Accomplishments

  • 6monthsCertificateinQuantitySurveying programs from skill Development Council Peshawar Pakistan
  • Languages
  • English, Arabic, Urdu
  • COMPUTER SKILLES:
  • AutoCAD, Excel, MS-Office, Quantity Surveying.

Affiliations

Other Information

Father’s Name: Mian Gul Bad shah

Date of Birth: 1st Jan 1973

Marital Status: Married

Religion: Islam

Nationality: Pakistani

Current Location: Jeddah Saudi Arabia

Driving License: valid Saudi Arabia

Permanent visa: Transferable

Additional Information

KNOWLEDAGE OF TOTAL STATION INSTR:

Topcon DS103 AC

Topcon 200

Leica Ts 1203

Many kinds of Sokkia

Many kinds of Gps

Sound knowledge of using all kinds of instruments for Survey. Installation of programmable calculators Programming .

Software

COMPUTER SKILLES: AutoCAD, Excel, MS-Office, Quantity Surveying

Certification

Licensed [Job Title] - [Timeframe]

Interests

Social activity

Timeline

Land Surveyor

Louis Berger WSP, KES
02.2020 - Current

Senior Land surveyor

Government of KPK Pakistan Communication& Works
05.2018 - 08.2019

Senior Land surveyor Project

Tepasa Consultant Engineers and Architects Jeddah
08.2015 - 04.2017

Senior Land surveyor

SAUDI CONSOLIDATED ENGINEERING COMPANY KHATIB & ALAMI
01.2011 - 07.2015

Senior Land surveyor Project

Ibrahim Bin Attaullah(Al-Sadie Consultant).
11.2010 - 01.2011

Site Supervisor & Surveyor Project

Muhammad Ali Turki Mott MacDonald’s consulting
05.2009 - 05.2010

Senior Land Surveyor

Saudi Consolidated Engineering Company (Khatib &Alami)
05.2006 - 05.2009

Chief Surveyor

Salco General Construction Company Al, Ministry of Water & Electricity Saudi Arabia
10.2002 - 05.2006

Surveyor

Industrial Engineering Enterprise Construction
11.2000 - 03.2002

Surveyor

Admak General construction company, Abu Dhabi – Al Ain Express way
01.2000 - 11.2000

Trainee Sub Engineer Supervisor

Government of KPK Pakistan Communication &Works, C&W, Department, Swat Highways
10.1995 - 12.1997

Diploma -

SCE - undefined

6 Month Certificate in Quantity Surveying

Skill Development Council

Licensed [Job Title] - [Timeframe]

[Area of certification] Training - [Timeframe]

[Area of expertise] License - [Timeframe]

Bacha SaidSenior Land SURVEYOR