Motivated Project Manager with 16 years of experience controlling all stages of Million Dollar projects from inception through monitoring and closing, exceeding expectations of being on time and on budget. Considerable client-facing project experience has driven commitment to customer satisfaction.
Project Management Tools and techniques, Agile and Scrum Project management Techniques,Integration Management,Schedule Management,Cost management,Earned Value management,Risk Management
DESIGN THINKING BY IIM - C
PMP - Project Management Professional
DESIGN THINKING BY IIM - C
Project Cost Control Certificate from Contractor's Association (UAE,Dubai)
Project Planning Analysis and Control, George Washington University
Emirates Electrical Engineering, DUBAI,UAE
132kV Power Txn & Distribution & PV Solar Projects - SPC
2022 ( 25.75 MUSD)
1.AMWAJ SS (MRNAHRBR SS ,MRINACMN SS)
- 132KV Cabling and SS associated Works - Route Length - 5Km inside Marina
2.Interior Grid wall –535KW
3.BFL Technopark –1.2MW
4.Aster Hospitals (4) –1.5MW
5.Asmaks Food Services -1.2MW
6.Metafurn International – 735.48 KW
7.Guttman Industries- 600 KW
132KV Power Txn & Distribution Projects
2021 (32.87 MUSD)
TLCM SS (JHRC SS, HESSAST SS,
ITRN SS,)–132kV Cabling & SS associated works - Route Length - 10KM inside City
2020 (8.21 MUSD)
DUBAI HARBOUR (MRNAHRBR SS, AMWAJ SS, SEYAHIST SS, LAKE SS) -
132kV Cabling and other Associated Works for MERAAS @ Dubai Harbour
2019 (10.19 MUSD)
132kV MAADEN SS Cabling and Other Associated Works for DEWA @ Dubai
132kV SLCONPRK SS Cabling and Other Associated Works for DEWA @ Dubai
132kV FINCNTRD SS Cabling and other associated works for DEWA @ Dubai
2017-2019 (43.83 MUSD)
OPERADS SS-132/11kV GIS Substation for EMAAR @ Downtown Dubai
FINCNTRD SS -132/11kV GIS Substation for EMAAR @ Downtown Dubai
L&T, AL Khobar, SAUDI ARABIA
132KV Power Txn & Distribution Projects
2014 -2017 (34.2 MUSD)
1. Construction of DIE-6B – 115/13.8kV GIS Substation for SEC @ Saudi Arabia
2. Construction of Majeediyah 2 – 115/13.8kV GIS Substation for SEC @ Saudi Arabia
3.Construction/Reinforcement of Qatar Road 115/33/13.8kV GIS Substation for SEC @ Saudi Arabia
Alstom Grid,Chennai,India
EHV Power Projects
2012 - 2013
1.Monnet Ispat & Energy Ltd @ Alstom T&D – 132/11kV Substation
2.Power Grid Corporation of India Ltd,Myanmar – Substation Package @ Alstom T&D
3.PunjLloyd Ltd A/c CESC,Haldia - 2x300 MW TPP Project @ Alstom T&D
LM Windpower, Bangalore, India
NPD - R&D
2011-2012
1. 73.5M (World’s largest blade) Windmill blade project - NPD for Alstom France @ LM
2. 47.6P Windmill blade project – NPD for Gamesa @ LM Windpower
ABB Ltd, Bangalore, India
Process Automation Projects - Exports
2008-2011
1. Al-Katrana Cements (5000 TPD), Jordan
2. RAK White Cement(3000 TPD),UAE
2. Shivam Cements (5000 TPD), Nepal
4.Dungsum Cements,Bhutan
5.Arabian Cements,UAE
6.ULTRATECH Cement plant(8000 TPD), Tadapatri India
Dynatron Services,Chennai, India
2006-2008
Diesel Engine Control System - Services
2006-2008
Indian Naval and Coast Guard Ship
Emirates Electrical Engineering
Tabrez Patel, Division Manager - Substation,
Mobile No - +971552122043,
Email:tabrez@alrostamanigroup.ae
Vinod Thekkiniyil, Division Manager - 132kV Cabling
Mobile No - +971502667105,
Email:Vinod.thekkiniyil@alrostamanigroup.ae
Emirates Electrical Engineering, DUBAI,UAE
132kV Power Txn & Distribution & PV Solar Projects - SPC
2022 ( 25.75 MUSD)
1.AMWAJ SS (MRNAHRBR SS ,MRINACMN SS)
- 132KV Cabling and SS associated Works - Route Length - 5Km inside Marina
2.Interior Grid wall –535KW
3.BFL Technopark –1.2MW
4.Aster Hospitals (4) –1.5MW
5.Asmaks Food Services -1.2MW
6.Metafurn International – 735.48 KW
7.Guttman Industries- 600 KW
132KV Power Txn & Distribution Projects
2021 (32.87 MUSD)
TLCM SS (JHRC SS, HESSAST SS,
ITRN SS,)–132kV Cabling & SS associated works - Route Length - 10KM inside City
2020 (8.21 MUSD)
DUBAI HARBOUR (MRNAHRBR SS, AMWAJ SS, SEYAHIST SS, LAKE SS) -
132kV Cabling and other Associated Works for MERAAS @ Dubai Harbour
2019 (10.19 MUSD)
132kV MAADEN SS Cabling and Other Associated Works for DEWA @ Dubai
132kV SLCONPRK SS Cabling and Other Associated Works for DEWA @ Dubai
132kV FINCNTRD SS Cabling and other associated works for DEWA @ Dubai
2017-2019 (43.83 MUSD)
OPERADS SS-132/11kV GIS Substation for EMAAR @ Downtown Dubai
FINCNTRD SS -132/11kV GIS Substation for EMAAR @ Downtown Dubai
L&T, AL Khobar, SAUDI ARABIA
132KV Power Txn & Distribution Projects
2014 -2017 (34.2 MUSD)
1. Construction of DIE-6B – 115/13.8kV GIS Substation for SEC @ Saudi Arabia
2. Construction of Majeediyah 2 – 115/13.8kV GIS Substation for SEC @ Saudi Arabia
3.Construction/Reinforcement of Qatar Road 115/33/13.8kV GIS Substation for SEC @ Saudi Arabia
Alstom Grid,Chennai,India
EHV Power Projects
2012 - 2013
1.Monnet Ispat & Energy Ltd @ Alstom T&D – 132/11kV Substation
2.Power Grid Corporation of India Ltd,Myanmar – Substation Package @ Alstom T&D
3.PunjLloyd Ltd A/c CESC,Haldia - 2x300 MW TPP Project @ Alstom T&D
LM Windpower, Bangalore, India
NPD - R&D
2011-2012
1. 73.5M (World’s largest blade) Windmill blade project - NPD for Alstom France @ LM
2. 47.6P Windmill blade project – NPD for Gamesa @ LM Windpower
ABB Ltd, Bangalore, India
Process Automation Projects - Exports
2008-2011
1. Al-Katrana Cements (5000 TPD), Jordan
2. RAK White Cement(3000 TPD),UAE
2. Shivam Cements (5000 TPD), Nepal
4.Dungsum Cements,Bhutan
5.Arabian Cements,UAE
6.ULTRATECH Cement plant(8000 TPD), Tadapatri India
Dynatron Services,Chennai, India
2006-2008
Diesel Engine Control System - Services
2006-2008
Indian Naval and Coast Guard Ship
Emirates Electrical Engineering
Tabrez Patel, Division Manager - Substation,
Mobile No - +971552122043,
Email:tabrez@alrostamanigroup.ae
Vinod Thekkiniyil, Division Manager - 132kV Cabling
Mobile No - +971502667105,
Email:Vinod.thekkiniyil@alrostamanigroup.ae