Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
BASHIR  AHMED

BASHIR AHMED

ABU DHABU,UAE

Summary

More Than 20 years of practical experience in the UAE in Civil and Mechanical Engineering Fields of Structure, Water, Sewerage & Storm, Irrigation Water Pumping Stations, and Pipeline Infrastructure works, Public Housing Development, Urban Development Projects & Air Base (Commercial & Residential) and related Structures, Abu Dhabi Municipality (ADM), Al Ain Municipality(AAM), ADSSC Future Development, MCC Falcon Eye FOC Cable Network Project, etc., Diriyah Gate Development KSA and all Miscellaneous Rehabilitation Works Projects.

Overview

21
21
years of professional experience
3
3
years of post-secondary education

Work History

Tatweer Middle East & Africa LLC

Senior AutoCAD Operator / Draughtsman
Abu Dhabi, UAE
07.2022 - Current


ROAD PROJECTS

Abu Dhabi Municipality (ADM)

Dualization of Road Network for Al Adlah Road and Farms Area in Abu Dhab

Duties & Responsibilities

Preparation of Trial Pit Drawings.

Preparation of Survey layout of Storm water

Preparation of Longitudinal Profile of Storm water


New link Road Connection between Al Sarooj and Al Sanaiya Area in Al Ain

Duties & Responsibilities:

Preparation of Shop drawings and As-Built drawings for Proposed and Existing Road

Utilities for Telecommunication, Irrigation, electricity, Water Supply, Sewerage, etc.

Preparation of Traffic Diversion Drawings..

Preparation of Measurement Drawings for all work done, for Quantity Surveyor.

Backup of all Data Periodically


Abu Dhabi Municipality (ADM)

Upgrading of Intersections and Roads Network in Abu Dhabi City - Stage 2

Duties & Responsibilities:

Designing Of Road Diversion

Preparing of NOC,s Drawings for all the authorities

Preparing All services Drawings of Street Light, Telecommunication, Water Line, ADDC Electricity Drawings.


  • Widening Sheikh Zayed Bin Sultan street to five lanes within tunnels IP-111 and IP111A
  • Improving the intersection of Sultan Bin Zayed the First Street and Dhafeer Street
  • Enhancing the intersection of Sheikh Rashid Bin Saeed Street with Mashjar Street at the entrance to Al Rawda
  • Upgrading Sheikh Zayed Bin Sultan Street and the Khalifa City entrance to Maqasid Street
  • Improving AlKhaleej Al Arabi Street and the entrance to Khalifa City on Al Forsan Street
  • Enhancing Mahwi Interchange on E22 Road
  • Upgrading the intersection of Sheikha Fatima bint Mubarak Street and Sultan Bin Zayed the First Str


ADMCC Projects

Design Work for all Falcon Eye projects as per ADMCC Requirements and CAD standard for FOV & TLD submissions under Falcon eye Projects, Projects are Mohamed Bin Zayed City Mohammed Bin Rashid ST, Al Ain–Oman border Al Ain road ( Baniyas to Al Salamat) E22 Falcon Eye Network Project Al Ain Industrial Area & AL Ain City Center. Umm Emarat Park Preparation OF Civil Quantity for All Projects



Dorsch Holding GmbH – DC Abu Dhabi

Infrastructural Draftsman
Abu Dhabi, UAE
05.2007 - 06.2022


Preparation of plan & profile drawings for sewerage networks, storm water networks, irrigation networks, Pumping Station drawings, Pressure line chambers, Gravity sewer Storm line chambers, building works drawings etc .and also Preparation Shape drawings for Falcon Eye Project Abu Dhabi Island & main land sewerage, storm water and irrigation. Preparation of shop drawings for the Abu Dhabi & Al Ain Municipality. By using AutoCAD and MicroStation V8i & As Built drawing in GIS Format For Adssc.


Emirate of Abu Dhabi

ADSSC Contracts O-1463, O-1792 and O-1383.1 O-2535, O-2536

Sewerage Assets Enhancements Projects in Abu Dhabi City and

Musaffah Industrial Area with a Projection for the year 2030

ADSSC Contracts O-11087

Preparing NOC, s drawings for all the authorities


Ras Al Khaimah

Design Consultancy For Hayat Island

Abu Dhabi Mainland

Gantoot Hotel and Resort – Utility Corridors and Potable Water Network

Design Consultancy Services For South Shamkha Infill, Extensions, Infrastructure Evaluation and Community Facilities Re-Assessment - Potable Water Network

250 Emirati Villas with Public Facilities and Infrastructure in Al Samha – Utility Corridors and Potable Water Network

New Ghantoot Naval Base – Sewerage and Stormwater Networks

Extension of Sweihan Air Base - Sewerage and Stormwater Networks

250 Emirati Villas with Public Facilities and Infrastructure in Al Samha

Military Directorate Projects:

New Ghantoot Naval Base – Sewerage and Stormwater Networks

Extension of Sweihan Air Base - Sewerage and Stormwater Networks

Extension in Abu Dhabi Air Base - Sewerage and Stormwater Networks

Al Ain Mainland Projects

Infrastructure Facilities at Residential Plots in Mirfa

Design and Build of (300 Villas with 30 Plots) Emirati Housing Project in Al Hayer with Infrastructure Works

Construction of Emirati Housing Neighborhood – Sweihan Area (204 Villas)

Construction of Emirati Housing Neighborhood – Al Saad Area (306 Villas)

Emiratis Housing Development Jebel Hafeet - Al Ain (3000 Villas)

Neima Housing Projects – Al Ain (1000 Villas)

Al Wathba Lotus Garden – Abu Dhabi (9000 Villas)

Abu Samra Housing Project – Al Ain (100 Villas)


MCC-Civil Work Preparation of Shop/ As Built drawing & Cross Section as per

MCC requirements, Falcons Eyes2

Preparation of shop drawings Abu Dhabi Municipal CAD & GIS

Ain Housing Projects

H100 (Al Hilli) Water Supply Networks for Public Housing project at Al Hilli area in Al Ain

Y100 (Al Yahar) Water Supply Networks for Public Housing project at Al Yahar in Al Ain

S100 (Al Salamat) Sewer network for Public Housing project at Al Salamat area in Al Ain

N100 (Al Neima) Sewer network for Public Housing project at Neima area in Al Ain Phase

N200 (Al Neima) Sewer network for Public Housing project at Neima area in AlAinPhase


Design of Ghantoot Hotel & Resort with Infrastructure Works

Design Sewerage & storm Water network layout & Profiles

Design life of manholes, pipelines, structures, and shall be in comply with Clause 1.4.1 of ADSSC

Design Guidelines Section 1.

The minimum design life shall be as follows:

a) Pipelines 60 years

b) Structures 30 years

c) Mechanical and Electrical Equipment 15 years

d) Instrumentation 5 years

Mesaieed Industrial City- Manateq Leased Areas Qatar

Preparation of Shop/ As Built drawing & Cross Section & Sewerage Network Layout Profiles

Diriyah Gate Infrastructure Design & Construction Supervision

PreparationSewerage & storm Water network layout & Profiles

The Diriyah Gate Development Authority has been established by the Government of Saudi Arabia. The Authority (DGDA) is the master developer and operator of the Diriyah Gate Development which is expected to become a centre for history, heritage, and culture at a regional and national scale.

The Diriyah Gate Development is an exciting opportunity to blend the heritage of the Kingdom with a vibrant combination of luxury hotels, entertainment facilities, shopping, cultural museums, mosques, and residential elements.

Master plan & infrastructure for Asser Second Industrial

Preparation Sewerage & Water network layout & Profiles Dorsch Holding GmbH, KSA for the project of Master Plan & Infrastructure Design for Aseer Second Industrial City, Kingdom of Saudi Arabia”.

M/s. MACE Contractors Abu Dhabi

Civil Draftsman
Abu Dhabi, UAE
09.2004 - 04.2007

Projects Completed:

Contract - 71037 Abu Dhabi District Cooling Schemes D-029 & D-030 Chilled Water Distribution Network,

Chilled waterline (Supply & return pipe) from T Plantroom P3 – Zayed Militry Hopital & P3 to Bateen Air Base & NDM

Contract - 148/12 ADSS Relocation of Pumping Mains at Al-Ain Road & New Airport Road Intersection.Description Relocation of 1 No. 1100Ø Irrigation line & 2 Nos Sewage Pumping Mains(1200Ø) and Construction of thrust blocks on the pumping main at Al-Ain Road.

Contract - 142/20 Miscellaneous Urgent Works Phase – 17

Miscellaneous works (Irrigation, Sewerage, Drainage, Sewage Pumping main works.)

Contract - 509/6 Abu Dhabi Sewerage Scheme

Lowering Ground Water Table in Al Ajban and Al-Semeih Farms Phase.1

Contract - 159/6 Abu Dhabi Sewerage Scheme

Storm Water Project Mina Zayed Phase III (Storm Water Line for

(300Ø to 700Ø Pipe)

Contract - 71250 GHQ District Cooling Schemes

Project No, AD-04/71160

Contract - 147/9 Abu Dhabi Sewerage Scheme

Mussafah Sewerage Rehabilitation Project

Contract - 185/7 Abu Dhabi Sewerage Scheme Extension & Refurbishment of irrigation Pumping Station 1& 2 Civil Works

Contract - 830 Abu Dhabi Sewerage Scheme

Project for Sewerage and Surface Water Drainage

Works at Mohammad Bin Zayed Residential City.

Contract - 186/3 Abu Dhabi Sewerage Scheme

Emergency by - Passes to Sewerage

Pumping Station & Proposed Gravity

Line from Ps 5/1 to Gravity Main near Mps 6

Education

2 Year Diploma in Civil /Draftsman - Engineering

TTC Technical Collage
Lahore Pakistan
01.1995 - 12.1997

Skills

    Ø Micro Station V8

    Ø Course on Auto CAD-2025

    Ø CIVIL 3D

    Ø Microsoft word, Microsoft Excel


Languages

English
Proficient (C2)
Urdu
Proficient (C2)

Timeline

Tatweer Middle East & Africa LLC

Senior AutoCAD Operator / Draughtsman
07.2022 - Current

Dorsch Holding GmbH – DC Abu Dhabi

Infrastructural Draftsman
05.2007 - 06.2022

M/s. MACE Contractors Abu Dhabi

Civil Draftsman
09.2004 - 04.2007

2 Year Diploma in Civil /Draftsman - Engineering

TTC Technical Collage
01.1995 - 12.1997
BASHIR AHMED