I am a multilingual (English, French & Arabic) Mechanical engineer with 17 years of professional experience, Actually, as a pipeline/piping superintendent, during all those working years I have developed different skills in diverse disciplines. Skills Summary. - Positive, proactive, hardworking, and honest. - Very good organizational skills. - Adaptable to change - Work independently and prioritize workload effectively. - Professionalism at all times. - Excellent communication & interpersonal skills.

Pipeline Site engineer. Piping/pipeline Site supervisor, senior supervisors, subcontractor's manager, piping/pipeline coordinator, piping/ pipeline superintendent

Overview

19
19
years of professional experience

Work History

piping/pipeline superintendent

TECNICAS REUNIDAS
10.2022 - Current
  • Job role: piping/pipeline superintendent
    * Client: QATAR QAS
    * In the multinational company TECNICAS REUDENAS, RLTO EXPANSION
    AND OFFPLOT FACILITIES OF THE NORTH FIELD EXPANSION
    PROJECT (EPC-3) Ras Laffan Qatar
    Project: HANDOVER 01 underground pipeline corridor (Lean Gas36”. Barzan Lean Gas 36”, HANDOVER 07 Co2 12”, HANDOVER03 Rundown area (03 lines 18”, 01 line 16”, 02 lines 4”) piping installation A4 station, A3 Station,
    ISBL Barzan
  • Develop construction specifications and scope of work documentation
  • JSA team member, MST/JSA preparation
  • Develop the scope of work for the construction and installation of the new pipeline
  • Review and approve Inspection and Test Plans (ITP) for civil works
  • Review and approve the project Quality Management Plan
  • Monitoring employee performance and providing feedback on job performance to help them improve their work performance over time
  • Oversees daily operations at a construction site
  • Leads daily morning meetings with the entire crew
  • Follows construction drawings and approved plans
  • Uses popular construction management software
  • Orders necessary equipment, tools, and materials
  • Writes daily logs and other necessary documentation
  • Makes sure all local, state, and national business codes and regulations are followed
  • Ensures that the team adheres to all company policies and safety protocols
  • Works directly with the project manager, architect, engineer, electrician, and other specialists
  • Manage team tasks, monitor schedules, and handle BOQ variation claims
  • Receive, track, and coordinate resolution of all Site Technical Queries (STQ) from the EPC Contractor
  • Monitor site construction activities to ensure alignment with the project schedule
  • Review contractor's construction project quality dossier
  • Review contractors' daily and weekly progress reports
  • Manage EPC (QA/QC representatives)
  • Follow-up the Inspecting equipment and making repairs as needed
  • Coordinating with other departments to ensure that projects are completed on time and within budget
  • Scheduling workers' shifts and making sure they are aware of any schedule changes
  • Helping to plan and coordinate projects, such as construction or maintenance work, by communicating with managers or other team members
  • Coordinating with outside contractors to ensure that work is being done according to specifications
  • ICAPS, punch list commissioning.

Senior piping supervisor

TECNICAS REUNIDAS
06.2021 - 07.2022
  • In the multinational company TECNICAS REUDENAS, BU HASA integrated development project EPCC (BUIFD). Senior piping supervisor
    Project: connecting wells, manifolds, Plats with CDS, CLPG Manifold (pipeline corridor,
    water injection, gas injection, oil injection form 4” up to 32”
    * Client: ADNOC
  • Develop construction specifications and scope of work documentation
  • Preparation/reviewing MSTs TMP CSP
  • Permit application RAPET
  • Applies Global Project Methodology (Global Project Methodology) and Discipline Engineering Work Process Discipline
  • Performs plant and piping design activities as a member of a task force under the guidance provided by the leader and cooperates with multi-discipline designers Performs plant and piping design work in the 3D integrated design systems (NOVADUS 3D, CADWorx3D), Check and approve deliverable ISO to ensure customer satisfaction with the appropriate MTO
  • Conduct field inspections, record keeping, RFI, and travel to job sites
  • Check the PFDs on design and flow to equipment and chemical processing units
  • Flowing checklist, hydro test, punch list reinstatement, ICAPS
  • Review and make mark-ups and corrections to isometrics (hand sketches and CAD drawings)
  • Verify and authorize deliverable ISO to ensure quality standards while meeting customer satisfaction with the appropriate MTO
  • Direct piping site layout, and rout piping to all equipment, including isometric fabrication drawings and structural steel design.
  • Polished glass and mirrors in private and public spaces.

Piping, Pipeline Coordinator

TECNICAS REUDENAS
01.2016 - 02.2020
  • In multinational company TECNICAS REUDENAS EPCC TOUAT GAS Project. Piping. Pipeline Coordinator
    Project: TOUT GAS Algeria, wells, Manifolds CPF, Pipeline corridor, (6”, 8”. 12”, 20” and 28”)
    * Client: SONATRACH
  • Fully supporting the safe, timely, and cost-effective delivery of TR project designs, meeting the required safety, quality & performance criteria
  • Manage a team of Pipeline engineers, designers, and draftsmen in the preparation of project Pipeline engineering designs
  • Preparation of both engineering documentation and drawings
  • Preparation of material requisitions and material take-offs
  • Ensuring the necessary quality checking of every document and drawing issued within the Pipeline discipline
  • Ensure that internal discipline checks are carried out with comments incorporated for consistency across designs
  • Prepare the plans and schedules for the delivery of the project deliverables to meet the Client's requirements
  • Provide accurate reporting of progress and budget by the project control requirements
  • Identify and prepare trends as an early warning of potential scope changes, budget overruns, or schedule delays
  • Ensuring that the TR document control system is strictly adhered to, maintained, and kept up to date
  • Supporting the timely resolution of technical queries and site queries
  • Actively participating in all TR-provided training and key initiatives
  • Participating in quality inspections, at vendors' facilities and sites
  • Assisting in proposal preparation, planning, development of scopes of work, contract preparation
  • Collecting and reporting on lessons learned to ensure constant improvement within TR.

Deputy construction manager

Private Company
05.2015 - 09.2016
  • Deputy construction manager in a private company, realization works in civil engineering and piping subcontracting). Project: EPC002Gas Turbine Station
    of Boufarik 704.129 MW at site conditions.
  • Realization works in civil engineering and piping (subcontracting)
  • Project: EPC002Gas Turbine Station of Boufarik 704.129 MW at site conditions
  • Elaborating the plans of site management
  • Managing and directing project execution
  • Planning and organizing worksite
  • Drawing up progress reports (daily, weekly, and monthly)
  • Budgeting, cost estimation, and control.

Technical Division (subcontracts manager)

KOUGC/CCO
12.2012 - 04.2015
  • Works of water transfer between the reservoirs of IGHIL-EMDA and Mahwane, the provinces of Setif and Bejaia water pipeline (Ø70")
  • Negotiating offers
  • Comparative study of offers
  • Managing contracts and conventions by ensuring works execution is in accordance with the contract clauses
  • Preparing and checking reports, task sheets, and invoices
  • Drawing up contracts and appendixes
  • Preparing the overall provisory breakdown, the overall final breakdown, the closing appendix, etc.

Piping Engineer

SARPI
03.2011 - 03.2012
  • at the Technical and Follow-up Division of the Algerian company in charge of achieving industrial projects – SARPI joint-stock company, a subsidiary of SONATRACH. Design /Piping Engineer: EPCC Project of collection system ELMERK; pipeline corridor.
  • EPCC Project of collection system ELMERK; pipeline corridor
  • Preparing the application for material transfer (fitting, pipes, valves, pump...)
  • Supervising and following-up spools remaking (cutting, assembling)
  • Following up and transferring spools and mechanical components
  • Supervising assembly and adjustment.

Design/Pipeline Engineer

COSIDER Pipes
12.2009 - 03.2011

Mechanical Engineering Division

  • Project Φ12 « Pipe transport GAS PIPELINE (Ain Salah- Reggane)
  • Negotiating offers
  • Comparative study of offers
  • Managing contracts and conventions by ensuring work execution following the contract clauses
  • Drawing up contracts and appendixes.

Works Manager/Line Conductor

ENAC
05.2009 - 11.2009
  • Project Φ16 « Pipe transport GAS PIPELINE (Toggourt-El Oued)
  • Coordinating production process (civil engineering works, mechanical works, coating, cathode protection)
  • Drawing up daily, weekly and monthly reports
  • Radiography follow-up.

Design/Pipeline Engineer

COSIDER Pipeline & Piping
01.2009 - 04.2009
  • C18 Project 8"Pipe Transport GAS PIPELINE (the connection between municipalities)
  • Following-up welding
  • Following-up RT
  • Following-up coating and excavation.

Research Engineering /Technology Department

POVAL
01.2006 - 01.2009
  • Drafting a specification sheet based on needs and available resources (human, technical)
  • Designing parts using simulators and CAD software
  • Selecting suppliers and negotiating contractual conditions
  • Organizing production: assembling teams, allocating tasks, setting production rates
  • Supervising the work of production teams
  • Monitoring the quality of produced parts
  • Implementing performance measurement tools and proposing optimization systems
  • Providing regular reports to management.

Education

Baccalaureate Degree - mechanical engineering

Hight sckool TECNOCOM, and technology. LARBI TEBSSI berrouaghia w. Meadea Algeria

Bachelor's Degree - State Mechanical Engineer, Structural and Mechanical Characterization of stainless-steel grade (martensitic difference)

University of technology SAAD Dahled Blida Algeria
01.2006

University Applied Studies Degree - Technological Study of high-capacity milling machine and Proposing the improvement of the lubrication system

Hassiba Benbouali University of technology Chlef Algeria
01.2000

Skills

  • Microsoft Office
  • Microsoft Project
  • Autocade
  • Autodesk
  • Solid works
  • Vision
  • Navis

Languages

Arabic
Advanced (C1)
French
Advanced (C1)
English
Advanced (C1)

Timeline

piping/pipeline superintendent

TECNICAS REUNIDAS
10.2022 - Current

Senior piping supervisor

TECNICAS REUNIDAS
06.2021 - 07.2022

Piping, Pipeline Coordinator

TECNICAS REUDENAS
01.2016 - 02.2020

Deputy construction manager

Private Company
05.2015 - 09.2016

Technical Division (subcontracts manager)

KOUGC/CCO
12.2012 - 04.2015

Piping Engineer

SARPI
03.2011 - 03.2012

Design/Pipeline Engineer

COSIDER Pipes
12.2009 - 03.2011

Works Manager/Line Conductor

ENAC
05.2009 - 11.2009

Design/Pipeline Engineer

COSIDER Pipeline & Piping
01.2009 - 04.2009

Research Engineering /Technology Department

POVAL
01.2006 - 01.2009

Baccalaureate Degree - mechanical engineering

Hight sckool TECNOCOM, and technology. LARBI TEBSSI berrouaghia w. Meadea Algeria

Bachelor's Degree - State Mechanical Engineer, Structural and Mechanical Characterization of stainless-steel grade (martensitic difference)

University of technology SAAD Dahled Blida Algeria

University Applied Studies Degree - Technological Study of high-capacity milling machine and Proposing the improvement of the lubrication system

Hassiba Benbouali University of technology Chlef Algeria
Benaissa Sabour