Bimal Viswambharan

Power Plant Professional
Abu Dhabi

Summary

Power Plant Professional in the field of EPC/EPCM since 1998 .

Adherence to EHSMS.

Thorough in Construction Supervision ,QA/QC, Walk Downs , Punch List Preparation ,Testing & Commissioning .

Pre Commissioning & Commissioning

Start Up and Maintenance

Warranty Coordination

Mechanical Maintenance

Outage & Shut Down Maintenance

MED/MSF Desalination Maintenance

SME for HRSG & Fired Boilers

Rotating & Static Equipment Condition Monitoring

Projects & modification

Root Cause Analysis

PM Review

Overview

25
25
years of professional experience
8
8
years of post-secondary education

Work History

Lead Mechanical Engineer

ITM O & M Company Ltd, Arabian Power Company
Abu Dhabi
2017.01 - Current

Responsible for Technical Support, Critical spares management, SME for Steam Turbine & HRSG, Boiler /HRSG Inspections, Chemical Cleaning, Reverse engineering/Alternative Sourcing, Vibration Monitoring, Welding Advice , MED /MSF Desalination Plants Inspection , Maintenance & Process Improvement Studies, Critical Equipment Maintenance , Lube Oil Analysis, Thermography, Failure investigations, Policy / Procedure preparation and review, Projects / Modification etc.

Material Selection , WPS selection , Alloy Steel Piping Repair procedure preparation.

Took active role in critical tasks of Mechanical Maintenance of Station B and Life Extension Projects of Um Al Nar Old Power Station fired boilers.

Accomplishments :

  • Responsible for Steam Turbine Outages (2013 ,2022&2023) Successful return to service in all major outages with optimized spares arrangement. Zero HSE violations .
  • Established effective Lubricant Monitoring Program
  • Specific & Accurate corrective actions & Root cause identifications.
  • Timely Completion of Outages and Projects.

Mechanical Maintenance Section Engineer

Arabian Power Company
Abu Dhabi
2010.07 - 2017.01
  • The position of Section Engineer - independent responsibility for the Mechanical Maintenance team under the Maintenance Manager for the 1550 mW CCPP & 95MIGD Desalination Units and Balance of Plant
  • Was directly responsible for Preventive Maintenance Review, Planning & Execution, Corrective Maintenance, Spares forecast and procurement, Preparation for Daily & Outage Works, Budget forecast preparation, Evaluation of Service Contracts, Outage scope preparation and execution, Employee Training, ISO /OSHAS /EHSMS Compliance
  • Contributed effectively for coordination with Engineering, Operation and Other Maintenance departments to achieve goal of reliable plant operation without compromising on Plant availability, quality and EHSMS
  • Contribution to department includes Identifying and implementing on job training, Ingenious Outsourcing of Services, and procurement of spares to reduce cost and time, Plant modification proposals, Safety Awareness.
  • Direct supervision of all major shut down jobs on Main Steam System .
  • Spares Sufficiency and Manpower utilization, Optimization of breakdown maintenance.

Mechanical Construction Engineer

SNC Lavalin International, Emirates Aluminum
Abu Dhabi
2009.05 - 2010.06
  • EPCM Contract of EGA , Phase 1,2000mW CCPP, Al Taweelah, Abu Dhabi
  • The Power Plant consists of 6 x 250 MW GE Fr 9FA Gas Turbines, 4 x 730Tons/Hour Doosan HRSG and 2 x GE C7 Steam Turbine Generators (390 MW)
  • Site supervision of the Erection of GT & HRSG Equipment & Piping and assisted in Steam Turbine Erection jobs in Coordination with GE team, on behalf of the EPCM reporting to the General Field Superintendent (Power Plant)
  • HRSG Erection, GTG Equipment & Piping Inspection, Piping Hydro-testing, Walk downs , Punch List Clearance, QC documents review / verification .

Accomplishments: Turn around on GT erection activities, established effective team work with Contractor supervisors and QC inspectors .

Mechanical Engineer

Toshiba Corporation
Abu Dhabi
2005.01 - 2009.05
  • EPC Contract of 1550mW Power Plant
  • Warranty Coordination, Maintenance, startup & Commissioning Assistance, Pre-Commissioning and Equipment & Piping Erection
  • Successfully completed tasks ranging from Equipment Erection to Warranty Coordination for the 1550 MW CCPP, Consisting of GE Fr 9FA Gas Turbines, Toshiba Steam Turbines & Doosan HRSG

Activities in chronological order

  • Balance of Plant Erection
  • HRSG - Erection, Walk down, Punch lists, hydro-test, chemical cleaning, Pre-Commissioning & Startup Assistance, Maintenance & Modifications
  • Steam Piping Systems -Walk down, Punch List clearance, Hydro test, Chemical Cleaning,
  • Steam /Air Blowing Preparation and execution
  • Fuel Gas piping – Chemical Cleaning, Pre commissioning, Restoration, Gas Charging & leak test.
  • Fuel Oil – Chemical Cleaning ,Air Blowing, Flushing& Restoration
  • Gas Turbine – Running Maintenance, Warranty Coordination
  • Steam Turbine – Start Up Assistance, Maintenance & Modifications
  • Warranty Coordination /Defect Liability Period until handover .

Mechanical Engineer

M/s Binees Engineering Constructions, Kayamkulam Combined Cycle Power Plant
Kerala
2001.10 - 2004.08

Contractor to National Thermal Power Corporation

  • Power Plant & Balance of Plant Maintenance
  • Forced Shutdown Maintenance
  • Outage Maintenance for HRSG & Steam Turbine.

Accomplishments: Team work ,Timely Completion , No rework , Zero Safety Issues .

Engineer (Mechanical

Engenius Erectors Pvt Ltd
Kayamkulam
2000.01 - 2001.08
  • Contractor to National Thermal Power Corporation
  • Managed team of Supervisors, Technicians for Annual running Mechanical Maintenance of 350 mW Combined Cycle Power Plant and BOP.
  • Followed Client Permit to Work system
  • Zero HSE incidents

Mechanical Engineer

Engenius Erectors Pvt Ltd, National Thermal Power Corporation
Chennai, Kayamkulam
1998.04 - 2000.01

Sub Contractor to BHEL for 350 mW CCPP

  • GE 9E Gas Turbine & Generator erection
  • Integral Piping Erection
  • Pre Commissioning Assistance to BHEL
  • Commissioning Team Lead for Sub Contractor
  • Start up and & Running Maintenance
  • Modifications

Accomplishments - Reduced project delays by accelerated Pre commissioning , commissioning activities and Start up.

Equipment used was fairly unfamiliar to client ,EPC and Contractor alike. Bottle necks were overcome with close coordination , honest & transparent dealing with OEM , Client & EPC . Commendable performance during commissioning & start up of Power units.

Education

Bachelor of Engineering - Mechanical Engineering

Manipal Institute of Technology
Mangalore , Karnataka
1987.08 - 1995.12

Skills

    EPC

undefined

Accomplishments

  • Thermography level 1 & level 2 from ITC
  • Vibration Analysis BINDT Level 01
  • Ultrasonic Leak detection techniques
  • Software Proficiency:
  • MS office, CMMS (maximo)

Timeline

Lead Mechanical Engineer

ITM O & M Company Ltd, Arabian Power Company
2017.01 - Current

Mechanical Maintenance Section Engineer

Arabian Power Company
2010.07 - 2017.01

Mechanical Construction Engineer

SNC Lavalin International, Emirates Aluminum
2009.05 - 2010.06

Mechanical Engineer

Toshiba Corporation
2005.01 - 2009.05

Mechanical Engineer

M/s Binees Engineering Constructions, Kayamkulam Combined Cycle Power Plant
2001.10 - 2004.08

Engineer (Mechanical

Engenius Erectors Pvt Ltd
2000.01 - 2001.08

Mechanical Engineer

Engenius Erectors Pvt Ltd, National Thermal Power Corporation
1998.04 - 2000.01

Bachelor of Engineering - Mechanical Engineering

Manipal Institute of Technology
1987.08 - 1995.12