Cenk Koray Satana

Dub,United Arab Emirates

Summary

Experienced project manager with focus on delivering complex projects within scope, time, and budget. Proven capability to lead cross-functional teams, streamline processes, and drive project success through strong communication and problem-solving skills. Adept at managing stakeholder expectations and mitigating risks to ensure project alignment with business objectives.

Overview

21
21
years of professional experience
24
24
years of post-secondary education
1
1
Certification

Work History

Investment & Industrial Facility Manager

Pilenpak Commitment Packing
Manisa
01.2018 - 01.2024
  • Collaborated with various subcontractors to maintain project feasibility and design accuracy
  • Created detailed project plans outlining scope, objectives, timelines, and budgets
  • Ensured project costs were controlled and stayed within approved budgets
  • Oversaw expense tracking, compiled cost reports, handled change orders
  • Managed supplier and subcontractor contract negotiations
  • Revised schedules to manage delays and alterations in project scopes
  • Directed project teams of consultants, contractors, and suppliers
  • Organised routine meetings to review progress and ensure team alignment
  • Generated and presented detailed progress, financial, and completion reports
  • Ensured compliance with construction safety regulations
  • Ensured compliance with on-site safety protocols through inspections
  • Managed €9,500K solvent recovery plant EPC project to completion
  • Managed €4,500K solar energy plant EPC project to completion
  • Managed €6,500K construction of WUH printing facility plant EPC project to completion
  • Managed €1,200K Acetate Storage Plant EPC project to completion
  • Managed €860K for 980 KWH cooling capacity chiller plant EPC project to completion

Investment and Maintenance Group Manager

FEAST Özgörkey
İZMİR
01.2016 - 01.2018
  • Coordinated daily operations for site tasks
  • Led mechanical and electrical maintenance teams
  • Led 6Sigma, Kaizen, and 5S projects to enhance manufacturing efficiency
  • Implemented smart machinery to increase productivity and cut down on manual work
  • Conducted daily technical maintenance to ensure food safety compliance with BRC and AIB standards
  • Created yearly maintenance schedule and identified necessary spare parts
  • Developed detailed budget plans to manage operational costs effectively.
  • Collaborated with Operations, Automation, and Supply Chain teams to expedite asset procurement decisions
  • Prepared project plans for new machinery investment and performed cost analysis
  • Coordinated machinery and equipment for new process line investments

Project Manager

EMC Engineering Manufacturing Const.& Consultant Company
İZMİR
01.2014 - 01.2016


  • Coordinated frequent updates and progress discussions with engineers and suppliers
  • Ensure design documents are accurate and shared with relevant parties
  • Documented design changes and promptly communicated updates
  • Ensured manufacturing compliance with industry standards and regulations
  • Conducted site visits to assess feasibility with engineers and suppliers
  • During to conflicts arise, I involve all parties in brainstorming solutions to ensure everyone’s input is considered
  • Coordinated project timelines and deliverables with construction, mechanical, and subcontractor teams
  • Planned site activities using MS Project and monitored daily progress
  • Prepared comprehensive weekly and monthly progress reports for submission to headquarters
  • Managed subcontractor budgets through regular monitoring and cost tracking
  • Managing and controlling API tanks manufacturing and erection on site, equipment installation, steel structure manufacturing and erection, underground piping, atmospheric steel tank manufacturing and erection on site
  • Led team to achieve project milestones
  • Managed MP project for Air Liquid at Petkim Refinery totalling 3.5 million USD
  • Oversaw 2500 tonnes pipe rack fabrication, totalling 3.8 million USD at Petkim Refinery
  • Managed Ravago Pentane Tanks Project 4.85 million USD
  • Managed Eltaş Power Transformers Facility Project worth 2.65 million USD
  • Managed Opet Fuchs Storage oil tank replacement project 3.75 million USD
  • Managed 26 pieces crude oil tank manufacture and erection API tank project 12.5 million USD at Socar Star Refinery

Mechanical Project Manager

Aktor & Arbiogaz join venture Company
İZMİR
01.2012 - 01.2014
  • Managed subcontractor coordination at site for all facilities
  • Coordinated all site activities using MS Project and monitored progress daily
  • Led mechanical site works coordination
  • Prepared weekly and monthly progress reports for construction manager
  • Directed and monitored financial budgets for subcontractor activities
  • Supervised on-site piping erection and equipment installation
  • Led manufacturing, erection, and testing of underground and above-ground pipelines
  • Installed equipment following assembly drawings
  • Specialised in manufacturing and erecting industrial pipes based on isometric diagrams
  • Successfully delivered on tasks within tight deadlines.
  • Installed clean water and firefighting lines per NFPA standards
  • Constructed and installed steel structures at project locations
  • Coordinated cross-functional team efforts to ensure project success

Deputy Project Manager

Hexagon solid waste treatment corporation
İstanbul
01.2010 - 01.2012
  • Collaborated with architects, engineers, suppliers, and subcontractors to ensure project feasibility
  • Assisted Project Manager in smooth running of daily activities by performing admin tasks such as manpower, progress and site activities.
  • Coordinated events by managing budget, logistics and event support.
  • Coordinated machinery and equipment for new process line investments
  • Organised master calendar of appointments, operational targets and projects.
  • Managed risks, minimising potential project delays.
  • Drafted documents and reports for management review.
  • Conducting start-stop operations, commissioning, and cold tests to ensure the equipment is operational in line with progress automation


Co-Founder/Manager

KS Engineering Ltd. Sti
İZMİR
01.2009 - 01.2010
  • Optimised daily procedures for improved efficiency and cost savings
  • Utilised technology solutions, increasing operational efficiency.
  • Coordinated between client and main supplier for project success
  • Installed mechanical equipment and piping systems for wastewater treatment plant
  • Erected mechanical equipment and piping for water treatment plant
  • Managed firefighting equipment and piping works at Zorlu Energy wind plant
  • Managed underground firefighting lines and equipment projects for Schneider Electric
  • Managed firefighting lines equipment and piping works at EnerjiSA & Verbund 460 MW power plant
  • Oversaw all mechanical equipment and piping works at 54 MW power plant

Piping Group Chief

Gama international industry
Jeddah, Suudi Arabistan
01.2007 - 01.2009
  • The task definition included, the mechanical equipment installation, the manufacturing and installation of piping on site, coordinating and reporting progress meeting between client and company, the management and administration of the subcontractors, controlling the progress payment of subcontractors, coordinating of welding and piping sections
  • Installation of the engine motors and alternators with 30 MW capacity of MAN brand, Adjustment of the coupling between engine and alternator, Installation of the heat recovery boiler, Installation and manufacturing of crude oil, HTO, HFO, steam pipelines
  • Replacement of the fuel oil tanks, Installation of many different types of pump and valve trains, Installation of the jet filter, Manufacturing and installation of the process piping on pipe rack regarding to isometric drawings, performing the start stop, commissioning, cold test to control the equipment

Mechanical site engineer

System yapi construction
İstanbul
01.2005 - 01.2007
  • Monitored and controlled mechanical installations progress
  • Managed and supervised subcontractor activities
  • Managed progress payments for subcontractors
  • Reported mechanical progress to project manager
  • Performed start-stop commissioning and cold tests for equipment control systems
  • Prepared thorough final project report concerning mechanical works
  • Installing and manufacturing various components including pretreatment unit fine screens, air blowers, submersible pumps, pressure tanks, fire pumps, digester sets, H2S removal units, booster sets, settlement tank scrapers, package-type biological treatment units, sand filters, water softening equipment, activated carbon filters, grit classifiers, conveyors, and aerators
  • Sişe Cam Trakya Glass Bulgaria EAD – Bulgaria
  • Waste Water Treatment Plant – Türkiye
  • Zalau waste water Treatment plant – Romania
  • Sibiu waste water Treatment plant – Romania
  • Satumare waste water Treatment plant – Romania

Site Engineer

Tepe Construction
Erzurum
01.2004 - 01.2005
  • Completed mechanical equipment installation for BTC crude oil line project
  • Installed Wartsilla SG 34 type 20-cylinder Otto cycle engine for all facilities
  • Managed mechanical installation progress
  • Installed industrial piping and cooling lines for various engine components
  • Performed start and stop procedures to manage machinery
  • Managed crude oil pipeline operations for BP and BOTAŞ Corporation
  • Used advanced surveying technology, ensuring precise measurements and alignments.
  • Prepared detailed reports to communicate progress to stakeholders.

Workshop Chief

Gimas A.S.
İZMİR
01.2003 - 01.2004
  • Managed and led workshop team
  • Facilitated weekly meetings with teams, effectively addressing any concerns or issues raised.
  • Created preparation progress plan for client
  • Coordinated completed parts for shipment following manufacturing guidelines
  • Managed quality-related components
  • Presented technical progress reports to section manager
  • Estimated costs of labour and materials to manufacture, install, or maintain specified equipment.

Education

Bachelor of science - Mechanical Engineering

Celal Bayar University
Manisa / Türkiye
09.1996 - 06.2020

Skills

  • Project Management
  • Risk Assessment
  • Strategic planning and decision making
  • Stress Control and Time Organisation
  • Effective communication
  • MS project proficiency
  • API 650 tank erection methods
  • Industrial piping and equipment setup
  • Firefighting Systems Implementation
  • Underground piping and pipe rack installation
  • Domestic and biological wastewater systems management
  • P&ID and isometric drawing proficiency
  • Budget management

Certification

  • BTC TRAINING CERTIFICATE Supervisor Safety Leadership, British Petrol
  • AUTO/CAD DESIGN SOFTWARE PROGRAM, the chambers Of Mechanical Engineers
  • SANITARY INSTALLATION CERTIFICATE, the chambers Of Mechanical Engineers
  • LEVEL TWO WELDING INSPECTOR CERTIFICATION, EMC
  • EFFECTIVE TIME MANAGEMENT PROGRAM, HEXAGON
  • REDUCER SELECTION AND MAINTENANCE METHODS, YILMAZ REDUKTOR
  • BEARING SELECTION AND MAINTENANCE METHODS, SKF BEARING
  • LEAN PRODUCTION METHODS, GEMBA PARTNER, FEAST
  • FSPCA PREVENTIVE CONTROLS FOR HUMAN FOOD, ÖZGÖRKEY
  • ISO 50001:2018 ENERGY MANAGEMENT SYSTEM, PİLENPAK
  • ISO 19011:2018 INTERNAL AUDITOR CERTIFICATION, PİLENPAK

Languages

English
Advanced

Timeline

Investment & Industrial Facility Manager

Pilenpak Commitment Packing
01.2018 - 01.2024

Investment and Maintenance Group Manager

FEAST Özgörkey
01.2016 - 01.2018

Project Manager

EMC Engineering Manufacturing Const.& Consultant Company
01.2014 - 01.2016

Mechanical Project Manager

Aktor & Arbiogaz join venture Company
01.2012 - 01.2014

Deputy Project Manager

Hexagon solid waste treatment corporation
01.2010 - 01.2012

Co-Founder/Manager

KS Engineering Ltd. Sti
01.2009 - 01.2010

Piping Group Chief

Gama international industry
01.2007 - 01.2009

Mechanical site engineer

System yapi construction
01.2005 - 01.2007

Site Engineer

Tepe Construction
01.2004 - 01.2005

Workshop Chief

Gimas A.S.
01.2003 - 01.2004

Bachelor of science - Mechanical Engineering

Celal Bayar University
09.1996 - 06.2020
  • BTC TRAINING CERTIFICATE Supervisor Safety Leadership, British Petrol
  • AUTO/CAD DESIGN SOFTWARE PROGRAM, the chambers Of Mechanical Engineers
  • SANITARY INSTALLATION CERTIFICATE, the chambers Of Mechanical Engineers
  • LEVEL TWO WELDING INSPECTOR CERTIFICATION, EMC
  • EFFECTIVE TIME MANAGEMENT PROGRAM, HEXAGON
  • REDUCER SELECTION AND MAINTENANCE METHODS, YILMAZ REDUKTOR
  • BEARING SELECTION AND MAINTENANCE METHODS, SKF BEARING
  • LEAN PRODUCTION METHODS, GEMBA PARTNER, FEAST
  • FSPCA PREVENTIVE CONTROLS FOR HUMAN FOOD, ÖZGÖRKEY
  • ISO 50001:2018 ENERGY MANAGEMENT SYSTEM, PİLENPAK
  • ISO 19011:2018 INTERNAL AUDITOR CERTIFICATION, PİLENPAK