Common Q PLC software

Have thirty two (32) years’ experiences in the field of I&C related engineering in KEPCO E&C. During working at KEPCO E&C, I have performed various tasks including system design of major safety systems of I&C. The main tasks I have performed are as follows:
As an Instrumentation and Control (I&C) Engineer at KEPCO since June 1995, I have been responsible for performing various system designer’s works of YGN (Hanbit) 5,6, UCN (Hanwol) 5,6, SKN (Shin-Kori) 1,2,3,4,5,6, SWN (Shin-Wolsong) 1,2, BNPP 1,2,3,4, and SHN (Shin-Hanwol) 1,2 for twenty (27) years. I am mainly involved in safety systems (PPS, CPCS, ESF-CCS) as responsible engineer as well as specialist for eighteen (20) years and as team leader for seven (7) years.
I have participated in the MMIS development of the Advanced Power Reactor 1400 (APR1400) in the initial stage, after completing its concept design for the Korea Next Generation Reactor (KNGR). I have mainly performed in-detail design of MMIS of APR1400 for SKN 3, 4.
As a supervisor and a Project Manager (PM) for an oversees project, I have been responsible for performing managements to get APR1000 NPP design certificate of EUR Rev. E and to prepare a biding documents for the Dukobany NPP of Czech Republic for three (3) years.
As a Site Manager (SM) for BNPP, I have been responsible for providing system designer’s support to complete the commercial operation for BNPP units 3, 4 for two (2) years.
Even in the middle of the system design works, I have also participated in the various Design Change Package (DCP) works for Korean domestic NPPs including “the reactor trip prevention when single 12 finger drops”.
Nuclear Safety System Design
undefinedCommon Q PLC software
POSAFE Q PLC software
1. July 2016 - July 2020, Engineering Manager for Reactor Trip Prevention when single 12 finger CEA drops for OPR1000 and APR1400
My responsibilities include:
Preparation of contract and its technical documents
Preparation of planning and Schedule for the project
Coordination of the entities related to the project (KHNP, KEPCO NF, Westinghouse Electric Company, etc.)
Coordination of the technical departments (Mechanics, Performance and Safety Analysis in KEPCO E&C)
Review and approval of PSAR/FSAR inputs and Technical Specification
Review and approval of topical report documents and preparing the answers to questions
Providing licensing supports to KINS for design changes
Providing technical supports to KHNP for various site testing
2. July 2016 - July 2020, Engineering Manager for CPCS High Speed Link heartbeat issues for SKN 1,2,3,4, SWN 1,2
My responsibilities include:
Investigating the issues on-site CPCS
Preparation of Design Change Package including resolution report
Modification of the software design documents of CPCS
Modification of the software source code
Review the all testing procedures and reports
Installation of the updated software in site
3. July 2016 - July 2020, Engineering Manager for CPCS power supply replacements for Hanbit and Hanul NPPs 5,6
My responsibilities include:
Investigation of the issues on site CPCS
Preparation of Design Change Package
Preparation of procurements documents for new power supplies
Providing the supports for site replacement