Summary
Overview
Work history
Education
Skills
Certification
Languages
Hobbies
Trainings
current CTC
Expected salary
Employment History
Affiliations
Timeline
Generic
CHIRADIP CHAKRABORTY

CHIRADIP CHAKRABORTY

Abu Dhabi,United Arab Emirates

Summary

Accomplished professional with Civil Engineering complemented by a strong foundation in project management. Demonstrates proficiency in MS Excel and MS Word, Auto cad ,ensuring efficient project execution while adhering to HSE regulations. Possesses a comprehensive understanding of the project lifecycle and lean principles, aiming to leverage these competencies towards innovative solutions in future projects.

Proficient Civil Engineer with 24 years of experience driving over 11projects to completion. Skilled in overseeing technical staff ensuring that projects are completed on schedule, within budget and according to specifications.

Overview

24
24
years of professional experience
14
14
years of post-secondary education
1
1
Certification

Work history

Project Engineer

NATIONAL MARINE DREDGING COMPANY
2025.03 - 2026.06
  • Completed installation of over 5000 quay wall blocks in dry berth and liquid berth areas at -18.6 NADD, contributing to project milestones.
  • Managed cast in situ capping beam of 2.25 m thickness over quay wall, with 20 out of 27 panels completed.
  • Project: TAZIZ Logistics Port Package
  • Worked in TAZIZ Island
  • Role & Responsibilities
  • Implemented strict safety regulations, securing a safe working environment for all staff members.
  • Optimized project performance by implementing efficient engineering solutions.
  • Coordinated cross-functional teams, resulting in seamless project execution.

Project Engineer

NATIONAL MARINE DREDGING COMPANY
DAS ISLAND, ABUDHABI
2024.03 - 2025.02
  • Project: Reclamation of Existing DAS Island Tamkeen project, P5
  • Project value: AED 2.80 billion
  • Description: It is a project of extension of Existing DAS Island reclamation & dredging at West 1 & West 2 location.
  • Implemented strict safety regulations, securing a safe working environment for all staff members.
  • Coordinated cross-functional teams, resulting in seamless project execution.

Project Engineer

NATIONAL MARINE DREDGING COMPANY
ABUDHABI
2023.03 - 2024.02
  • Manage the construction site on a day-to-day basis, including supervising the labour force, monitoring subcontractors, checking materials, inspecting work and overseeing quality control. Ensure the project is delivered on time and on budget by setting benchmarks, agreeing budgets and monitoring progress.
  • Project: Construction of Artificial Island project at Hail & Ghasha.
  • Project value: AED 4.89 billion
  • Description: It is a huge project of constructing Artificial Island over Arabian Sea under ‘ADNOC’ Client. Doing dredging & reclamation, constructing of quay wall, piling, DC Island, break water, Escape boat Jetty, Helipad, etc.
  • Role & Responsibilities
  • Implemented strict safety regulations, securing a safe working environment for all staff members.
  • Developed bespoke solutions for complex client requirements, demonstrating innovation and problem-solving skills.

Construction Manager

Bangalore Metro Rail Corporation LTD.
2020.10 - 2023.02
  • Defined primary duties as Construction Manager to ensure alignment with project objectives.
  • Looking after an underground station as a Construction Manager. Total planning & mobilization, finalisation of drawing along with EE team & execution the job in time with Quality & maintaining safety requirements.
  • Coordinated with client BMRCL and consultant BMRCL to facilitate seamless project execution.
  • Coordinated with Project Stores Dept. for internal audits and quarterly reconciliation of engineering materials, ensuring accuracy and compliance.
  • Led the construction of site set up and supervised soil investigation and topographical survey work.
  • Project: Phase II –R6 Underground metro project RT-04 TANNERY ROAD to NAGAWARA
  • Description: This important assignment comes under Bangalore Metro Rail Corporation LTD. Project cost is 1771.0 Crores. Construction of 4.591 Km Underground metro projects from Tannery road to Nagawara by bottom up method.

Construction Manager

Kolkata Environmental Improvement Project, Kolkata Municipal Corporation
2017.04 - 2020.09
  • Project: Rehabilitation and Refurbishment of Water Works at Palta & Garden Reach Water Works
  • Description: This important assignment comes under Kolkata Environmental Improvement Project, Kolkata Municipal Corporation for arrest environmental degradation and Improves the Quality of life in Kolkata. This project funded by Asian Development Bank. Value of the Project 80.56Crores. This project comprise of Rehabilitation/ strengthening of raw water intake jetty no. 2. Strengthening/ construction of new embankment in between presetting tank nos2 & 3 including construction of road over it.
  • Construction of a new water treatment plant consisting of raw water collection well, par shall flume, flash mixer, flocculator, inclined plate settler clarifier, rapid sand gravity Filter, chemical house etc. including raw water transmission main from tapping point up to the treatment plant.
  • Widened existing road and illuminated road and jetty while rehabilitating existing drainage systems.
  • Defined key responsibilities to facilitate project success.
  • Designated as a Construction Manager to looking after the client billing of the site. Calculating concrete, reinforcement, shuttering, excavation, cutting etc
  • Quantities from drawing for preparation of bill.
  • Coordinate with client KEIIP and consultant DSC for smooth running of the project.
  • Coordinated with Project Stores Department for internal audits and quarterly reconciliation of engineering materials, including reinforcement steel and structural materials.
  • Executed site setup and led soil investigation and topographical survey work.

Asst Manager

Kolkata Metro
2013.10 - 2017.03
  • Coordinated daily tasks to support station manager in project execution.
  • Facilitated effective programming to achieve on-time and safe work delivery.
  • Executed detailed reconciliation of structural and reinforcement activities to uphold project integrity.
  • Maintained strong relationships with client and consultant to ensure smooth site operations.
  • Making & getting approval of BBS from consultant.
  • Constructing roof slab, concourse slab & base slab by top down method.
  • Constructing Diaphragm wall of 40.0mx1.0mx3.5 mtr 200 nos.
  • Constructing 40.0mtrx1.0mtr dia pile 100 nos.
  • Project: Construction of Under Ground Metro Project from Subhash Sarobar to Central.
  • Description: This prestigious project comes under Kolkata Metro. The project cost was 1600.00 Crores.
  • Role & Responsibilities

Asst Manager

GardenReach Shipbuilders Engineer
2011.07 - 2013.09
  • Project: Modernization of GardenReach Shipbuilders Engineer- DRY Dock & Inclined Berth Shipyard for Indian Navy at GRSE – Main Unit- Kolkata
  • Description: This prestigious project comes under modernization of Shipyard at GRSE. Main Unit. Value of the project 329.00 Cores. This project comprise of 3nos packages, i.e. Civil works (Package-1), Services works i.e. Electrical services (Package-3) & Piping works (Package-4).
  • Package -I Contain construction of Dry Dock, Inclined Berth, Shipbuilding Module Hall, 250TGoliath Crane Foundation, Module Area Central Pier for Supporting to Parallel operation of both Dock & Berth, Shipping Structure Modernized Paint Cell, 6Kv Sub-Station Building for catering Power to Ship building & repairing with Ship to Shore Power distribution. The Projects include constructing the Coffer Dam & Sheet pile Protection during construction of Dock & Berth to protect the Hooghly River Tidal effect during Construction Activity. After construction Both Dock & Berth Tidal shall Protect Tidal Difference with a Steel Fabricated Gate of 220T each.
  • Defined responsibilities to achieve project objectives.
  • Acted as assistant manager, managing the construction of 2 jetties, 3 dolphins, 16,000 cum of dredging work, and 12,000 sqm of gabion stone pitching.
  • Calculating concrete, reinforcement, shuttering, excavation, cutting, Dredging etc. quantities from drawing for preparation of bill. Capable of checking the bill along With supervision consultant M/s Ramboll (Earlier Gifford), UK and also Along with client GRSE.
  • Developed a programme to ensure timely and safe completion of work.
  • Making & getting approval of BBS from consultant.
  • Fostered a good relationship with the client and consultant to ensure smooth site management.
  • Making reconciliation of structural & reinforcement work.
  • Capable of making extra claim for supplementary items.
  • Capable of running a site independently at Defect Liability Period.

Senior Engineer

Indian Navy
2008.09 - 2011.06
  • Developed construction plan for wet basin, ensuring alignment with project specifications and timelines.
  • Created method statement for project execution, detailing procedures and safety measures.
  • Constructing of 14.0m width & 200 x4 mtr x15.0 mtr depth mass concrete wall over Arabian Sea
  • Executed piling work, completed gantry fabrication of portal frame, and ensured smooth monitoring of project progress.
  • Making BBS & getting approval from consultant ROYAL HASKONNING.
  • Prepared RA bill and final bill for subcontractors, ensuring compliance with contractual agreements.
  • Dismantling the gantry, 250-ton Goliath crane gate erection.
  • Project: Construction of Wet Basin & Mazgaon Modernization Project.
  • Description: This project comes under “Indian Navy” which is implemented by the Ministry of Defence. Construction of mass concrete wall called WET BASIN of average width 14.0 m x200 m long wall & average depth 15.0 m for Scorpion Sub marine & the project cost was 365.0 CRORE. 1st time in India that project & it is 2nd in Asia.
  • Role & Responsibilities

Site Engineer

NHAI
2006.08 - 2008.08
  • Executed and planned site works, preparing monthly progress programme to track project milestones.
  • Coordinated with project manager, clients, and consultants to ensure smooth progress and timely resolution of issues.
  • Defined roles and responsibilities within project, ensuring clarity and accountability among team members.
  • Construction of Sindh Bridge ( 3.5 KM bothway) for which casting & erection of RCC precast prestressed ‘I’ Girder 30 mtr span of 288 Nos
  • Constructing of all substructures to super structures.
  • Capable of making monthly progress report, weekly progress report, Daily progress report for the Project manager & related consultant overseas & inland.
  • Project: : Widening to 4 Lanes and Rehabilitation of Existing 2 Lane Carriage Way of Jhansi – Shivpuri section of NH – 25 including construction of 6 KM (both way) Sindh Bridge & Ghat section.
  • Description: This project under the NHAI.This road connected from Jhansi to Shibpuri.Total 100 km. The cost of the project is US $ -1800.00 M

Site Engineer

Golden Quadrilateral Scheme
2002.08 - 2006.08
  • Project: Widening to 4 Lanes and Rehabilitation of Existing 2 Lane Carriage Way of Vaniyambadi – Pallikonda section of NH - 46, KR – Package- Chennai. (Package-4, KR-2)
  • Description: This project comes under “Golden Quadrilateral Scheme” which is implemented by the Ministry of Road Transport & Highways, funded by World Bank. Through this “Golden Quadrilateral” Project, the Major cities in India i.e., Delhi - Mumbai - Chennai - Kolkata - Delhi can be connected with each other in a random roadway. For this purpose, total 5846 km length of National Highways are to be built up with in 2004. The cost of this Project is US $ -1837.20 M.
  • Outlined role and responsibilities for the project, detailing specific duties and expectations.
  • Worked as a Site Engineer, constructing of 2 nos Grade separator of span 45x200 mtrs.of cast in situ prestressed post tensioning Box Girder
  • Checked survey data and PCC bottom level according to DPR and construction drawings for cross drainage structures, including slab culverts, pipe culverts, box underpasses, minor bridges, and crash barriers
  • Prepared BBS for various structures and coordinated with supervision consultants (M/S RITES) for approval and verification of structures
  • Checked shuttering and staging in compliance with design and details of temporary structures
  • Calculated the work quantity using field surveys and approved construction drawings.
  • Generated RA and final bills for subcontractors to facilitate timely payments and project financial tracking.
  • Collaborated with the project stores department for internal audits and quarterly reconciliations of engineering materials, including reinforcement steel, shuttering material, and Hume pipes.
  • Capable of making BOQ, Purchase Order for Subcontractors (as per the actual Rate Analysis for the particular item of work) and certifying monthly RA bill for subcontractors as per the Client Certification.

Education

B Tech - CIVIL Engineering

MAKAUT
Kolkata
2021.06 - 2024.06

Diploma - Civil engineering

Jnan Chandra Ghosh Polytechnic
Kolkata
1999.06 - 2002.06

Higher Secondary - Pure Science

Liliah TRGR Khemka High School
Kolkata
1995.04 - 1997.03

Secondary Examination -

Bhattanagar Kulakamini Vidyamandir
Kolkata
1989.04 - 1995.06

Skills

  • Excellent Mathematical Skills 5/5
  • AutoCAD 5/5
  • Project Management 5/5
  • MS Excel, MS word etc
  • Expertise in auto cad
  • HSE regulations compliance
  • Project lifecycle awareness
  • Understanding of lean principles

Certification

  • Certificate of Appreciation from ADNOC
  • Appreciation certificate from HSE for safe establishment, dedication & commitment in maintaining the Project HSE standards.
  • WMS etc.
  • APLO for Offshore & Onshore crane.

Languages

English, Very good command
Hindi Very good command
Bengali Very good command
Tamil Working knowledge

Hobbies

Playing Cricket, Chess etc

Trainings

APLO (Appoint person lifting operation), H2S, TBOSIET, ADNOC HSE, WMS, Advanced Fire fighting & advanced first Aid training.

current CTC

48 Lacs.

Expected salary

As per company standard.

Employment History

  • 03/2023 to present NMDC (National Marine Dredging Company, UAE).
  • 08/2002 to 02/2023 ITD Cementation India LTD.

Affiliations

  • Playing cricket ,studying books

Timeline

Project Engineer

NATIONAL MARINE DREDGING COMPANY
2025.03 - 2026.06

Project Engineer

NATIONAL MARINE DREDGING COMPANY
2024.03 - 2025.02

Project Engineer

NATIONAL MARINE DREDGING COMPANY
2023.03 - 2024.02

B Tech - CIVIL Engineering

MAKAUT
2021.06 - 2024.06

Construction Manager

Bangalore Metro Rail Corporation LTD.
2020.10 - 2023.02

Construction Manager

Kolkata Environmental Improvement Project, Kolkata Municipal Corporation
2017.04 - 2020.09

Asst Manager

Kolkata Metro
2013.10 - 2017.03

Asst Manager

GardenReach Shipbuilders Engineer
2011.07 - 2013.09

Senior Engineer

Indian Navy
2008.09 - 2011.06

Site Engineer

NHAI
2006.08 - 2008.08

Site Engineer

Golden Quadrilateral Scheme
2002.08 - 2006.08

Diploma - Civil engineering

Jnan Chandra Ghosh Polytechnic
1999.06 - 2002.06

Higher Secondary - Pure Science

Liliah TRGR Khemka High School
1995.04 - 1997.03

Secondary Examination -

Bhattanagar Kulakamini Vidyamandir
1989.04 - 1995.06
CHIRADIP CHAKRABORTY