Summary
Overview
Work history
Education
Skills
Certification
Affiliations
Additional Information
Languages
Timeline
Volunteer
Feras  Abu Zraiq

Feras Abu Zraiq

DAMMAM,Saudi Arabia

Summary

Well-qualified production management professional knowledgeable about allocating resources, optimizing production and increasing output with a hands-on and dedicated approach. Articulate and professional problem-solver with good relationship-building abilities. Proficient in planning and implementing operation and quality strategies and requirement's.

Overview

24
24
years of professional experience
1
1
Certification

Work history

Production Manger/ Operation Excellence

Baxter Company limited
Dammam, Saudi Arabia
2014.01 - Current
  • Directed manufacturing process and operational efficiency procedures to achieve goal of first run capability
  • Monitored and supported progress of plant production orders by managing shop capacity and loading functions
  • Supervised terminal sterilization processes and machinery to prevent overloads and avoid malfunctions
  • Implemented VSM (Value stream mapping) and TLA (Total Lose Analysis) programs changes to identify and quickly resolve root cause issues bottlenecking production levels.
  • Implemented Visual Management, retooling production status sheets and driving daily and planned tasks to achieve scheduling effectiveness.
  • Implemented quality improvement changes to minimize product defect rates.
  • Planned, organized and managed operations, including ordering materials and supplies, workflow management and timely production.
  • Defined manufacturing performance standards and reviewed outcome of performance goals to set future targets.
  • Completed and recorded all recycling and rework documentation with high degree of accuracy.
  • Support operation setup and operation of production equipment resulting in efficient runs.
  • Successfully managed production activities to achieve scheduled production plan.
  • Led quality control initiatives to reduce downtime and boost profits
  • Identified and planned for resources needed to accomplish production objectives
  • Managed product quality to guarantee compliance with quality policies, procedures and systems
  • Met aggressive production and safety goals while minimizing equipment downtime
  • Reviewed work for quality and compliance with company standards and design specifications
  • Procured required manufacturing equipment and parts (Budgeting)
  • Directed improvements in safety, product quality, service and cost efficiency
  • Standardized production procedures, job roles and quality assurance guidelines
  • Managed continuous improvement initiatives to drive gains in quality, flow and output
  • Planned, directed, coordinated and assigned manpower to meet aggressive production schedules
  • Established position requirements, schedules and production team processes
  • Applied lean practices to balance workflow and eliminate unnecessary steps
  • Drove daily production activities with effective communication and leadership
  • Implemented performance, quality and efficiency measures to achieve aggressive production goals
  • Translated senior management directives into actionable front-line policies and implemented changes with staff.
  • Handled negotiations with outside vendors and service agencies to meet group needs.
  • Organised financial and operational data to help with yearly budgeting and planning.
  • Established clear budgets and cost controls strategies to meet objectives.
  • Monitored health and safety measures for guaranteed compliance.

Quality, Validation and Calibration Engineer

Baxter Company Limited
Dammam, Saudi Arabia
2009.09 - 2014.01
  • Ability to work through quality systems meets the international standards requirements (cGMP, GEP, ISO9001 and ISO 14001)
  • Drives identification of the root cause of quality issues and execution of product quality improvements through preventive or corrective actions
  • Interfaces with manufacturing process for quality-related tasks, audits and incidents.
  • Performs risk analysis to support new product development, customer issue resolution and manufacturing effectiveness improvements, provides an expert voice in new product development teams.
  • Coordinated and supported audit and on-site inspections, liaising with regulatory agencies for smooth execution.
  • Overviews and performs quality audit activities, provides expert knowledge with quality tools and methods and helps to ensure quality of manufactured products
  • Responsible for calibration program and call up systems and continues improvement for calibrated measuring devices in pharmaceutical production plant
  • Responsible to perform and coordinate for the new validation, re-validation and maintenance plans for pharmaceutical plant equipment's, utilities and processes e.g. (HVAC, stability chambers, Sterilizers, ....etc.)
  • Control the calibration activities for Validation, Sterilizers and cycle's qualifications
  • Thermal mapping qualifications (Warehouses, Autoclaves, Product/ Cycle configuration).
  • Oversaw installation, testing and commissioning of engineering systems to meet performance and safety requirements.
  • Life cycles development and validation implementation for computerized systems
  • Internal Audit programs planning and implementation (Audit team leader).
  • Proposed engineering solutions to address project challenges and foster on-time completion.
  • Devised and implemented test procedures to verify product compliance and performance.
  • Documented technical specifications and requirements in alignment with company-established protocols.

Validation, QA and Calibration Supervisor

The Arab Company for Pharmaceutical Products
Makkah, Saudi Arabia
2008.09 - 2009.08
  • Validation and Calibration Supervisor and validation team leader
  • Responsible for validation and qualification planning and implementation in aseptic sterilization plant
  • Same job description as Validation Supervisor in Mobedco Company Below.

Projects Manager

Advanced Central Gas Company
Amman, Jordan
2006.12 - 2008.09
  • Liquefied petroleum gas (LPG) Projects design according to NFPA 58, 54
  • Projects coordination and implementation (day to day activities)
  • Testing and final inspection
  • Final commission and after sales activities
  • Technical support for the sales process.

Validation Engineer, Calibration Supervisor & Project Manager

Arab Veterinary and pesticides manufacturing Co.
Irbid, Jordan
2004.08 - 2006.12
  • Validation/ Qualification processes (URS, DS, FAT, SAT, IQ, OQ, PQ)
  • Water treatment systems processes (RO and Distillation units) (operating and maintenance)
  • Thermal validation for Autoclave, DHS (Dry heat sterilizer), Tunnel sterilizer and Heating and cooling chamber instruments.
  • Sterile areas supervision.
  • Cleaning validation: Cleaning Validation team leader for sterile and non-sterile plants.
  • Calibration department lead, all measuring devices under NIST and ISO17025
  • Follow-up for external inspections by European authorities.
  • Assessed damage to advanced equipment, taking action to prevent reoccurrence.
  • Advised stakeholders on engineering procedures involved with sterile areas.
  • Worked with production teams to facilitate smooth transition from design and testing to full-scale manufacturing.
  • Performed thorough quality and safety checks, ensuring all specifications were strictly adhered to.
  • Built and nurtured professional relationships with wide range of stakeholders.
  • Identified and managed budget, timescale and scope changes, recommending actions and improvements to meet project goals.
  • Coordinated project resources, goals and activities, facilitating successful closure and handover.
  • Executed quality assurance activities, checking project results against client requirements.

IPC Supervisor

The United Pharmaceutical Manufacturing Co
Amman, Jordan
2000.08 - 2004.08
  • Ability to establish In Process Control (IPC) system for different production departments.
  • SOP, Forms and quality documents writing and approval for IPC system
  • (cGMP's) implementation.
  • Dispensing, Granulation, Compression, Filling Processes, Coating, Blistering and packaging:
  • Area/ line clearance process design and implementation.
  • Internal auditing for different production activities
  • Cleaning Validation.
  • Maintained spotless and tidy working areas to create risk-free and productive environments.
  • Managed staff rotas, planning workloads effectively and strategically.
  • Performed thorough quality and safety checks, ensuring all specifications were strictly adhered to.
  • Maintained documents and records to comply with internal policies and external regulations.

Education

B. Sc - Chemical Engineering

Jordan University of Science & Technology Irbid
2000

Skills

  • Technical writing
  • Problem Solving
  • Leadership abilities
  • EMS (Enterprise Management)
  • Lean manufacturing
  • 6 S
  • VSM (Value Stream Mapping)
  • Kaizen
  • Operations management
  • Effective Staff Coach
  • Strategic Planning
  • Quality Improvement Competency
  • Savvy Negotiator
  • Knowledge of engineering
  • Budgeting Proficiency
  • Strong Presentation
  • ACCOMPLISHIMENT
  • Green Belt training and lead investigation certified by Baxter
  • 6S saving projects and lean manufacturing process accomplishment
  • Reducing stock levels without the risk of shortages or outages
  • Productivity improvement 20% increase
  • Kaizen, yoke poke
  • OTHER SKILLS
  • Valid Jordanian and Saudi Driving Licenses
  • Able to use various PC applications

Certification

2004, Internal Auditor Training Course, from SGS.

Affiliations

Jordanian Engineers Association. Professional Engineer in Saudi Council of Engineer's membership.

Additional Information

  • 11th,1976

Languages

Arabic
Native
English
Advanced

Timeline

Production Manger/ Operation Excellence

Baxter Company limited
2014.01 - Current

Quality, Validation and Calibration Engineer

Baxter Company Limited
2009.09 - 2014.01

Validation, QA and Calibration Supervisor

The Arab Company for Pharmaceutical Products
2008.09 - 2009.08

Projects Manager

Advanced Central Gas Company
2006.12 - 2008.09

Validation Engineer, Calibration Supervisor & Project Manager

Arab Veterinary and pesticides manufacturing Co.
2004.08 - 2006.12

IPC Supervisor

The United Pharmaceutical Manufacturing Co
2000.08 - 2004.08

B. Sc - Chemical Engineering

Jordan University of Science & Technology Irbid
Feras Abu Zraiq