Summary
Overview
Work History
Education
Skills
Languages
Accomplishments
Timeline
Generic

Haris Nazir Malik

Dubai

Summary

RTA Approved Engineer with 12 years of experience in infrastructure, utilities and Developer projects. Expertise in technical submittals, presenting information and performing field inspection. Committed to working closely with all levels of management, field operating staff and engineers. Outstanding team player with enthusiastic attitude.

Overview

12
12
years of professional experience

Work History

Resident Engineer

Right of way road & traffic engineering services
Dubai
04.2017 - Current
  • Oversight of inspectors' daily activities, including work assignments and on-site performance. Review of Inspectors Daily Reports.
  • Review and approval/comment of Contractor's Shop Drawings.
  • Reviewing and providing approvals/comments on Contractor's technical submittals (Method Statement, Material, shop drawings, etc.).
  • Coordinating with Contractor's supervisory personnel regarding schedule, sequence, and work methods.
  • Reviewing as-built drawings in coordination with inspectors and surveyors.
  • Witnessing laboratory tests and verifying test results.
  • Organize & conduct technical discussion /coordination/pre-construction/Kick-off meeting with Authorities (RTA, DEWA, DUSUP).
  • Reporting observed non-conformances by the Contractor and ensure contractor adheres to approved construction drawings as well as the inspection & testing plan.
  • identify and report changes to project scope.
  • assist with the preparation of proposals, estimates, budgets and schedules;

Site Manager

HRCC Pvt Ltd
Srinagar
04.2016 - 02.2017
  • Managed daily operations of the site, including staff and contractors.
  • Ensured compliance with safety protocols, regulations and standards.
  • Collaborating with managers, stakeholders, and technical experts to define projects extend of damage and planning further actions required.
  • Managing & lead the team of engineers, supervisors and sub-contractor on up-gradation, re-works as well as laying of new lines.
  • Scheduling the material supply, arranging machinery and deploying workers strategically.
  • Maintain records of work done while segregating it on basis of rectification, betterment and additional work.

Project Engineer

Topline buildtech Pvt Ltd
Noida
06.2013 - 03.2016
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Assigned tasks to personnel based on their skill sets and monitored progress to ensure timely completion.
  • Resolved conflicts between vendors, contractors, internal staff or other stakeholders related to project objectives.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Compiled reports detailing progress updates, budget information and other relevant data related to the assigned project.

Site Engineer

Hindustan construction company Pvt Ltd
Qazigund
06.2012 - 05.2013
  • Supervised and coordinated all activities related to tunnel construction, including drilling, excavation, and support installation.
  • Lead and supervised site staff,subcontractors, and laborers, ensuring their work aligns with project goals and standards.
  • Ensured the work is executed accordance to the tunnel designs, drawings, and specifications during construction.
  • Address any issues related to quality and work with the team to resolve them promptly.
  • Maintain accurate and up-to-date records of site activities, including progress reports, daily logs, and relevant documentation.
  • Prepared regular reports on project status, highlighting key achievements, challenges, and potential risks.
  • Communicate project updates to the Project Manager and other stakeholders Regularly.

Education

Bachelor of Technology - Civil Engineering

Dr.A.P.J Abdul KalamTechnical University (Formerly
India
06-2012

Skills

  • Construction site management
  • Project Coordination
  • Project Communication
  • Technical reviews
  • Technical reports
  • Team Leadership
  • Work Planning
  • Project Scheduling
  • Inspection Processes
  • Utilities work
  • Infrastructure work
  • Earth works/Excavation

Languages

Hindi
First Language
English
Proficient (C2)
C2
Urdu
Proficient (C2)
C2

Accomplishments

• Supply, installation, testing & commissioning of 132kv cable shifting works for RACECORS 400/132kv substation and associated works.

• Supply, installation, testing & commissioning of 132kv cable works for AMARDI 132/11kv substation and associated works.

• ETC cable Crossing on Dubai roads ETC- TECOM A Barsha Heights.

• Du Connectivity to DXB1652 DSO.

• Construction of irrigation pumping station and infrastructure works at Al Furjan Phase-02

Timeline

Resident Engineer

Right of way road & traffic engineering services
04.2017 - Current

Site Manager

HRCC Pvt Ltd
04.2016 - 02.2017

Project Engineer

Topline buildtech Pvt Ltd
06.2013 - 03.2016

Site Engineer

Hindustan construction company Pvt Ltd
06.2012 - 05.2013

Bachelor of Technology - Civil Engineering

Dr.A.P.J Abdul KalamTechnical University (Formerly
Haris Nazir Malik