Summary
Overview
Work history
Education
Skills
Languages
Training cources
Timeline
Generic
IBRAHIM KHALIL

IBRAHIM KHALIL

Abu Dhabi,U.A.E

Summary

Experienced E&I team leader specializing in large-scale EPC construction projects in the Oil & Gas industry across Egypt and Gulf regions. Proven track record of improving project outcomes through strategic team leadership and effective stakeholder engagement. Expertise in quality assurance, maintaining compliance with ISO standards and project specifications, ensuring timely and budget-conscious project delivery. Skilled in instrumentation and electrical systems, with a focus on control systems installation and comprehensive project documentation management.

Overview

20
20
years of professional experience
5
5
years of post-secondary education

Work history

Electrical & Instrument construction Superintendent

ADNOC GAS
HABSHAN, ABU DHABI, UAE
01.2025 - 07.2025
  • Successfully managed construction of four gas pipelines, spanning 35 km, for MERAM PKG-1.
  • Led installation of electrical and instrumentation systems in valve rooms and launchers.
  • Coordinated laying of fibre optic cables alongside pipelines to enhance connectivity.
  • Developed and implemented construction risk assessments and job safety analyses.
  • Monitored project progress against timelines to ensure on-time delivery.
  • Secured necessary permits and licences by liaising with local authorities.
  • Facilitated daily meetings with supervisors to optimize operational workflows.
  • Provided mentorship, support and team management to keep staff suitably trained and competent.
  • Supported cost-effective working methods to reduce project outgoings and maximise potential profits.
  • Delivered comprehensive reports outlining project status for stakeholder awareness.

Electrical & Instrument construction Superintendent

ASOREC CO.
ASUIT, EGYPT
09.2023 - 01.2025
  • EPC,Construction of SALLAM INTAKE project from Nile River with six main pumps and 15 km water pipeline with 900 mm diameter with 2 fiber optic cables along the pipeline and all electrical and instrumentation work.
    my duties:
    Develop and implement construction risk assessments, job safety analysis and safe methods of working.
  • Assist in major incident investigation and reporting. Assist in the maintenance and audit of the certification process. Assist the commercial and planning departments with E&I quotations and appraisals.
    Coordinate electrical and instrumentation works & interface with the other construction disciplines. Daily meeting with Electrical Supervisors to discuss any issues on daily work fronts and coordinate work areas.
  • Monitor work schedules and advise of potential delays.
  • Conducted regular site inspections, maintaining high-quality standards.
  • Supervised site teams for maximum productivity.

Electrical & Instrument construction Superintendent

ANOPEC CO.
ASUIT, EGYPT
01.2023 - 08.2023
  • Coordinate electrical and instrumentation works & interface with the other construction disciplines. Daily meeting with Electrical Supervisors to discuss any issues on daily work fronts and coordinate work areas.
  • Monitor work schedules and advise of potential delays.
  • Develop and implement construction risk assessments, job safety analysis and safe methods of working.
  • Assist in major incident investigation and reporting. Assist in the maintenance and audit of the certification process. Assist the commercial and planning departments with E&I quotations and appraisals.

Electrical & Instrument construction Superintendent

PETROJET
ASUIT, EGYPT
02.2021 - 12.2022
  • Construction of The Petrojet employee camp has a capacity of 7,000 workers, including a kitchen, a food hall, residential rooms, a service area, a mosque, a clinic, an administrative building, and warehouses. It has communications systems, networks, a fire alarm system, an audio system, and installation work for electrical power panels, transformers, low- and medium-voltage panels, and generators.
  • My duties: Coordinate electrical and instrumentation works & interface with the other construction disciplines.
  • Daily meeting with Electrical Supervisors to discuss any issues on daily work fronts and coordinate work areas. Monitor work schedules and advise of potential delays.
  • Develop and implement construction risk assessments, job safety analysis and safe methods of working.
  • Assist in major incident investigation and reporting. Assist in the maintenance and audit of the certification process. Assist the commercial and planning departments with E&I quotations and appraisals.

Electrical & Instrument construction Superintendent

SAIPEM In AD DUQM OMAN
DUQM, OMAN
01.2020 - 01.2021
  • Construction of RAS MARKZ TO DUQM REFINERY pipeline 85 km,28" diameter with SAIPEM company as a client including 2 valve rooms, launcher and receiver with all electrical and instrumentation and cathodic protection work.
  • My duties: Develop and implement construction risk assessments, job safety analysis and safe methods of working. Assist in major incident investigation and reporting.
  • Assist in the maintenance and audit of the certification process. Assist the commercial and planning departments with E&I quotations and appraisals.
  • Coordinate electrical and instrumentation works & interface with the other construction disciplines. Daily meeting with Electrical Supervisors to discuss any issues on daily work fronts and coordinate work areas. Monitor work schedules and advise of potential delays.
  • Collaborated effectively with subcontractors, ensuring quality workmanship.

Electrical & Instrument construction Superintendent

OGC OMAN GAS CO.
DUQM, OMAN
08.2018 - 12.2019
  • EPC, Construction of DUQM PL 220 KM length, 36 " diameter with 7 valve rooms, launcher and receiver and execution of cathodic protection system, fiber optic cable system, RTU panels, solar array system, battery and UPS system and all electrical and instrumentation work.
  • My duties: Responsible for the electrical project management and supervisory assignment in scheduling, project acceptance planning, budgeting, procurement and feasibility both studies.
  • assist in Preparing and review the detailed E&I design deliverables e.g., circuit and schematic diagrams, control panel layouts, MCC layouts, cable routes etc.
  • Supervising the E&I project installation phase. Assisting with plant commissioning and validation.
  • Monitored progress against timelines to ensure punctual project delivery.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Reported on progress, problems and information requirements.
  • Delivered short-term plans and performance requirements, holding weekly progress meetings.
  • Delegated tasks efficiently amongst team members for optimal workforce utilisation.

Electrical & Instrument construction Superintendent

OGC OMAN GAS CO.
NIMR-MARMOUL, OMAN
10.2016 - 07.2018
  • EPC, Construction of SALALAH Gas pipeline 85 km, 32" diameter for OMAN GAS company OGS construction of pipeline including 3 valve room, launcher and receiver. including the cathodic protection system for the pipeline , optical fiber cable along the pipeline and all the electrical and instrumentation work.
  • My duties: Managing workflow.
  • Training new hires.
  • Creating and managing team schedules. Reporting to HR and senior management.
  • Evaluating performance and providing feedback.
  • Identifying and applying career advancement opportunities.
  • Helping to resolve employee issues and disputes.
  • Coordinated with suppliers to ensure prompt delivery of materials.
  • Promoted best practice in health, safety and environmental matters in conjunction with SHEQ department.
  • Conducted routine quality audits, verifying progression against specifications and initiating corrective actions to remedy concerns.
  • Performed detailed safety briefings and new team member inductions, reducing onsite risks.

Electrical & Instrument construction Manager

PETROSHAHD CO.
WEST DESERT, EGYPT
01.2016 - 10.2016
  • CONSTRUCTION OF P\L 20” ,87 KM WITH 4 VALVE ROOMS AND 3 OIL FACILITY STATIONS EPC, installation of cathodic protection system, all electrical and instrumentation work for 4 valve rooms along the pipe line and 2 pump stations at launcher and receiver.
  • Coordinated construction projects from planning stage to completion.
  • Implemented innovative solutions for overcoming project obstacles efficiently.
  • Oversaw subcontractors, ensuring work met project specifications.
  • Supervised workforce maintaining high levels of productivity on-site.
  • Mitigated potential risks by conducting thorough risk assessments.

Senior Electrical & Instrument construction engineer

PETROGAS CO.
SOHAG, EGYPT
01.2015 - 12.2015
  • CONSTRUCTION OF NO.4 SPHERICAL STORAGE TANKS, FIRE PUMP HOUSE, GAS PUMP HOUSE AND ADMINISTRATION BUILDING EPC, construction of 4 spherical tanks for PETROGAS COMANY. execution of all electrical and instrumentation work for the 4 spherical tanks
  • Ensured adherence to design specifications during all stages of construction.
  • Assisted in the procurement process, ensured timely availability of materials on site.
  • Worked closely with subcontractors to ensure alignment with primary objectives and timelines.
  • Facilitated regular meetings for better communication amongst team members.
  • Delivered construction outcomes through targeted structural stability assessments.
  • Resolved project challenges through in-depth analysis and stakeholder consultation.

Senior Electrical & Instrument construction engineer

GASCO Gas natural co.
EL SADAT, EGYPT
06.2014 - 12.2014
  • EPC, Construction of EL SADAT- EL NOBARIA gas pipeline 36 km , 32 " for GASCO company. including execution of cathodic protection system, fiber optical cable along the pipeline and all the electrical and instrumentation work for 4 valve rooms along the pipeline.
  • Streamlined workflow for improved productivity by implementing advanced engineering techniques.
  • Guided junior engineers, helped them develop their technical skills and understanding of industry practices.

Senior Electrical & Instrument construction engineer

QP QATAR PETROLUM CO
MASAIED, QATAR
06.2013 - 06.2014
  • EPC, Construction of JET A1 pipeline 16", 16 km from MASAEED REFINERY to HAMAD international airport for QATAR PETROLEUM COMPANY " QP “.
  • including the cathodic protection system
  • and installation of pump house inside MASAEED REFINERY including all electrical and instrumentation work and including shutdown work in electrical and instrument control rooms.
  • Enhanced project efficiency by overseeing construction processes.
  • Achieved deadlines with diligent management of construction schedules.
  • Conducted safety audits for maintaining a hazard-free work environment.
  • Worked closely with subcontractors to ensure alignment with primary objectives and timelines.

Electrical & Instrument construction engineer

QARUN Qarun Petroleum CO.
EL WAHAT-WEST DESERT, EGYPT
01.2010 - 05.2013
  • EPC, Construction of third train at QARUN CPF installation of one heater and on desalter with all instrumentation equipment and connection to existing control room and do the pre-commissioning and commissioning for the new train.
  • Construction cathodic protection system and instrumentation work of 2 storage water flood tanks 5000 BBLS (EAST BAHARIA) EPC
  • Construction cathodic protection system and instrumentation of valve rooms of oil pipeline 10".40 km (TRUNK LINE) EPC
  • Construction cathodic protection system and instrumentation work of 12 storage water flood tanks 5000 BBLS, EPC
  • Construction cathodic protection system and instrumentation work of 2 storage water flood tanks 5000 BBLS (HEBA RIDGE AREA), EPC
  • Construction of laying & jointing and termination of 2 Medium Voltage cables 3
  • 300 mm2 AL cables, EPC
  • Construction cathodic protection system and instrumentation of valve rooms of oil pipeline 8", 12 km (AQSA TRUNK LINE), EPC
  • Construction of NEAG – 1 oil facilities station (pump shed, heater, desalter, separator, control room and switch gear), EPC

Electrical & Instrument construction engineer

GASCO Gas natural co.
ASWAN, EGYPT
10.2009 - 12.2009
  • EPC, construction cathodic protection system alongside fiber cable and instrumentation of valve rooms for Kima-Aswan 24" gas pipeline 24 km
  • Worked closely with subcontractors to ensure alignment with primary objectives and timelines.
  • Managed resources, ensured optimal utilisation in all projects.

Electrical & Instrument construction engineer

GASCO Gas Natural co.
LUXOR, EGYPT
01.2009 - 10.2009
  • Constructed 400 km UPPER EGYPT gas pipeline for GASCO, ensuring safe operations.
    Executed installation of cathodic protection systems and fibre optic cabling along pipeline.
    Managed electrical and instrumentation installations for 14 valve rooms along pipeline.
  • Achieved deadlines with diligent management of construction schedules.
  • Streamlined workflow for improved productivity by implementing advanced engineering techniques.

Electrical & Instrument construction engineer

EHCSS Egyptian Holding Company for Silos
EL MINYA, EGYPT
01.2008 - 12.2008
  • EPC, construction of ELMINYA silo complex for EGYPTIHAN SILO HOLDING COMPANY. Execution of all electrical and instrumentation work for 20 silos including admin building, mosque, store building, electronic scale, fire pump room, electrical rooms and control room.
  • Supervised implementation of work packages, from approval to package closeout and post-maintenance testing.
  • Monitored workmanship of subcontractors to ensure compliance with specifications and procedures.

Electrical & Instrument construction engineer

British Gas Co.
EL MAADI, EGYPT
08.2007 - 12.2007
  • Managed administration buildings modernization for BRITISH GAS COMPANY at primary office in EGYPT.
  • Enhanced project efficiency by overseeing construction processes.

Electrical & Instrument construction engineer

PETROJET Company
Beni swif, Egypt
01.2006 - 07.2007
  • EPC, Execution of all electrical and instrumentation work for 12 silos including admin building, mosque, store building, electronic scale, fire pump room, electrical rooms and control room.
  • CLIENT: EHCSS Egyptian Holding Company for Silos
  • Worked closely with subcontractors to ensure alignment with primary objectives and timelines.
  • Ensured adherence to design specifications during all stages of construction.
  • Streamlined workflow for improved productivity by implementing advanced engineering techniques.

Education

Bachelor of Engineering - Electronics& electrical communication Eng.

FACULTY OF ELECTRONIC ENG.-MENOFIA UNIVERSITY
EGYPT
09.1999 - 05.2004

Skills

  • Knowledge of instrumentation standards
  • Distributed control systems familiarity
  • Resilient under pressure
  • Hazardous area equipment knowledge
  • Safety protocols knowledge
  • Adaptable communication style
  • Reliable decision making
  • Efficient organising
  • Field instrumentation
  • High-Level collaboration
  • Field instrumentation expertise
  • Quality assurance focus
  • Continuous learning
  • Sensor technology understanding
  • Process-Driven workflow
  • Time management mastery
  • System integration expertise
  • Documentation creation and management
  • High-value project management
  • Technical leadership
  • Budget control
  • Complex problem-solving
  • Industry standards and regulations
  • Technical drawing
  • Voltage electrical equipment
  • Client relationship building
  • Compliance understanding
  • Superior communication
  • Project Management
  • Creative problem solving
  • Organizational leadership
  • Safety processes
  • Schematic diagrams interpretation
  • Budget monitoring
  • Multidisciplinary collaboration
  • Safety and compliance
  • Cross functional teamwork
  • Electrical systems

Languages

English
Advanced
Arabic
Native

Training cources


- Safety   Course PETROJET (from 24/7 to 26/7/2007)

- Initial   configuration of the new recruits EXPERT Center (from 2/12 to 6/12/2007)

- Safety   Course PETROJET (from 23/2 to 25/2/2008)

- Development   of management skills for Engineers MMC (from 29/6 to 3/7/2008)

- Safety   Course PETROJET (from 27/1 to 29/1/2009)

- Electrical   installation in hazardous area OGS&NAIT (from 6/6 to 10/6/2010)

- Operational   planning OGS (from 25/4 to 28/4/2021)

- Testing   and operation of electrical dist. panels OGS (from 27/6 to 30/6/2021)

- Hazard   identification and Risk assessment OGS (from 11/7 to 15/7/2021)

- Incident   investigation and RCA and BBS OGS (from 22/8 to 26/8/2021)

- Pre-commissioning, commissioning and startup course BECHTEL (from 20/2/2022 to 28/4/2022)

- PMP   preparation course completion PM TRICKS CENTER (from 15/4/2024 to 28/5/2024)

- Pre-intermediate   1 level online English course Speak Up-Egypt Language School

- Pre-intermediate   2 level online English course Speak Up-Egypt Language School

- Intermediate   1 level online English course Speak Up-Egypt Language School

- Intermediate   2 level online English course Speak Up-Egypt Language School

- Creating   a meeting agenda LinkedIn, PMI

- Decision-Making   strategies LinkedIn, NASBA

- Electrical   system: panel boards, frequency drivers and transformers LinkedIn, PMI

- Electrical systems Reading drawing and schematics LinkedIn, PMI

- Emotional   intelligence for project managers LinkedIn, PMI

- Improving   your listening skills LinkedIn, PMI

- Input   sensors with PLC: 4:20 mA current loop LinkedIn Learning

- Input   sensors with PLC: sinking and sourcing LinkedIn Learning

- Introduction to PLC industrial automation LinkedIn Learning

- Leading   your team through change LinkedIn, PMI

- Learning   industrial automation LinkedIn Learning

- Learning   SCADA LinkedIn Learning

- PLC   industrial sensors LinkedIn Learning

- Problem   solving techniques LinkedIn, PMI

- Project   Leadership LinkedIn, PMI

- Project   Management Foundation LinkedIn, PMI

- Project   Management skills for leaders LinkedIn, PMI

- Teamwork   Foundation LinkedIn, PMI

- What is A   business Analysis LinkedIn, IIBA

- Construction   Industry: Safety LinkedIn Learning

- Negotiations   Foundations LinkedIn, NASBA

- Strategic   Negotiation LinkedIn, NASBA

- How to Be   Both Assertive and Likable LinkedIn Learning

- Negotiating   with Agility LinkedIn Learning

- How to   Prepare for Your Negotiations LinkedIn Learning

- When   Negotiations about More than Money How to Negotiate Almost Anything LinkedIn Learning

- Construction   Management Managing Risk LinkedIn, PMI

- Project   Resource Management LinkedIn, NASBA

- Construction Management Planning and Scheduling LinkedIn, PMI

- Project   Management Foundations Budgets LinkedIn, PMI

- Project   Management Foundations Quality LinkedIn, PMI

- Quality   Management Foundations LinkedIn Learning

- Electrical   Systems Communications and Data LinkedIn, PMI

- Communication   Foundations 2018 LinkedIn, PMI

- Project   Management Foundations Procurement LinkedIn, NASBA

- Construction   Management Safety and Health LinkedIn Learning

- Mastering   Self-Motivation LinkedIn, PMI

- Essential   Lessons for First-time Managers LinkedIn, PMI

- Leading   Together Co-leading a Project Team or Organization LinkedIn, PMI

- Presenting   as a Team LinkedIn, PMI

- Construction   Change Orders LinkedIn Learning

- Construction Management Reading Drawings and Specifications LinkedIn, PMI

- HP-Open   View Network Manager 7.5 NTI institute (from 17/12 to 28/12/2006)

- CISCO   CCNA & CCNP Certifications NTI institute (from 14 / 5 to 29/ 6/2006)

- Advanced   Course in GSM JELECOM Panasonic (from 10 / 8 to 10/ 9/2003)

- Introduction course to advanced communication systems (PBX – GSM   – CCTV – ISDN – FAX -Fire Alarm – Computer Network) JELECOM   Panasonic (from 1 / 7 to 17/ 7/2003)

Timeline

Electrical & Instrument construction Superintendent

ADNOC GAS
01.2025 - 07.2025

Electrical & Instrument construction Superintendent

ASOREC CO.
09.2023 - 01.2025

Electrical & Instrument construction Superintendent

ANOPEC CO.
01.2023 - 08.2023

Electrical & Instrument construction Superintendent

PETROJET
02.2021 - 12.2022

Electrical & Instrument construction Superintendent

SAIPEM In AD DUQM OMAN
01.2020 - 01.2021

Electrical & Instrument construction Superintendent

OGC OMAN GAS CO.
08.2018 - 12.2019

Electrical & Instrument construction Superintendent

OGC OMAN GAS CO.
10.2016 - 07.2018

Electrical & Instrument construction Manager

PETROSHAHD CO.
01.2016 - 10.2016

Senior Electrical & Instrument construction engineer

PETROGAS CO.
01.2015 - 12.2015

Senior Electrical & Instrument construction engineer

GASCO Gas natural co.
06.2014 - 12.2014

Senior Electrical & Instrument construction engineer

QP QATAR PETROLUM CO
06.2013 - 06.2014

Electrical & Instrument construction engineer

QARUN Qarun Petroleum CO.
01.2010 - 05.2013

Electrical & Instrument construction engineer

GASCO Gas natural co.
10.2009 - 12.2009

Electrical & Instrument construction engineer

GASCO Gas Natural co.
01.2009 - 10.2009

Electrical & Instrument construction engineer

EHCSS Egyptian Holding Company for Silos
01.2008 - 12.2008

Electrical & Instrument construction engineer

British Gas Co.
08.2007 - 12.2007

Electrical & Instrument construction engineer

PETROJET Company
01.2006 - 07.2007

Bachelor of Engineering - Electronics& electrical communication Eng.

FACULTY OF ELECTRONIC ENG.-MENOFIA UNIVERSITY
09.1999 - 05.2004
IBRAHIM KHALIL