IBRAHIM HAMDY ALI  NABHAN

IBRAHIM HAMDY ALI NABHAN

Abu Dhabi,United Arab Emirates

Summary

I’m a Mechanical Supervisor, With More than 18 years of work experience at Refinery & power plants (Thermal power plants, Simple and Combined cycle Power Plant up to 4000 MW including Substations) &SWRO Desalination plants specializing in Operation, Maintenance and commissioning, Expertise in piping, and Mechanical Construction/Installation, Pre-commissioning, and Commissioning of Desalination Plants.
My working experience includes ( Saudi Arabia (250 MLD) & Salalah – Oman (100 MLD)& • 909 MLD Al Taweelah Seawater Desalination Plant, Abudhabi, UAE) at Different Positions during Construction, Pre-Commissioning, Commissioning, and Start-Up activities, Working on various Projects in different Countries (Egypt, Saudi Arabia, Libya, Salalah – Oman, Qatar & UAE), Multi-tasking Skills, Problem-Solving Skills, Computer Skills, Knowledge of discipline technical principles related to power plants. Knowledge of tools, equipment, and instruments used in the performance of job duties, Knowledge of internal engineering systems and tools. I have excellent knowledge and experience with (Toray, Fil (Toray, Filmtech, LG Chem RO membranes-SULZER-TORISHIMA- FLOWSERVE- Beaudrey, ECO MACCHINE-Energy Recovery- ASCO CARBON DIOXIDE Ltd- SIEMENS, FAI- GE- MITSUBISHI-HASLER-HITACHI-SHENGQI -GH-RTFREET-Al Mustaqbal Fibre Glass Industry-ARFLU-BELGICAST-COMEVALGardner Denver Iberica S.L-LOTUS-NOVA ROTORS-Pieralisi-SERA PRO DOS-TECEXSA-UNITED PIPING SOLUTIONS)
Machines, and equipment. Excellent Comprehension of Isometric, SLD/P&ID, LOTO, Planning, Management, Reporting & Interface Clearance. I speak English and Arabic. successful working with and managing people from many different cultures working in many different environments from Egypt, and GCC countries dealing with a variety of clients and consultants. EPC Experience.

Overview

19
19
years of professional experience
2
2
years of post-secondary education

Work history

Mechanical Supervisor & Commissioning,

Cox Energy- Coxabengoa Group
Taweelah -Abu Dhabi , United Arab Emirates
01.2020 - Current
  • Project: Taweelah 200 MIGD Independent water project.
  • Country: Taweelah -Abu Dhabi United Arab Emirates
  • Client: ACWA Power(Taweelah RO Desalination Company LLC)
  • Employer: ABENGOA
  • Scope: Installation of Mechanical Equipment’s (Static, Rotating) start-up & commissioning
  • Pre-commissioning and Commissioning
  • GRP Piping and inline elements,Super Duplex and Stainless-steel Piping and inline Elements,Pipe Racks and support structure,PE service and chemical lines with their inline elements
  • Procurement and onsite warehouse material Management for Piping,
  • Media Loading, Membrane loading
  • Underwater rehabilitation works on Intake well, Laid Pipelines
  • · Field Supervision for Commissioning and Plant operation activities
  • · Punch Points and observation closing , · Warranty Defect Closing
  • Managing overall responsibility for effectively coordinating of team
    contractors (supervision) and workforce & Follow- day-to-day work activities to reach the schedule targets of the sub-contractor )(SEPCOIII Construction Corporation Ltd.-Abu Dhabi Branch)
    (Installation, and Alignment all Mechanical Equipment and commissioning and RO start-up and commissioning).
  • Leading the O&M Mechanical team to carry out the Preventive and Corrective maintenance works on the entire plant.
  • Leading the O&M Mechanical team to installation all Equipment Like RO System (HP Pump ,Booster pump, ERD Pump ,second pass Pump & Pretreatment system& seawater intake & Dosing systems& Post-treatment & install all types of membranes according to the recommendation ofthe manual installation & Managing and Optimization of Process and CIP chemicals.
  • Commissioning of the Group 1 (100 MIGD) work activities.
  • Plant proven test activities for COD 1

Mechanical Supervisor & Commissioning,

Abengoa / FISIA ABEIMA L.L.C
Salalah Desalination Water Plant Dhofar , Sultanate oman
08.2019 - 12.2020
  • Project : Salalah Desalination 120 MIGD
  • Country : Salalah Oman
  • · Client : ACWA Power( Dhofar Desalination Company SAOC )
  • Employer: ABENGOA
  • Scope : Installation of Mechanical Equipment (Static, Rotating) and start-up & commissioning
  • Managing overall responsibility for effectively coordinating team contractors (supervision) and workforce & Following- up onday-to-day work activities to reach the schedule targets of the sub-contractor company( Power Mech Project Limited LLC. ) (Installation, and Alignment all Mechanical Equipment & Commissioning and RO start-up and commissioning).
  • Leading the O&M Mechanical team to carry out the Preventive and Corrective maintenance works on the entire plant.
  • Pre-commissioning and Commissioning
  • GRP Piping and inline elements,Super Duplex and Stainless-steel Piping and inline Elements,Pipe Racks, and support structure,PE service and chemical lines with their inline elements
  • Procurement and onsite warehouse material Management for Piping,
  • Media Loading, Membrane loading
  • Underwater rehabilitation works on Intake well, Laid Pipelines
  • · Field Supervision for Commissioning and Plant operation activities
  • · Punch Points and observation closing, · Warranty Defect Closing
  • Leading the O&M Mechanical team to install all Equipment Like RO System (HP Pump, Booster pump, ERD Pump, second pass Pump & Pretreatment system& seawater intake & Dosing systems& Post-treatment & install all types of membranes according to the recommendation the manual installation & Managing and Optimization of Process and CIP chemicals.

Mechanical Supervisor & Commissioning,

Abengoa / FISIA ABEIMA
Shuaibah III Expansion II Desalination Water Plant, , SAUDI ARABIA
12.2017 - 06.2019
  • Project : Shuaibah II Expansion III Desalination RO Plant. 250.000 m3/day
  • Country : Shuaibah – Jeddah – Arabia Saudi
  • · Client : ACWA Power - STPC
  • Employer : Abengoa / FISIA ABEIMA
  • Scope : Installation of Mechanical Equipment’s (Static, Rotating) and start up & commissioning
  • Managing overall responsibility for effectively coordinating of team contractors (supervision) and workforce & Following- up day-to-day work activities to reach the schedule targets of the sub-contractor company( Power Mech Project Limited LLC. & TreviASC Company ) (Installation, and Alignment all Mechanical Equipment & Commissioning and RO start-up and commissioning).
  • Leading the O&M Mechanical team to carryout the Preventive and Corrective maintenance works on the entire plant.
  • Pre-commissioning and Commissioning
  • GRP Piping and inline elements,Super Duplex and Stainless-steel Piping and inline Elements,Pipe Racks and support structure,PE service and chemical lines with their inline elements
  • Procurement and onsite warehouse material Management for Piping,
  • Media Loading, Membrane loading
  • Underwater rehabilitation works on Intake well, Laid Pipelines
  • · Field Supervision for Commissioning and Plant operation activities
  • · Punch Points and observation closing, · Warranty Defect Closing
  • Leading the O&M Mechanical team to installation all Equipment Like RO System (HP Pump, Booster pump, ERD Pump, second pass Pump & Pretreatment system& seawater intake & Dosing systems& Post-treatment & install all types of membranes according to the recommendation the manual installation & Managing and Optimization of Process and CIP chemicals.

Mechanical Supervisor & Commissioning,

Samsung C&T Corporation · Contract
RABIGH 2IPP 2050 MW Independent Power Plant, Jeddah, Saudi Arabia
04.2016 - 12.2017
  • Project : RABIGH 2IPP 2050 MW (6 * Siemens Gas Turbine SGT6- 5000F 5EE & 3 * Siemens Steam Turbine SST6- 5000).
  • Country : Rabigh 2 - Jeddah —Arabia Saudi
  • Client : ACWA Power — STPC
  • Employer : Samsung C&T Corporation · Contract
  • Scope : SCT Commissioning Supervisor for 3 unit ST / STG (SST-5000) for all system - ( lube oil flushing (adjusting throttle valve and lifting the shaft) and adjusted the sensor for bearing,
  • Check all activity before start the steam turbine,
  • control oil system, steam turbine controller)
  • turning gear operation and function test on TG operation,
  • Check the steam blow (CFR , target )
  • Function test for the valves,
  • Protection test for steam turbine,
  • steam purity specification and bypass operation)
  • valve test and preparation for start ST
  • check all electrical test and synchronization
  • During the commissioning process in line with the commissioning schedule.
  • Send all RFI and report about any problem in ST.
  • Which included Gas blowing line, Fuel oil flushing, control oil flushing ,
  • Water injection system flushing.
  • Pre commissioning start up testing Multi-function fuel system
  • Commissioning for Purge Air system & Instrument air system |
  • Commissioning for fuel gas system,
    # Fuel gas system have 7 gas compressors, 5 gas reduction stations, 4 water bath heaters
    # Commissioning for Fuel oil system Arabian supper light ASL system,
    # Commissioning for N2 generation unit (2unit)

Piping Superintendent

ARABIAN BEMCO CONTRACTING.LTD
QURAYYAH CCPP-11 & Riyadh power plant-pp10, Riyadh-Saudi Arabia
10.2012 - 03.2016
  • Project : QURAYYAH CCPP-11 & Riyadh power plant-pp10
  • Country : QURAYYAH- Riyadh
  • Client : Saudi Electricity company
  • Employer : ABENGOA
  • Scope : Senior of piping & team leader for construction, fabrication, welding & installation activities of underground & aboveground & Shutdown project facilities.
  • Co-ordinate with other disciplines and interface with clients on technical issues.
  • Reviews and approves the Construction Site Inspection and Test Plans (ITPs) issued by EPC Contractor and witnesses major activities selected by PMC to ensure that the contraction work done properly and according to Specification and Drawings
  • Supervision Plant layout/Controlling piping teamwork with other discipline activities for Conceptual & Detail design work
  • Construction supervision of fabrication, fit up, welding process, heat treatment, erection of large & small-bore piping network for different operation systems.
  • Inspection & Quality control of all construction process related to Subcontracts Company


Piping Superintendent

Techint Cimi Montubi (Italian co)
Methanol plant Damietta 1 Project Country, Egypt
10.2008 - 03.2009
  • Project : Methanol plant Damietta 1 Project
  • Country : Damietta- Egypt
  • Client : EMETHANEX COMPANY
  • Employer : Techint Cimi Montubi
  • Scope : Senior of piping & team leader for construction, fabrication, welding & installation activities of underground & aboveground & Shutdown project facilities.
  • Co-ordinate with other disciplines and interface with clients on technical issues.
  • Reviews and approves the Construction Site Inspection and Test Plans (ITPs) issued by EPC Contractor and witnesses major activities selected by PMC to ensure that the contraction work done properly and according to Specification and Drawings
  • Supervision Plant layout/Controlling piping teamwork with other discipline activities for Conceptual & Detail design work
  • Construction supervision of fabrication, fit up, welding process, heat treatment, erection of large & small-bore piping network for different operation systems.
  • Inspection & Quality control of all construction process related to Subcontracts Company

Mechanical Operations Supervisor

Consolidated Contractors International Company
Ras Laffan, QATARG
10.2006 - 03.2008
  • Project : QATAR —RASLAFFN-QGX-LNG Natural Gas TRIN 4&5
  • Country : RASLAFFN - QATAR
  • Client : QATAR GAS
  • Employer : Consolidated Contractors International Company
  • Scope : Senior of piping & team leader for construction, fabrication, welding & installation activities of underground & aboveground & Shutdown project facilities.
  • Co-ordinate with other disciplines and interface with clients on technical issues.
  • Reviews and approves the Construction Site Inspection and Test Plans (ITPs) issued by EPC Contractor and witnesses major activities selected by PMC to ensure that the contraction work done properly and according to Specification and Drawings
  • Supervision Plant layout/Controlling piping teamwork with other discipline activities for Conceptual & Detail design work
  • Construction supervision of fabrication, fit up, welding process, heat treatment, erection of large & small-bore piping network for different operation systems.
  • Inspection & Quality control of all construction process related to Subcontracts Company
  • Leads the weekly Construction Site quality meetings with EPC Contractor
  • Manage & supervision qualified team of fabrication & Installation of piping network, pipe support & steel structure

Test packages execution & subsystems activity follow up and punch

clearing.

Piping Supervisor

BONATTI
IN Mellitah, Libyan
08.2004 - 05.2006
  • Project : in Mellitah Libyan —Natural Gas Liquefied
  • Country : Mellitah Libyan
  • Employer : BONATTI
  • Scope : Senior of piping & team leader for construction, fabrication, welding & installation activities of underground & aboveground & Shutdown project facilities.
  • Co-ordinate with other disciplines and interface with clients on technical issues.
  • Reviews and approves the Construction Site Inspection and Test Plans (ITPs) issued by EPC Contractor and witnesses major activities selected by PMC to ensure that the contraction work done properly and according to Specification and Drawings
  • Supervision Plant layout/Controlling piping teamwork with other discipline activities for Conceptual & Detail design work
  • Construction supervision of fabrication, fit up, welding process, heat treatment, erection of large & small-bore piping network for different operation systems.
  • Inspection & Quality control of all construction process related to Subcontracts Company

Education

Higher Diploma in Industrial Technician - Mechanical installations department

Damietta Industrial University, Damietta
11.1995 - 07.1997

safety -

Courses online from OSHA cademy , 15220 NW Greenbrier Beaverton, United States
06.2010 -
  • Energy Control Program (Lockout/Tagout)(6.0 hours)
  • Introduction to Ergonomics(4.0 hours)
  • Safety Supervision and Leadership(6.0 hours)
  • Fall Protection Program(7.0 hours)
  • Electrical Safety: for Technicians & Supervisors(7.0 hours)
  • Introduction to Safety Management(6.0 hours)
  • Effective Safety Committee Operations(6.0 hours)
  • Effective Accident Investigation(6.0 hours)
  • Introduction to OSH Training(6.0 hours)
  • Hazard Analysis and Control(5.0 hours)
  • Hazard Communication Program(5.0 hours)
  • Conducting a Job Hazard Analysis (JHA)(6.0 hours)
  • Effective OSH Committee Meetings(5.0 hours)
  • Personal Protective Equipment(5.0 hours)

Skills

  • Commissioning of Equipment including site verification and mechanical preparation of equipment
  • Coordination with theE&I team to prepare and execute the equipment testing
  • Mechanical Installation, Underground & Above Ground GRP, HDPE Piping, Chemical Piping SS & Super Duplex piping, Under & above ground Ductile Iron Piping, Hydro testing and other testing, Commissioning
  • Evaluation of equipment performance/problems and to suggest modifications
  • Ensuring the availability of Mechanical systems for operation trail run test, Reliability test and performance test including before and after the PCOD
  • Supervise, Coordinate and participate in the preventive, corrective and troubleshooting maintenance activities of the plant equipment
  • Coordination with the client and contractor in closing the punch lists before system handover
  • Coordination with client to complete the Shutdown/maintenance activities without any delay
  • Experience in commissioning of coal handling plant and its equipment
  • Experience in post completion of mechanical checks for mechanical and erection completion certification
  • Planning, Scheduling, monitor the site execution of Shutdown activities
  • Conducting Root cause analysis of any mechanical failures with the team members
  • Actively supervises the contractor for the maintenance activity Material handling & control
  • Resource Plan & control & Equipment and Manpower handling Prepare the list of spares, tools and other material required during commissioning and operation of the plant
  • Prepare MTO for project material and monitor site consumption Liaise with client for site execution, inspections and testing
  • Interpreting contract & understanding project scope of work
  • Test packages execution & subsystems activity follow up and punch clearing

Languages

English
Advanced
C1
Spanish
Elementary
A1
Arabic
Native
A1

Additional Information

Reference

  • Mr.Wonil Seo: Samsung C&T Commissioning Manager Tel +821094089279 wonil.seo@samsung.com
  • Mr.Nicol Roy: SAMSUNG Commissioning Manager nicol.roy@samsung.com Tel +4475398112
  • Mr.Ahmed Hamed: ST TFA at Siemens ahmed9601@gmail.com
  • Moustafa Abouelyazid :BTW manager Egypt Contact No. +20453351940 &+201066598774 Email: Abo_Elyazed55@yahoo.com mostaf abuelyazid@gmail.com
  • Ehab Elfeky: Commissioning Engineer Elfeky.ehab@gmail.com ehabelfeky2003@yahoo.Com
  • Jose Manuel Casillas Carbajosa

Work availability

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
morning
afternoon
evening
swipe to browse

Timeline

Mechanical Supervisor & Commissioning, - Cox Energy- Coxabengoa Group
01.2020 - Current
Mechanical Supervisor & Commissioning, - Abengoa / FISIA ABEIMA L.L.C
08.2019 - 12.2020
Mechanical Supervisor & Commissioning, - Abengoa / FISIA ABEIMA
12.2017 - 06.2019
Mechanical Supervisor & Commissioning, - Samsung C&T Corporation · Contract
04.2016 - 12.2017
Piping Superintendent - ARABIAN BEMCO CONTRACTING.LTD
10.2012 - 03.2016
Courses online from OSHA cademy - safety,
06.2010 -
Piping Superintendent - Techint Cimi Montubi (Italian co)
10.2008 - 03.2009
Mechanical Operations Supervisor - Consolidated Contractors International Company
10.2006 - 03.2008
Piping Supervisor - BONATTI
08.2004 - 05.2006
Damietta Industrial University - Higher Diploma in Industrial Technician , Mechanical installations department
11.1995 - 07.1997
IBRAHIM HAMDY ALI NABHAN