Summary
Overview
Work History
Education
Skills
Languages
Certification
References
Timeline
Generic
Irfan Shaikh

Irfan Shaikh

Dubai,UAE

Summary

A Dynamic result oriented project engineering (MEP) professional with sound abilities in building / developing project team, vendor / supplier relations. Holding a note worthy 16 + Years experience in HVAC / MEP Project Management, Project Sales, Project Execution, Materials Planning , Sourcing and Procurement, Supply Chain Management, Detail analysis of Project Life Cycle to optimize resource utilization to achieve SMART result.

Overview

16
16
years of professional experience
8
8
years of post-secondary education
1
1
Certification

Work History

Sr. MEP Coordinator

Shapoorji Pallonji Interior Division
Dubai, UAE
08.2022 - Current
  • Engineering Coordination between MEP Team , Civil team, Design and Supervision Consultant for 20 storey premium residential tower in business bay.
  • Acting Construction Manager - MEP to push Sub Contractor to deliver on time and enhance productivity.
  • Close monitoring of HVAC , Plumbing , Fire Fighting works in Coordination with Architectural and Id team.
  • Close Liaison with all stack holders in Project, Managing Site team.
  • Taking lead in resolving day to day issues and bottlenecks in Project Execution.
  • Direct reporting to Sr Project Manager, Project Director on Project progress.
  • Maintaining client relationship.

Site Incharge - MEP

Dyn Corp International (MGT)
Abudhabi
03.2019 - 06.2022
  • MEP Projects for US Base WRM Facilities in Abu Dhabi based Dhafra Air Base. Monthly revenue generation from MEP works - 2 Million Dollars approximately.
  • HVAC, Plumbing, Fire Fighting, Generator set, Air compressor, Paint Booth, Installation, Testing & Commissioning, Project Co-ordination, Vendor Management, Billing , Estimation, Planning, Procurement , Vendor Management.
  • Supervised maintenance team and reviewed completed work to evaluate performance.
  • Procured information from various vendors to support cost-effective purchasing.
  • Maintained daily facility operations with strong focus on preventive maintenance and swift repairs.
  • Estimated costs of labour and materials to manufacture, install, or maintain specified equipment.
  • Tested systems and compiled data to inform design process and guide changes.
  • Recommended changes to designs to improve performance or functionality.
  • Restored equipment to operational condition by removing and replacing or repairing components.
  • Diagnosed faults and carried out or assigned repair tasks to minimise downtime.
  • Documented daily work performed in company logs and on equipment-specific reports.

Project Engineer - MEP

Lodha Group
Mumbai, India
10.2013 - 02.2018
  • Keeping track of wall, Beam and slab opening being incorporated in building structure by Main Contractor
  • Confirming accuracy of installation as per approved drawing while quality and work inspection
  • HVAC, Plumbing, Fire Fighting ITC for 6 X 81 stories hi rise (AC: Toshiba Carrier Splits and Duct-able Units) Project Co-ordination, SAP Operation (MM) Infra HVAC, Plumbing Operations, Vendor Management, Billing, Estimation, Quantification
  • Mechanical, HVAC , Plumbing - Procurement.
  • Enforced health and safety protocols to minimise accidents and injury.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Reviewed designs, plans and reports to ensure constant compliance with project specifications.
  • Created detailed project schedules, working closely with contractors to manage deadlines.

Mechanical Engineer

Drake & Scull International PJSC
Doha
05.2012 - 09.2013
  • HVAC, Plumbing, Installation, Testing, Commissioning for Central Plant, Office & Canteen Building, Medical Centre and External Networks
  • Working as per EHS Norms laid by Qatar Petroleum
  • For Multipurpose Administration Complex, Ras-Laffan, Qatar
  • Client: Qatar Petroleum (QP) Consultant: LEIGH & ORANGE LTD
  • Main Contractor: Consolidated Contractors Company (CCC)
  • Collaborated with engineering team to complete projects.
  • Reviewed designs with constructive feedback to improve project outcomes.
  • Offered technical guidance, peer review and mentorship to junior engineers.
  • Sourced and coordinated suppliers for fabrication and assembly processes.

Project Execution Engineer

Voltas Limited
Mumbai
06.2008 - 03.2012

Project Execution of HVAC equipment's namely package units , Duct -ables , VRF units , Chillers.

  • Keeping track of Warranty Claims and Services during period of Annual Maintenance Contract for HVAC Equipment's.
  • Vendor Management, Billing, Estimation, Quantification.
  • Keeping track of proper and timely service of equipment's under AMC Contracts and Warranty period with 24 x 7 Customer Support.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Coordinated project resources, goals and activities, facilitating successful closure and handover.
  • Checked client requirements and generated solutions from identified needs.
  • Created detailed project schedules, working closely with contractors to manage deadlines.
  • Responded quickly to emergency outages, providing rapid repairs to limit operational disruption.
  • Implemented policies and devices to improve workplace safety.
  • Project: BPCL , RBI , R City Mall.

Project Engineer - Mechanical

AGNICE Electromechanical
Dubai, United Arab Emirates
04.2018 - 03.2019
  • Project Execution Incharge - Mechanical for renowned ware house project DB Schenker in JAFZA.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Reviewed designs, plans and reports to ensure constant compliance with project specifications.
  • Produced project progress reports for stakeholder reviews and meetings.
  • Created detailed project schedules, working closely with contractors to manage deadlines.
  • Estimated costs, scheduling requirements and labor needs to produce engineering designs.
  • Enforced health and safety protocols to minimise accidents and injury.
  • Oversaw field projects implementing engineering designs and maintained strict compliance with specifications and applicable codes.

Education

BE Production (Mechanical) - Engineering

Mumbai University
India
06.2003 - 05.2008

MBA - Operations and Statistics

NMIMS
India
06.2014 - 03.2017

Skills

  • MEP Project Execution
  • Budgeting
  • Cost Analysis
  • Operations Management
  • Communication
  • Delegation
  • Conflict resolution
  • Deadline management
  • Task delegation
  • Supply negotiation

Languages

English
Fluent
Hindi
Native
Urdu
Fluent
Marathi
Fluent

Certification

Accredited Member of Society of Engineers - UAE since July 2024

Valid UAE Driving Licence issued on 15.06. 2020 from Abudhabi

References

References available upon request.

Timeline

Sr. MEP Coordinator

Shapoorji Pallonji Interior Division
08.2022 - Current

Site Incharge - MEP

Dyn Corp International (MGT)
03.2019 - 06.2022

Project Engineer - Mechanical

AGNICE Electromechanical
04.2018 - 03.2019

MBA - Operations and Statistics

NMIMS
06.2014 - 03.2017

Project Engineer - MEP

Lodha Group
10.2013 - 02.2018

Mechanical Engineer

Drake & Scull International PJSC
05.2012 - 09.2013

Project Execution Engineer

Voltas Limited
06.2008 - 03.2012

BE Production (Mechanical) - Engineering

Mumbai University
06.2003 - 05.2008
Irfan Shaikh