Dynamic and results-driven Project Manager with over 13 years of experience in delivering high-stakes façade projects, including notable works like Skyport and Dubai College. Expertise in curtain wall systems, ACP cladding, glazing, pergolas, and louver systems, with a strong ability to navigate real-time site challenges, structural constraints, and tight deadlines. Proven track record in managing design coordination, shop drawing approvals, and procurement while effectively collaborating with consultants and main contractors. Skilled in resolving critical issues such as span/deflection limitations and material delays through practical, site-oriented solutions, leading teams to ensure timely project completion without compromising quality or safety standards.
anaged full lifecycle of façade projects, including planning, design coordination, procurement, execution, and final handover.
Coordinated with consultants, main contractors, and internal teams to ensure timely submission and approval of shop drawings, material submittals, and structural calculations.
Reviewed and verified façade shop drawings to minimize consultant rejections and avoid delays.
Supervised site installation activities for curtain wall, ACP cladding, glazing, pergolas, and louver systems.
Monitored project progress at Skyport and Dubai College, addressing delays related to material shortages and coordination gaps.
Managed procurement and ensured timely delivery of critical materials such as glass, ACP, brackets, and accessories.
Resolved technical challenges including structural span limitations (deflection issues), installation constraints, and site coordination conflicts.
Maintained direct communication with main contractors and consultants, handling RFIs, approvals, and urgent site issues.
Ensured quality compliance through inspections and proper execution as per approved drawings.
Enforced health and safety practices on-site in coordination with HSE teams.
Supported cost control, variation claims, and project reporting.
Key Achievements:
Successfully handled critical site issues under pressure from main contractors, avoiding major project delays.
Managed structural limitations in pergola and façade elements by proposing feasible alternatives aligned with design and safety requirements.
Improved coordination between site, design, and procurement teams to reduce delays in material delivery and drawing approvals.
Delivered façade works in fast-track environments while maintaining required quality standards.
MAJOR PROJECTS
SKYPORTS RTA FLYING TAXI PROJECT
CLIENT RTA CONTRACTOR ATS
DUBAI COLLEGE JUMERIAH
CLIENT D C
ALAYA VILLAS 346 VILLAS
CONTRACTOR UNEC
NOYA PROJECT - YAS ISLAND (Abu Dhabi) - 1400 Villas, Community Center & Neighborhood Center
(Client - ALDHAR; Contractor - Fibrex Construction L.L.C)
BEACH VIEW - (Dubai Harbour) -40 floor , 2 towers
(Client - EMAAR ;
MISK & VILLA PROJECT - ARADA (Sharjah)
(Client - AL JADA ; Contractor - Intermass)