In Compliance with International H & S Standards and advisories and as per SOPs 12 Hour rotational shift duty having timely trouble shooting and remedial action (Loop Checking and testing, Validation & Calibration, Short term and Long Term Solutions, Accessories or complete Replacements, erection work, overhauling and maintenance, routine inspections) response to the instrumentation complaints being soft reported to the Supervisor at the end of every shift
ISO Certifications Int
& Ext
Audits and certifications Record Keeping Coordination with the direct Engineer in Preparation and Maintenance of documentation record in hard and soft forms
Filing arrangements of Daily, weekly, monthly & six monthly inspection documents and forms
SAFETY & LOTO TRANNINGS Got safety tanning as world strict standards (RAK 1, 5, 7) and loto
Accessories and Spares
Coordination with the team to maintain the accessories and spares regarding area instrumentation
Having done so during night duties and odd hours replacement of spares and accessories is not dependent to the upstream
Shut Down Planning, Execution and Leading the Hired Crew
I am a part of Shutdown planning and execution team
Responsible for the safe, qualitative and timely completion of the delegated activity being a leader of hired technicians and helpers team
Projects and Modifications
I use to be a part of The Modification Projects, new installations and system modifications
Retaining good drawing and sketching skills I am often being given the responsibility drawing preparations of internal modifications
Annual Objectives and IDP (Individual Development Plans)
Working in a challenging multinational organization has made me to earn my progress and growth as the efficiency and the performance is measured on a annual objective based scale
So I have to comply with all needs and I am the one who has never been awarded other than A or B in Annual Appraisal System since last Years
(10000TPD) plant
Tech (Elect &instrumentation)
ABB
01.2011 - 01.2013
Company Overview: ON VALE Palletizing Plant (9 Million Ton/year)
ON VALE Palletizing Plant (9 Million Ton/year)
Instrument & Electrical Sr Technician
UNION CEMENT COMPANY
01.2008 - 01.2011
Company Overview: UAE
Being a part of the Instrument and Control Team of this i was responsible for the following activities
Planning Erection and Commissioning Team Member
I take part in erection and commissioning work and later worked in shifts and rectify the coming faults
In shut downs we make maintaince and calibration of instruments
UAE
Sr. Technician Instrumentation in Kiln Area
LAFARGE Pakistan Cement company Kalarkahar
01.2005 - 01.2008
Company Overview: (FRANCE based largest International cement manufacturing company having industrial units in more than 70 countries worldwide, complied with International industrial standards.)
(FRANCE based largest International cement manufacturing company having industrial units in more than 70 countries worldwide, complied with International industrial standards.)
Supervisor instrumentation
PIONER CEMENT COMPANY
01.2002 - 01.2005
Instrument Installation, Erection, Commissioning and calibration Activity