Overview
Work History
Timeline
Generic

KAMRAN NAEEM MALIK

AL AIN

Overview

23
23
years of professional experience

Work History

Sr Tech Instrumentation, Electrical&Automation

ARKAN
Al Ain
01.2013 - Current
  • Company Overview: (10000TPD) plant
  • Operational Shift Duty
  • In Compliance with International H & S Standards and advisories and as per SOPs 12 Hour rotational shift duty having timely trouble shooting and remedial action (Loop Checking and testing, Validation & Calibration, Short term and Long Term Solutions, Accessories or complete Replacements, erection work, overhauling and maintenance, routine inspections) response to the instrumentation complaints being soft reported to the Supervisor at the end of every shift
  • ISO Certifications Int
  • & Ext
  • Audits and certifications Record Keeping Coordination with the direct Engineer in Preparation and Maintenance of documentation record in hard and soft forms
  • Filing arrangements of Daily, weekly, monthly & six monthly inspection documents and forms
  • SAFETY & LOTO TRANNINGS Got safety tanning as world strict standards (RAK 1, 5, 7) and loto
  • Accessories and Spares
  • Coordination with the team to maintain the accessories and spares regarding area instrumentation
  • Having done so during night duties and odd hours replacement of spares and accessories is not dependent to the upstream
  • Shut Down Planning, Execution and Leading the Hired Crew
  • I am a part of Shutdown planning and execution team
  • Responsible for the safe, qualitative and timely completion of the delegated activity being a leader of hired technicians and helpers team
  • Projects and Modifications
  • I use to be a part of The Modification Projects, new installations and system modifications
  • Retaining good drawing and sketching skills I am often being given the responsibility drawing preparations of internal modifications
  • Annual Objectives and IDP (Individual Development Plans)
  • Working in a challenging multinational organization has made me to earn my progress and growth as the efficiency and the performance is measured on a annual objective based scale
  • So I have to comply with all needs and I am the one who has never been awarded other than A or B in Annual Appraisal System since last Years
  • (10000TPD) plant

Tech (Elect &instrumentation)

ABB
01.2011 - 01.2013
  • Company Overview: ON VALE Palletizing Plant (9 Million Ton/year)
  • ON VALE Palletizing Plant (9 Million Ton/year)

Instrument & Electrical Sr Technician

UNION CEMENT COMPANY
01.2008 - 01.2011
  • Company Overview: UAE
  • Being a part of the Instrument and Control Team of this i was responsible for the following activities
  • Planning Erection and Commissioning Team Member
  • I take part in erection and commissioning work and later worked in shifts and rectify the coming faults
  • In shut downs we make maintaince and calibration of instruments
  • UAE

Sr. Technician Instrumentation in Kiln Area

LAFARGE Pakistan Cement company Kalarkahar
01.2005 - 01.2008
  • Company Overview: (FRANCE based largest International cement manufacturing company having industrial units in more than 70 countries worldwide, complied with International industrial standards.)
  • (FRANCE based largest International cement manufacturing company having industrial units in more than 70 countries worldwide, complied with International industrial standards.)

Supervisor instrumentation

PIONER CEMENT COMPANY
01.2002 - 01.2005
  • Instrument Installation, Erection, Commissioning and calibration Activity

Timeline

Sr Tech Instrumentation, Electrical&Automation

ARKAN
01.2013 - Current

Tech (Elect &instrumentation)

ABB
01.2011 - 01.2013

Instrument & Electrical Sr Technician

UNION CEMENT COMPANY
01.2008 - 01.2011

Sr. Technician Instrumentation in Kiln Area

LAFARGE Pakistan Cement company Kalarkahar
01.2005 - 01.2008

Supervisor instrumentation

PIONER CEMENT COMPANY
01.2002 - 01.2005
KAMRAN NAEEM MALIK