Summary
Overview
Work History
Education
Skills
Languages
Custom Section
Personal Information
Timeline
Generic
KANDASAMY R

KANDASAMY R

Sharjah

Summary

Mechanical engineer in oil and gas industry to secure a position as an Erection Engineer specializing in Static & Rotary Equipment in a reputed organization, where I can utilize my experience in installation, erection, alignment, and commissioning support activities for Oil & Gas, Petrochemical, and EPC projects. Seeking to contribute strong site execution skills, safety awareness, and technical knowledge to ensure successful project completion within schedule and quality standards.

Overview

13
13
years of professional experience

Work History

SENIOR ENGINEER PROJECTS

TECHNOMAK ENERGY INTERNATIONAL FZC
01.2026 - Current

CONSTRUCTION ENGINEER MODULES (Static and Rotary Erection)

QUALITY INTERNATIONAL COMPANY Ltd (FZC)
09.2024 - 01.2026
  • Managed execution scope for 82 types of static and rotary equipment in process modules (PAU), ensuring safe installation of approximately 1200 MT of equipment.
  • Oversaw erection of heavy equipment, including Process Condensate Separator weighing 115 MT, contributing to project milestones and timelines.
  • Supervising team members in preparation and implementation of drawings and documents for projects.
  • Managed the successful handover of completed projects to clients, conducting final inspections and addressing any post-construction requirements.
  • Guided projects to meet timescales, budgets and agreed specifications.

SENIOR SITE EXECUTION ENGINEER (STATIC & ROTARY EQUIPMENT ERECTION)

L&T HYDROCARBON ENERGY ENGINEERING LTD (MODULAR FABRICATION UNIT)
12.2019 - 01.2024
  • Managed handling and installation of 431 static and rotary package equipment in Process Modules (PAU), ensuring safe and efficient yard installation of approximately 4400 MT.
  • Successfully handled erection of heavy equipment including POX Reactor and KO Drum with maximum lifting weight up to 155 MT.
  • Executed installation, erection, and precision alignment of 67 centrifugal pumps, adhering to vendor requirements and project standards for enhanced operational efficiency.
  • Performed installation of various equipment such as Drums, Plate Heat Exchangers, Shell & Tube Heat Exchangers, Air Fin Coolers, POX Reactors, Reaction Furnaces, Syngas Scrubbers, Water Knock Out Drums, HP & LP Steam Separators, and Thermo Oil Skids.
  • Managed preservation activities for static equipment during storage yard phase, construction phase, sail away phase, and package phase as per project preservation procedures.
  • Supervised construction activities including implementation of ITPs, method statements, and inspection requirements for critical equipment installation activities.
  • Maintained and verified mechanical completion (MC) records and handover documentation for completed systems.
  • Executed and supervised erection, installation, alignment, and pre-commissioning support activities for static equipment in compliance with approved drawings, project specifications, safety standards, and quality requirements.
  • Ensured safe and timely erection of pressure vessels, columns, heat exchangers, tanks, reactors, and skids as per approved construction procedures and project schedules.
  • Coordinated with construction, QA/QC, welding, rigging, planning, and client inspection teams to ensure seamless execution of erection activities, fostering collaboration and minimising delays.
  • Monitored manpower, equipment, and material utilization to achieve maximum productivity and minimize construction delays.
  • Verified equipment orientation, elevation, alignment, bolt tightening, grouting, and dimensional checks as per engineering tolerances and approved standards.
  • Ensured compliance with international codes, project specifications, HSE regulations, and client quality requirements during all erection activities.
  • Prepared and maintained erection reports, method statements, inspection records, punch list clearance reports, and completion dossiers.
  • Supported pre-commissioning and mechanical completion activities by resolving site technical issues and coordinating with multidisciplinary teams.
  • Contributed technical support for heavy lifting plans, rigging operations, and erection sequencing of critical static equipment installation activities.
  • Achieved project execution targets with strong focus on safety, quality workmanship, and efficient resource management.
  • Conducted weekly construction meeting with contractor which facilitated stronger communication and ability to resolve critical issues.

SENIOR SITE EXECUTION ENGINEER

ARTSON ENGINEERING LTD (subsidiary of TATA PROJECTS LIMITED)
02.2019 - 11.2019

SITE EXECUTION ENGINEER

KRIYAA consultants and Engineers (P) Ltd
07.2017 - 04.2018

EXECUTION ENGINEER (Mechanical)

AR INDUSTRIAL ENGINEERS PVT LTD
06.2016 - 06.2017
  • Project: KUWAIT OIL CORPORATION, GC-31 {STORAGE TANK PACKAGE}
  • Implemented ISO 9001, ISO 14001, and OHSAS 18001 standards, improving quality and safety protocols across projects.
  • Tested equipment, machinery and instruments to assess proper functioning.
  • Kept project leaders regularly updated with progress, maintaining open, productive communication.
  • Managed maintenance data records and tracked maintenance and operating information for onsite reference.

TRAINEE ENGINEER (Mechanical)

ACCURATE LOGISTICS [LARSEN & TOUBRO]
Jamnagar, Gujarat
07.2014 - 04.2016
  • Project: RELIANCE INDUSTRIES LIMITED, J3 Ethylene Cryogenic Storage Package
  • Completed tasks efficiently and timely, as instructed by engineering managers.
  • Participated in weekly team meetings, providing valuable input on project progress and potential improvements.
  • Provided assistance in assembly and maintenance of engineering and other technical files.

Mechanical Engineer

AKR FABRICATORS AND ERECTORS
Mangalore
07.2013 - 06.2014
  • Project: OMPL Project
  • Monitored the installation of mechanical systems, guaranteeing adherence to safety regulations and standards.
  • Oversaw quality control, maintenance and repairs throughout projects.
  • Continually improved methods and procedures for processes, measurement, documenting and workflow techniques.

Education

B.E -

Einstein College of Engineering
Tirunelveli
01-2013

Diploma -

P.A.C.R Polytechnic college
Rajapalayam
01-2010

SSLC -

P.A.C.M high school
Rajapalayam
01-2007

Skills

  • Static equipment erection
  • Rotary equipment alignment
  • Structural fabrication
  • Manpower management
  • Equipment installation

Languages

Hindi
English
Tamil

Custom Section

  • Tankage Construction
  • Static Equipment Erection
  • Rotary Equipment Erection and Alignment
  • Structural Fabrication and Erection
  • Manpower Management
  • Microsoft Office Word/PowerPoint/Excel

Personal Information

  • Passport Number: Z7572279
  • Passport Expiry Date: 2034-01-18
  • Father's Name: Rajaguru.K

Timeline

SENIOR ENGINEER PROJECTS

TECHNOMAK ENERGY INTERNATIONAL FZC
01.2026 - Current

CONSTRUCTION ENGINEER MODULES (Static and Rotary Erection)

QUALITY INTERNATIONAL COMPANY Ltd (FZC)
09.2024 - 01.2026

SENIOR SITE EXECUTION ENGINEER (STATIC & ROTARY EQUIPMENT ERECTION)

L&T HYDROCARBON ENERGY ENGINEERING LTD (MODULAR FABRICATION UNIT)
12.2019 - 01.2024

SENIOR SITE EXECUTION ENGINEER

ARTSON ENGINEERING LTD (subsidiary of TATA PROJECTS LIMITED)
02.2019 - 11.2019

SITE EXECUTION ENGINEER

KRIYAA consultants and Engineers (P) Ltd
07.2017 - 04.2018

EXECUTION ENGINEER (Mechanical)

AR INDUSTRIAL ENGINEERS PVT LTD
06.2016 - 06.2017

TRAINEE ENGINEER (Mechanical)

ACCURATE LOGISTICS [LARSEN & TOUBRO]
07.2014 - 04.2016

Mechanical Engineer

AKR FABRICATORS AND ERECTORS
07.2013 - 06.2014

B.E -

Einstein College of Engineering

Diploma -

P.A.C.R Polytechnic college

SSLC -

P.A.C.M high school
KANDASAMY R