Mechanical engineer in oil and gas industry to secure a position as an Erection Engineer specializing in Static & Rotary Equipment in a reputed organization, where I can utilize my experience in installation, erection, alignment, and commissioning support activities for Oil & Gas, Petrochemical, and EPC projects. Seeking to contribute strong site execution skills, safety awareness, and technical knowledge to ensure successful project completion within schedule and quality standards.
Overview
13
13
years of professional experience
Work History
SENIOR ENGINEER PROJECTS
TECHNOMAK ENERGY INTERNATIONAL FZC
01.2026 - Current
CONSTRUCTION ENGINEER MODULES (Static and Rotary Erection)
QUALITY INTERNATIONAL COMPANY Ltd (FZC)
09.2024 - 01.2026
Managed execution scope for 82 types of static and rotary equipment in process modules (PAU), ensuring safe installation of approximately 1200 MT of equipment.
Oversaw erection of heavy equipment, including Process Condensate Separator weighing 115 MT, contributing to project milestones and timelines.
Supervising team members in preparation and implementation of drawings and documents for projects.
Managed the successful handover of completed projects to clients, conducting final inspections and addressing any post-construction requirements.
Guided projects to meet timescales, budgets and agreed specifications.
SENIOR SITE EXECUTION ENGINEER (STATIC & ROTARY EQUIPMENT ERECTION)
L&T HYDROCARBON ENERGY ENGINEERING LTD (MODULAR FABRICATION UNIT)
12.2019 - 01.2024
Managed handling and installation of 431 static and rotary package equipment in Process Modules (PAU), ensuring safe and efficient yard installation of approximately 4400 MT.
Successfully handled erection of heavy equipment including POX Reactor and KO Drum with maximum lifting weight up to 155 MT.
Executed installation, erection, and precision alignment of 67 centrifugal pumps, adhering to vendor requirements and project standards for enhanced operational efficiency.
Performed installation of various equipment such as Drums, Plate Heat Exchangers, Shell & Tube Heat Exchangers, Air Fin Coolers, POX Reactors, Reaction Furnaces, Syngas Scrubbers, Water Knock Out Drums, HP & LP Steam Separators, and Thermo Oil Skids.
Managed preservation activities for static equipment during storage yard phase, construction phase, sail away phase, and package phase as per project preservation procedures.
Supervised construction activities including implementation of ITPs, method statements, and inspection requirements for critical equipment installation activities.
Maintained and verified mechanical completion (MC) records and handover documentation for completed systems.
Executed and supervised erection, installation, alignment, and pre-commissioning support activities for static equipment in compliance with approved drawings, project specifications, safety standards, and quality requirements.
Ensured safe and timely erection of pressure vessels, columns, heat exchangers, tanks, reactors, and skids as per approved construction procedures and project schedules.
Coordinated with construction, QA/QC, welding, rigging, planning, and client inspection teams to ensure seamless execution of erection activities, fostering collaboration and minimising delays.
Monitored manpower, equipment, and material utilization to achieve maximum productivity and minimize construction delays.
Verified equipment orientation, elevation, alignment, bolt tightening, grouting, and dimensional checks as per engineering tolerances and approved standards.
Ensured compliance with international codes, project specifications, HSE regulations, and client quality requirements during all erection activities.
Prepared and maintained erection reports, method statements, inspection records, punch list clearance reports, and completion dossiers.
Supported pre-commissioning and mechanical completion activities by resolving site technical issues and coordinating with multidisciplinary teams.
Contributed technical support for heavy lifting plans, rigging operations, and erection sequencing of critical static equipment installation activities.
Achieved project execution targets with strong focus on safety, quality workmanship, and efficient resource management.
Conducted weekly construction meeting with contractor which facilitated stronger communication and ability to resolve critical issues.
SENIOR SITE EXECUTION ENGINEER
ARTSON ENGINEERING LTD (subsidiary of TATA PROJECTS LIMITED)
02.2019 - 11.2019
SITE EXECUTION ENGINEER
KRIYAA consultants and Engineers (P) Ltd
07.2017 - 04.2018
EXECUTION ENGINEER (Mechanical)
AR INDUSTRIAL ENGINEERS PVT LTD
06.2016 - 06.2017
Project: KUWAIT OIL CORPORATION, GC-31 {STORAGE TANK PACKAGE}
Implemented ISO 9001, ISO 14001, and OHSAS 18001 standards, improving quality and safety protocols across projects.
Tested equipment, machinery and instruments to assess proper functioning.