- TESTING ENGINEER APPROVAL STATUS IN UAE
► Approved for category no: C29,C30,C31,C33 (Ref.no: SSART-N-00443-3-01-53-2023)
Approved for category no: C29,C30,C31,C33 (Ref.no: TP-PTD-N-00330-3-01-Fax-0187-2021)
Approved for category no: C25 (Ref.no: PTD-G7-0488-2020)
Approved for category no: C29,C30,C31,C33 (Ref.no: PTD-S003-0198-2019)
Approved for category no: 10,11 (Ref.no: PTD-6028-0201-2018)
Approved for category no: 10,11(Ref.no: PTD-G2-6460-2017) Present Dubai Electricity and water Authority Approved as Transformer Testing Engineer for ICT,IBT,IDT,AVR, Reactor and Earthing Transformers Testing in Dubai.
► AADC Approval Reference No: A-3900.1
AL AIN DISTRIBUTION COMPANY Approved for CT, VT, Auxilliary Relays, Switch Gear and Transformers Testing in Al ain -Abu Dhabi.
- Present ongoing project:
- Responsible for Installation, Testing&Commissioning of DEWA – DMS-148929- 132/11KV Substation KHOYOOL SS – 50 MVA IDT’s make BEST- Turkey, 500 KVA ET’s make KONCAR D&ST- Croatia, and 10 MVAR REACTOR makes BEST Turkey Through AG POWER ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – AEDXB-M&I-2019-117 D&B- 132/11KV Substation SENAAT SS – 50 MVA IDT’s make KONCAR D&ST- Croatia, 500 KVA ET’s make KONCAR D&ST- Croatia, and 30 MVAr REACTOR’s makes ABB HITACHI, FINLAND Through AG POWER ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – PO#3091900073- 132/33KV Substation QUDRA ROAD SS (QUDRARD) - 90 MVA IBT’s make KONCAR D&ST- Croatia, 1500 KVA ET’s make KONCAR - Croatia, and 15 MVAR REACTOR makes HYOSUNG,Korea Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – PO#3091800002_ 400/132KV Substation SHAMS SS - 500 MVA ICT’s make –HYUNDAI E&E system co.Ltd ULSAN KOREA- Through HITACI ABB POWER GRIDS (LINXON)& SNC –LAVALIN Company Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – S003- 132/11KV Substation VILLANAS SS -50 MVA IDT’s make KONCAR D&ST- Croatia, 500 KVA ET’s make KONCAR D&ST- Croatia, Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – 6028- 132/11KV Substation FUNLAND SS - 50 MVA IDT’s make BEST- Turkey, 500 KVA ET’s make SEA Italy and 10 MVAR REACTOR makes BEST Turkey Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – 2020- 132/11KV Substation CREEK HARBOUR SS (CREKHRBR)– 50 MVA IDT’s make SGB- Germany, 500 KVA ET’s make BEST Turkey and 10 MVAR REACTOR makes ABB FINLAND Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA –PO#3761500078- 132/11KV Substation MADINA SS (MADINA)– 50 MVA IDT’s make GETRA- ITALY, 500 KVA ET’s make SEA ITALY and 10 MVAR REACTOR makes MAIDENSHA JAPAN Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – DPDP-PR-5013- 132/11KV Substation COASTLINE SS (COASLIN)– 50 MVA IDT’s make SGB- Germany, 500 KVA ET’s make BEST Turkey Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – PN1301-CP01- 132/11KV Substation DUBAI WORLD TRADE CENTRE SS (DWTC)– 50 MVA IDT’s make SGB- Germany, 500 KVA ET’s make BEST Turkey and 15 MVAR REACTOR makes ALSTOM Turkey Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Installation, Testing&Commissioning of DEWA – PO#3441300015/L/205938/14 132/11KV Substation GAZELLE SS (GSZL) AND JARA SS –15 MVAR REACTOR makes JAEPS Japan Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for Quality Assurance and Quality checking of Panorama views project 11/.400 kV Distribution board and Small power lighting system in assorted Tower Room Through BUREAU VERITAS – Duabai, UAE
- Responsible for testing and commissioning of ( RTA-DUBAI) - AL SUFOUH Transit system project (DUBAI TRAM) upto 120 KVA 280Ahr TIS-UPS in assorted 15 no’s of TPS,LPS Sub-Stations make AEG – GERMANY and 8.8 to 20 KVA APS-UPS in assorted 7 no’s of TPS Sub-Stations make EMERSON – FRANCE Through ALSTOM TRANSPORT - Dubai,UAE
- Responsible for testing and commissioning of ( RTA-DUBAI) - AL SUFOUH Transit system project (DUBAI TRAM) 750V DC APS System (T&C for APS Equipment in Traction Power Sub-Station, CAMS and APS Trackside Equipments) make ALSTOM- FRANCE Through ALSTOM TRANSPORT FRANCE- Dubai,UAE
- Responsible for testing of (ALSTOM GRID) DEWA - CE/0716A/2008 & TDG-2006-08 132/11KV Substation’s 50MVA IDT’s make AREVA , SGB- Germany , 500KVA ET’s make AREVA Turkey and 15MVAR & 10&15 MVAR REACTOR make AREVA Turkey Through ALSTOM GRID Dubai-UAE
- Responsible for testing of AADC- ADWEA CONTRACT REF: A-3900.1 PROJECT: Expansion & Reinforcement of 33 KV Network (Lot1, Lot2 & Lot3) - 33/11KV Sub-stations Through L&T ECC DIVISION AL AIN UAE.
- Responsible for testing of DEWA - CE/448C/2007 132/11KV Substation NEW GARHOUD (NWGR) – 50MVA IDT’s make SGB Germany, 500KVA ET’s make AREVA Turkey Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing of DEWA - CE/448C/2007 132/11KV Substation EMIRATES ROAD (EMRD) – 50MVA IDT’s make SGB Germany, 500KVA ET’s make AREVA Turkey and 10 MVAR REACTOR make JAEPS Japan Through EMIRATES ELECTRICAL ENGINEERINGLLC Dubai-UAE
- Responsible for testing of DEWA - CE/448C/2007 132/11KV Substation FACTORIES (FCTR) – 50MVA IDT’s make SGB Germany , 500KVA ET’s make AREVA Turkey and 15MVAR & 10 MVAR REACTOR make JAEPS Japan Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing of DEWA - NAS/A608/2006 132/11KV Substation NAD AL SHEEBA CMLR -2 – 50MVA IDT’s, 500KVA ET’s make BEST Turkey and 15MVAR REACTOR make JAEPS Japan Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing of DEWA - NAS/A608/2006 132/11KV Substation NAD AL SHEEBA-1 50MVA IDT’s, 500KVA ET’s make BEST Turkey and 15MVAR REACTOR make JAEPS Japan Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing of DEWA CE/288A/2006 132/11KV Substation DUBAI INDUSTRIAL CITY BUILDING – 50MVA IDT’s, 500KVA ET’s make BEST Turkey. Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing and commissioning of DEWA CE/107D/2006 132/11KV Substation DUBAI LAGOON (DXBL) – 50MVA IDT’s, 500KVA ET’s make BEST Turkey and 10MVAR REACTORmake JAEPS Japan. Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing and commissioning of DEWA CE/288A/2006 132/11KV Substation SUFOUH – 50MVA IDT’s, 500KVA ET’s make BEST Turkey. Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing of DEWA CE/288A/2006 132/11KV Substation INTERNATIONAL CITY RESIDENTIAL BUILDING – 50MVA IDT’s, 500KVA ET’s make BEST Turkey. Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing and commissioning of DEWA CE/288A/2006 132/11KV Substation MANAMA ROAD – 50MVA IDT’s, 500KVA ET’s make BEST Turkey. Through EMIRATES ELECTRICAL ENGINEERING LLC Dubai-UAE
- Responsible for testing and commissioning of DEWACE/288A/2006, CE/107D/2006, NAS/A608/2006, CE/448C/2007 Contracts of 132/11 KV Substations Indoor Distribution Transformer 50 MVA, Earthing Transformer 500KVA and REACTOR 10&15 MVAR