With over 27 years of international construction experience across Pakistan, Qatar, and the UAE, this professional excels in sustainable construction and project management. Expertise includes sustainable building practices, LEED-certified projects, and innovative construction technologies. A strong academic background complements practical skills in construction materials management, stakeholder coordination, and risk management. Proficient in both qualitative and quantitative research methods, with published works and a book to their name. Career goals include advancing sustainable development within the construction industry while leveraging extensive experience in civil engineering and project management.
Driven project engineer with focus on delivering innovative solutions in complex engineering projects. Skilled in managing multidisciplinary teams and ensuring project completion within scope and budget. Capable of identifying potential risks and implementing effective mitigations to ensure seamless project execution.
Work history
Doctoral Researcher
2 Years 6 Months
Universiti Sains Malaysia | George Town, Malaysia | 2024.02 - Current
Doctoral research investigated challenges affecting the adoption and implementation of sustainable construction materials in building construction projects in the UAE.
Key research activities
Systematic review of international literature on sustainable construction materials and construction project management.
Review and synthesis of research covering sustainable construction practices across different geographical contexts.
Qualitative site observations of building construction projects in the UAE.
Semi-structured expert interviews with construction professionals.
Questionnaire-based quantitative research.
Statistical analysis using Partial Least Squares Structural Equation Modelling (PLS-SEM).
Application of SmartPLS for structural model analysis.
Application of NVivo for qualitative/thematic analysis.
Investigation of cost, schedule, procurement and stakeholder management challenges.
Analysis of sustainable construction material adoption practices.
Development of evidence-based recommendations for improving sustainable construction material implementation.
Project Engineer
6 Years 1 Month
University of Sharjah | Sharjah, United Arab Emirates | 2020.07 - Current
Managed and coordinated civil engineering and construction activities within the university environment.
Coordinated project requirements across consultants, contractors, university stakeholders, and project teams.
Monitored construction activities, project progress, quality standards, and technical compliance.
Reviewed engineering and construction documentation and coordinated technical issue resolution.
Supported project planning, implementation, monitoring, and reporting tasks.
Applied practical construction and project management experience to institutional building projects.
Contributed practical industry experience to the university’s construction and project environment.
Developed academic research capability alongside professional responsibilities during doctoral study.
Conducted research into sustainable construction materials for UAE building projects.
Developed qualitative and quantitative research methods using interviews, observations, surveys, and PLS-SEM.
Published 5 research articles during doctoral research.
Authored 1 book on sustainable construction materials and project management.
Civil Engineer / Project Engineer
3 Years
CRC Contracting | Dubai, United Arab Emirates | 2017.06 - 2020.06
Worked on construction activities for major educational facility projects daily.
Supported LEED Gold certification by coordinating sustainability requirements throughout delivery.
Coordinated civil engineering and construction tasks with key project stakeholders onsite.
Monitored construction progress against quality and technical requirements consistently.
Supported coordination between contractor, consultants, and other project participants daily.
Worked on construction of a 50-storey high-rise building programme.
Participated in civil engineering and construction activities for high-rise delivery.
Coordinated site activities and monitored construction progress across multiple trades.
Supported technical coordination and resolved site-related issues promptly.
Worked with multidisciplinary project teams to meet project requirements throughout builds.
Executed stringent quality control measures for major project outcomes.
Monitored construction work regularly to maintain high-quality standards at all times.
Maintained health and safety regulations adherence during all site activities.
Facilitated efficient project completion by coordinating with teams and stakeholders continuously.
Visited sites to review progress and drive process improvements.
Oversaw quality control checks for construction teams against project specifications.
Inspected completed civil works and documented safety and compliance findings.
Civil Engineer
1 Year 8 Months
Al Gurg Consultant | Dubai, United Arab Emirates | 2015.10 - 2017.06
Supervised works on a major government building project throughout construction phases.
Coordinated technical tasks across contractors, consultants, and site teams daily.
Checked construction quality against specifications, audits, and regulatory compliance requirements.
Site Engineer
8 Years 4 Months
Freyssinet Middle East LLC | Dubai, United Arab Emirates | 2007.05 - 2015.09
Coordinated post-tensioning and structural concrete tasks across daily site operations.
Supervised site activities for post-tensioned concrete structural work.
Coordinated site teams, engineers, consultants, and contractors on technical requirements.
Inspected construction work for quality checks and technical compliance.
Supported planning and on-site execution of post-tensioning activities.
Applied structural and concrete construction knowledge to manage site delivery.
Worked with multidisciplinary teams on major building projects across the UAE.
Managed project timelines to complete site tasks on schedule.
Precast Production Manager
2 Years 1 Month
Redco International | Doha, Qatar | 2005.03 - 2007.04
Managed precast concrete production activities associated with the Lusail Development Project.
Coordinated production planning, material requirements, manpower and production activities.
Monitored quality and production schedules.
Coordinated between production teams, site teams and project management.
Developed substantial experience in precast concrete technology, production management and construction material control.
Managed production activities with emphasis on quality, productivity and timely delivery.
Lusail Development Project, Qatar
Ensured quality control by rigorous testing procedures.
Complied with all industry regulations, ensuring legal operations.
Streamlined production processes to enhance efficiency.
Maintained machinery health with regular preventative maintenance checks.
Developed strong vendor relationships for better negotiation power.
Fostered a positive work environment through effective leadership.
Optimised inventory control with accurate forecasting.
Managed project timelines for successful product delivery.
Overcame production challenges by strategic problem-solving methods.
Reduced waste generation by promoting recycling initiatives.
Developed production plans covering schedules, quality goals and labour requirements.
Defined manufacturing quality guidelines and criteria to adhere to company standards.
Enforced health and safety requirements for worker protection, keeping accidents and company liability at minimum.
Negotiated rates with suppliers and managed relations to maintain adequate levels of quality supplies.
Civil Engineer / Site Engineer
5 Years 7 Months
Mughal Construction Company | Islamabad, Pakistan | 1999.07 - 2005.02
Supported construction of major five-star hotel development in Islamabad.
Supervised civil works on-site and coordinated project activities.
Monitored construction progress against quality requirements and documentation standards.
Coordinated site tasks with contractors, engineers, and project stakeholders.
Built foundations in structural works, materials, and day-to-day site management.
Planned and tracked execution steps for construction projects.
Managed resources efficiently to minimise waste during construction processes.
Developed detailed project schedules to support progress tracking.
Applied stringent quality control to deliver superior construction outcomes.
Skills
Sustainable Construction and Sustainable Building Practices
Sustainable Construction Materials
Construction Project Management
Green and Sustainable Buildings
Sustainable Construction
Sustainable Building Materials
Construction Site Management
Building Construction
High-Rise Building Construction
Precast Concrete
Post-Tensioned Structures
Mass Concrete
Structural and Civil Works
Construction Supervision
More than 27 years of international construction experience.
Experience with LEED Platinum and LEED Gold certified projects.
Microsoft Project
Education
Doctor of Philosophy - Project Management
Universiti Sains Malaysia (USM) | Malaysia | Feb 2026
Doctoral Research: Challenges in Sustainable Construction Materials in Building Construction Projects in the United Arab Emirates
Research examined the current adoption and implementation of sustainable construction materials in UAE building projects, investigated project management-related challenges affecting their use, and developed evidence-based recommendations for improving sustainable construction material adoption.
Research areas: Sustainable construction materials, construction project management, cost management, schedule management, procurement management, stakeholder management, construction sustainability and empirical research.
Master of Science - Project Management
SZABIST University | Pakistan | 2022.11 - 2024.02
Distinction: Gold Medal
Bachelor of Science - Civil Engineering
University of Engineering And Technology (UET) | Taxila, Pakistan | 1994.03 - 1999.03
LANGUAGES
English: Proficient
Urdu: Native
REFERENCES
MD SAYUTI, BIN ISHAK, Senior Lecturer, Universiti Sains Malaysia, PhD Supervisor, Malaysia, Further references can be provided upon request.
Affiliations
Pakistan Engineering Council
Certified Project Management Professional
PUBLICATIONS
Peer-Reviewed Research Articles
Author of five research articles published during doctoral research.
1. Effects of Project Management Challenges on the Use of Sustainable Construction Materials: Evidence from Construction Industry Practitioners Civil and Environmental Engineering, vol. 22, no. 1, University of Žilina, 2026, pp. 141-160. https://doi.org/10.2478/cee-2026-0010
2. Integrating Sustainable Materials in UAE Construction: Addressing Socio-Economic, Regulatory, and Technical Barriers through Qualitative Insights Civil and Environmental Engineering, vol. 22, no. 1, University of Žilina, 2026, pp. 1-15. https://doi.org/10.2478/cee-2026-0001
3. Trends and features in sustainable construction materials; a global review Archives of Civil Engineering, vol. 72, no. 2, June 2026, pp. 67-77, https://doi.org/10.24425/ace.2026.158594
4. Challenges in implementing sustainable construction materials: insights from site observation reports across multiple construction projects in the United Arab Emirates IOP Conference Series: Earth and Environmental Science 2025, 1516(1), 012011. https://doi.org/10.1088/1755-1315/1516/1/012011
5. Sustainable building construction materials in the United Arab Emirates: a review Sustainability 2024, 16(15), 6565; https://doi.org/10.3390/su16156565.
6. Factors Affecting Quality in the Design Phase: An Evidence from the Construction Industry in United Arab Emirates Journal of Policy Research 2023, vol. 9(3), 154–159. https://jprpk.com/index.php/jpr/article/view/410
BOOK
Guide to Sustainable Construction Materials USAS Press Publisher Universiti Sultan Azlan Shah 33000 Bukit Chandan Kuala Kangsar, Perak, Malaysia, June 2026, ISBN: 9786297908021
The book addresses principles, applications and strategies associated with sustainable construction materials, including sustainable material selection, life-cycle considerations, procurement and supply-chain issues, construction practices and future directions.
SELECTED RESEARCH FINDINGS / AREAS OF EXPERTISE
Doctoral research provided empirical insights into:
Current sustainable construction material practices in UAE building projects.
Factors influencing sustainable construction material adoption.
Cost-related barriers to sustainable construction materials.
Schedule-related challenges.
Procurement and supply-chain challenges.
Stakeholder-related issues.
Availability and supply of sustainable construction materials.
Environmental and energy-efficiency practices.
Construction waste management.
Green building practices.
Sustainable material selection criteria.
Regulatory and certification requirements.
Implications of sustainable materials for construction project management.
SELECTED PROJECT EXPERIENCE
Project Location Role Key Experience
Five-Star Hotel Islamabad, Pakistan Civil/Site Engineer Building construction and site management
Lusail Development Qatar Precast Production Manager Precast production and material management
Major UAE Building Projects Dubai, UAE Site Engineer Post-tensioning and structural construction
Ministry of Environment and Climate Change Dubai, UAE Civil Engineer Government building; LEED Platinum
Full timePart timeContract workGig workConsultingVolunteerSeasonal work
Location preference
On-site
Location:
New zelandGermanySwedenUnited States of AmericaEurpoe
Open to relocation:
Yes
Salary range
47000/yr - 200000/yr
Important to me
Career advancementPersonal development programmesCompany cultureWork-life balanceHealthcare benefitsPaid time offFlexible work hoursWorking remotely optionPaid sick leaveTeam building / company retreats4-day work week401k matchStock options / equity / profit sharing
Project Manager and Post-doctoral Researcher at INM - Leibniz-Institut für Neue Materialien gGMBHProject Manager and Post-doctoral Researcher at INM - Leibniz-Institut für Neue Materialien gGMBH