Summary
Overview
Work history
Education
Skills
Languages
Personal Information
Custom
Timeline
Generic
KUMARAVEL PALAVESAM

KUMARAVEL PALAVESAM

Radhapuram,India

Summary

An accomplished senior project engineer with 22 years of cumulative experience in engineering, construction, project management, and maintenance. Orchestrated all-important activities from
planning, scheduling, execution, project control, materials, and man management, and project handover of successfully executing projects within time deadlines and budgetary constraints. History of consistently meeting quality, safety, and production requirements in all projects
executed to date. Proven ability to face challenges head-on and execute sound decisions while implementing projects dynamic leader and mentor, able to build team cohesion and inspire team members to strive towards ever higher levels of achievement.

Overview

24
24
years of professional experience
8
8
years of post-secondary education

Work history

Sr.Project Engineer MEP

Consolidated Contractor Company
Riyadh, Saudi Arabia
2014.04 - Current
  • Successful completion of 2000mm Dia. Pressurized CS Pipe (feeding to Riyadh City) shutdown & rerouting within 4 days' time period.
  • Successful completion of (Installation, Hydro testing and flushing) 120km fire main network along the track way including 2100 Track Side FHC, 700 Supervisory type Butterfly valves, 200 Air Release Valve
  • Installation and Progress Monitoring of 40-ton HVAC Ducting Work for the workshop building, Stabling building, TPSS, and Security Building in Depot
  • Submission of 500 IRN Package to the T&C team and Get Approval from the Client to start the T&C activity
  • Monitoring fire detection and alarm system subcontractor for the installation and testing progress.
  • Following with Electrical team for the cable tray, cable pulling, Panel Board and testing activity.
  • Coordinate with T&C team for the Commissioning and system operation schedule to achieve the milestone.
  • Completing FLS (Fire and Life Safety) walk down with Client approved third party and obtain completion certificate.
  • Completing Milestone Handover walk-downs with client and third-party maintenance team and handover the system under maintenace period.
  • Normalizing system with Auto mode Operation.
  • Execution of Tunnel, Viaduct and At-Grade track side MEP system.
  • Execution of Surface station, DUG station and Depot MEP system.

Sr. Section Engineer Mechanical

Consolidated Contractor Company
Turkmenistan, Turkmenistan
2013.01 - 2013.10
  • Executed comprehensive project plans for successful completion within agreed timelines from finger-1 to finger-4
  • Preparation and controlling of daily / Weekly/ Monthly execution plan
  • In charge of pipe rack and Sulphur recovery unit with fabrication and erection of CS, NACE, LTCS, SS, and Jacketed piping
  • Scheduling of NDT testing for the fabricated and erected lines.
  • Review and close the punch list items and release test packs for hydro/Pneumatic testing
  • Preparation of schedule for various Mechanical testing within the time deadline.
  • Coordinate with client for the system completion walk-downs.
  • Documented daily progress, incidents and issue resolutions for accurate site records.

Section Engineer Mechanical

Consolidated Contractors Company
Qatar/Ras Laffan, Qatar
2012.08 - 2012.12
  • Preparation of Installation and shutdown procedure for piping erection activities
  • Preparation of blinding list for the shutdown activities and getting approval from the client
  • Preparation of MAR (Material Approval Request) and submit to the client for approval
  • Prepare MTO for the issued drawing and send it to procurement
  • Involved in the Preparation of shop drawings and getting them approved by the client
  • Preparation and schedule for various Mechanical testing within the time deadline.

Section Engineer Mechanical

Consolidated Contractor Company
Qatar/Ras Laffan, Qatar
2009.09 - 2012.08
  • Preparation of daily/weekly/monthly execution plan in coordination with Project planning team and handover to site team for progress monitoring
  • Facilitated productive client meetings ensuring clear communication of complex technical concepts.
  • Execution of underground and above-ground fire main line, Industrial water line, Potable water line sewage line along with their accessories around 20 KM
  • Attending work completion walkthroughs, and coordination with certification discipline for Mechanical completion certifications
  • Coordinate with the subcontractor team for the fabrication and erection of 6500 cubic meters of two water tanks and 200 cubic meters of three diesel tanks
  • Preparation of Pre-commissioning and commissioning procedures for the mechanical systems.

Sr. Mechanical Engineer

Consolidated Contractor Company
Qatar/Ras Laffan, Qatar
2006.04 - 2009.09
  • In charge of fabrication shop, pipe rack, and process area for piping and support installation activity
  • In charge of the high frequency bending machine from 2 inches to 12 inches for all materials
  • Supervision of Prefabrication CS material from 2" to 114" piping (Seam, Seamless, Jacketed, Spiral & heavy wall) pipe spools, CS NACE, LTCS, ALLOY STEEL, SS, etc
  • Field Execution of 114"Dia carbon steel underground above-ground pipelines for fresh cooling water, Process, SRU, and utility for trains 4, 5, and 6&7
  • Surveying /laying, Fabrication, and welding, of the lines
  • Coordinating with the client for QA/QC checks and spool release
  • Preparation of NDT Testing (Radiographic, MPI, and ultrasonic) as per the Inspection Test Plan
  • Preparation of a lookahead plan and coordination with the planning department for the actual status.

Mechanical Engineer

MINIMAX INTERNATIONAL GMbH
India/Mumbai
2005.03 - 2006.04
  • Design and execution of Fire Water line, Foam line, Co2 line, Hydrant line, Sprinkler line, and Firefighting equipment.

Mechanical Engineer

MESTO MINERALS
India/Mumbai
2003.08 - 2005.03
  • Fabrication and Erection of Fire Water piping including Fire water System Equipment Erection.

Mechanical Engineer

M/s UNIVERSAL UNOVATORS
India/ Andhra Pradesh
2000.12 - 2003.07
  • Design, Fabrication and Erection of Stone Crusher plant.

Education

BACHELOR OF ENGINEERING (MECHANICAL) - Mechanical

Manonmaniam Sundaranar University
India
1996.07 - 2000.11

M.TECH. DATA SCIENCE & ENGINEERING - Data Science

BITS PILANI
India
2021.09 - 2023.10

Indian Institute of Technology (IIT Mumbai) -

2005.05 - 2005.05

Post Graduate Diploma in Data Scientist - undefined

Carrera
2019.09 - 2021.05

SCADA & PLC Programming - undefined

Innovative Solution India
2003.06 - 2003.05

Skills

  • Microsoft Office
  • AutoCAD
  • MS Project
  • Primavera P6
  • Piping Engineering

Languages

English
Fluent
Tamil
Native
Hindi
Fluent
Arabic
Intermediate
Malayalam
Advanced

Personal Information

  • Place of birth: Tirunelveli
  • Date of birth: 04/24/77
  • Gender: Male
  • Nationality: India
  • Marital status: Married

Custom

Carrom board, listen to music, watching movie.

Timeline

M.TECH. DATA SCIENCE & ENGINEERING - Data Science

BITS PILANI
2021.09 - 2023.10

Post Graduate Diploma in Data Scientist - undefined

Carrera
2019.09 - 2021.05

Sr.Project Engineer MEP

Consolidated Contractor Company
2014.04 - Current

Sr. Section Engineer Mechanical

Consolidated Contractor Company
2013.01 - 2013.10

Section Engineer Mechanical

Consolidated Contractors Company
2012.08 - 2012.12

Section Engineer Mechanical

Consolidated Contractor Company
2009.09 - 2012.08

Sr. Mechanical Engineer

Consolidated Contractor Company
2006.04 - 2009.09

Indian Institute of Technology (IIT Mumbai) -

2005.05 - 2005.05

Mechanical Engineer

MINIMAX INTERNATIONAL GMbH
2005.03 - 2006.04

Mechanical Engineer

MESTO MINERALS
2003.08 - 2005.03

SCADA & PLC Programming - undefined

Innovative Solution India
2003.06 - 2003.05

Mechanical Engineer

M/s UNIVERSAL UNOVATORS
2000.12 - 2003.07

BACHELOR OF ENGINEERING (MECHANICAL) - Mechanical

Manonmaniam Sundaranar University
1996.07 - 2000.11
KUMARAVEL PALAVESAM