Mahmood Akhter Kidwai

Mahmood Akhter Kidwai

Riyadh

Summary

Mahmood has extensive experience in Tunnels, Underground structures, Geotechnical, Instrumentation & Monitoring as well as all the others related works with respect to Construction management/Project Management and Construction Supervision. Mahmood is a competent professional with more than 26 years of experience out of those 13 years in the Middle east including 8 years in KSA in addition to valuable experience in India in major projects. He worked on various infrastructure projects involving Geotechnical works, Tunnelling works, Underground works and design review as well as construction supervision. He has led a team of Managers, Engineers, and other support staff for successful delivery of the projects with high standards of safety and quality.

Overview

2025
2025
years of professional experience

Work History

Management

WSP
  • Office Consultant (PMOC) for the phase 1 of MPTP (Makkah Public
  • Transport Programme)
  • Makkah Metro Network consist of four lines namely Line A, Line B, Line C & Line D, these lines will be constructed in three phases
  • Phase 1 is around 46 Km and consist of part of Line B & Line C
  • Metro Civil works are divided in two sections, as Section 1 is 26 Km (mostly underground) and Section 2 is 20 Km (elevated section)
  • There will be one depot and OCC for both the metro line
  • Makkah Bus Network consist of 12 Routes of around 400 Km including the 7 BRT,5 locals’ routes, 7 foot over bridges, 400 bus shelters, Bus terminals and a Bus Depot with 400 standards and articulated buses
  • Pre-Bid phase: Preliminary Design review of underground structure (including Stations and Tunnel), Geotechnical factual & Interpretative Report
  • Review of ‘general conditions’ as per FIDIC yellow book as well as ‘Particular conditions’ i.e., addendums and additions to such general conditions
  • Packaging the complete preliminary design and Contract
  • Documents package to form the tender, Pre bid meetings/workshops with the tenderers for contractual and design update/clarifications
  • Pretender clarifications
  • Bidding Phase: Technical Review of all bids, post tender clarifications, negotiations and value engineering meetings
  • Metro Rail Project: Design review meeting with the designer, contractor and consultant
  • Coordination and follow up with clients and related local authorities Design review of underground metro stations and cut & cover tunnel with an emphasis on Geotechnical, Tunnel & Station space proofing, , architectural, MEP interface ensuring that design is in compliance with the latest Codes, standards, Employers requirements and best international practices
  • Review of request for information (RFI), Design workshops for discussing and resolving the important and critical design issues
  • Bus Network: Review of Lay out drawings, shop & land scaping drawings, design submissions and Earthwork & levelling plan
  • Review of Foot over bridges drawings, Utility diversion drawings, Detour plan (Road diversion) etc
  • Review of Method of Statements e.g., Geotechnical Works, Blasting Work, Earthwork and backfilling
  • Supervised and monitored the field Geotechnical Investigation work and random visit to Geo Technical Company Laboratory to audit the quality of laboratory testing
  • Reviewed Environmental Management Plan, Environmental Impact Assessment Report, Waste
  • Management Plan and kept track on the implementation of Environmental and Waste Management Plan
  • Interfacing with the operation team, Bus team, MEP team, IT team, clients etc
  • Attending, chairing and preparation of minutes of meetings (MoM) of weekly project meetings
  • Review and verify the Contractor’s daily reports for progress, safety, quality and the resources (labour, equipment and materials).

Construction Manager

Chennai Metro Rail

Engineering Manager/Tunnels Expert

WSP
06.2023 - Current
  • Mahmood has extensive experience in Tunnels, Underground structures, Geotechnical, Instrumentation &
  • Monitoring as well as all the others related works with respect to Construction management/Project
  • Management and Construction Supervision
  • Mahmood is a competent professional with more than 26 years of experience out of those 13 years in the Middle east including 8 years in KSA in addition to valuable experience in
  • India in major projects
  • He worked on various infrastructure projects involving Geotechnical works, Tunnelling works, Underground works and design review as well as construction supervision
  • He has led a team of
  • Managers, Engineers, and other support staff for successful delivery of the projects with high standards of safety and quality
  • He worked in many projects focused on:
  • Detailed geotechnical investigations including managing and monitoring test results of both Lab and Field tests
  • Drilling and concreting of different diameters and lengths of Pile foundation for bridges, viaduct and buildings
  • Tunnel in soft ground, hard rock as well as in mixed ground condition
  • Successful completion of tunnel-by-Tunnel Boring Machines (TBM), New Austrian Tunneling Method (NATM) and by Cut & Cover (C&C) methods
  • Tunneling as well as deep excavation by using control blasting
  • Slope stability during deep excavation in soil/rock by soil nailing/rock bolting and shotcrete
  • Construction Supervision of underground station by Bottom up, Top Down and Mined method
  • Design review, review of Method of statements, Risk & Hazard Analysis, Project Management Plans etc
  • Tendering process including formation of tenders, pre bid meetings, pretender and post tender clarifications, tender evaluation, workshops ,negotiation ,contract award, notice to proceed etc
  • Using ASTM, AASHTO, BS, ISO and Saudi Building Code
  • Earth works, backfilling and leveling by proper compaction in layers of subbase and sub grade
  • Metro Rail, Underground, Tunnel, Highway, Underpass, Rail/Road over bridges etc
  • Mahmood has a proven track record in the successful execution of various projects from its inception to completion stage including the defects liability period and its maintenance
  • He has an excellent understanding of the general conditions of the contracts (FIDIC 99), specifications and special provision and standard specification for roadways, infrastructures, buildings etc
  • Mahmood worked in four (4) Design & Built Metro rail projects and served in Operation and Maintenance (O&M) of one of the Metro Rail Project
  • He is experienced in contractual & technical issues, claims negotiation and contract negotiations based on Contract Document
  • Duration
  • Sports Boulevard Project, Riyadh- KSA
  • Construction of two underpass
  • Engineering

Manager/Tunnels Expert

06.2023 - Current
  • WSP is PMCM for package 6, 8 & 9 of the Sports Boulevard Project
  • The project scope includes a total length of 135 km in
  • Riyadh
  • It is mainly a large urban redevelopment project in the central area with more restricted development areas in the wadis
  • In the central area most of the existing infrastructure and road network systems are to be modified / adapted while in the wadis a cycling / pedestrian network is incorporated with several supporting facilities
  • The project also includes pedestrian bicycle accessibility structures such as cycling bridges, recreation and entertainment based social infrastructure as well as vehicular under / overpasses
  • Scope includes the redesign of the current at-grade intersection between MBS Road and King Abdulaziz Road (and replace with underpass of 33.60m wide and 377m long) and similarly between MBS Road and Abu Bakr Road (and replace with underpass of 33.60m wide and 234m long)
  • These underpasses cross under the existing metro station
  • Currently, King
  • Abdulaziz Rd has dual carriageway with two/three lanes in each direction and 2-lanes service roads at both sides
  • Structural design also includes the retaining walls along the ramps at both sides of the fully covered section, as well as a stormwater tank located at the low point of the vertical alignment
  • The design includes MEP and safety facilities like ventilation, firefighting systems, stormwater pump station, lighting, etc., as per the local and international applicable standards
  • Managing and leading the technical team of Civil, Architectural, Electrical, Traffic and Utility departments
  • Interacting with client, contractor and Stakeholders
  • Managing the review of the contractor technical submissions
  • Holding meeting with Contractor and Clients and preparing MOMs
  • Coordination and follow up with contractors.

Engineering Manager/Tunnels

WSP
06.2023 - Current

Facility Manager

SYSTRA, Egis Rail, Mugaddassah
10.2019 - 06.2023
  • Project Title Client Location Duration
  • Mashaaer, Makkah- KSA
  • Infrastructure and, Makkah Region
  • Development
  • Authority (MRDA, / Saudi
  • Railway Company

Infrastructure and Facility Manager

WSP, Parsons Brinckerhoff
01.2019 - 06.2023

Consultant

01.2019 - 06.2019
  • Systra-Egis JV is Programme Management Office, (PMOC) for the Operation and Maintenance of Mashaaer
  • Mugaddassah Metro line, Makkah
  • This Metro is the highest capacity of any metro in the world, it operates during the annual pilgrimage of Hajj, and is used as an exclusive shuttle train for pilgrims between holy sites in Makkah, Mount Arafat
  • Muzdalifah and Mina to reduce congestion caused by thousands of buses and cars during the Hajj
  • This Metro is in operation since 2010
  • This Metro is unique in the world in term of its movement of the train and crowd management
  • Mashaaer Metro
  • Network consist of around 19 Km, Depot, Sub-Stations, EEPs and 9 stations
  • Managing and leading the Civil, Architectural, Electrical, Firefighting, MEP departments
  • Interacting with different Service Providers and their consultants for the work related to O&M
  • Reviewing the contractor proposals for upgradation or obsolete systems
  • Participating in workshop/meetings with different stake holders
  • Overviewed the process of preventive maintenance and corrective maintenance of Railway infrastructure; Via Duct, Piers and bearing pads in elevated stations and at grade stations
  • Supervise the maintenance activities of Railway facilities, stations, Platform fabric membranes, Lift & Escalators
  • Firefighting works, STP (Sewage treatment Plant) and building and stabling shed waterproofing works
  • Coordinating the interface between railway system maintenance and railway civil maintenance team
  • Preparing technical requirements and general requirements for preparation of new projects tender
  • Coordination and follow up with clients and related local authorities.

WSP, Parsons Brinckerhoff
01.2013 - 01.2019
  • KSA
  • Tunnel &
  • Underground

Expert/ Senior, Tunnel Engineer

Makkah Mass Rail
01.2013 - 01.2019

Tunnel and Underground

Middle
01.2013 - 01.2019

Construction Manager

Gammon India Limited
01.2011 - 01.2013

Geo technical

Chennai Metro, Rail Corporation
01.2011 - 01.2013
  • Gammon’s scope was design and built of seven under ground stations and its associated twin tunnel of 8.1 kilometers
  • This stretch is known as package UAA-02 & UAA-03 that’s start from Govt state station to Saidapet Ramp
  • It includes construction of 2 station boxes by bottom-up method, 5 station boxes by top-down method, cut & cover tunnel and a ramp section including the Tunnel shaft
  • Twin bored tunnel of 5.8 m internal diameter
  • Responsible for overseeing the project through leading, organizing and managing the site team of Station managers
  • Engineers and other support staff for construction of the temporary and permanent structural work of Metro station
  • Tunnel & ramp
  • Liaising and interacting directly with consultants, client and stakeholders for technical clarifications
  • Attending weekly progress, design review and safety meeting with clients & consultants
  • Responsible for design coordination with the designer and interfacing with other disciplines
  • Review of Preliminary design drawings (PD), detail design drawings (DD) and construction reference drawings (CRD), method of statements, work procedure and shop drawings for constructability point of view
  • Managed the different agency to carryout detailed Geo-technical investigation work and supervised the existing building survey (EBS) work for entire package and reviewing damage assessment report
  • Managed the different agency for Installation & Monitoring of instrumentation to check impact of tunneling deep excavation and dewatering activity on adjoining ground & existing structures
  • Responsible for construction of station box using retaining wall system of Diaphragm wall, Sheet piling etc., other temporary works includes king post, sturts, dewatering, Waterproofing, base slab, roof slab etc.

Engineer/, Assistant Resident Engineer

Systra, Dubai Metro, RTA, Road
01.2006 - 01.2011

Structural Engineer/Assistant Resident Engineer

Transport Authority
01.2006 - 01.2011
  • Dubai Metro Rail Project consists of design and build of two railway lines i.e., red line and green line with a total of 75.6 kilometers
  • The Red Line covers 52.9 km in length from Rashidya to Jebel Ali Port having 29 stations including 4 underground station and 3.6 km tunnel and whereas green Line covers 22.7 km and extends from the Al Qusais to Creek having 18 stations including 8 underground station and 6.09 km tunnel, for this design and build of EPC infrastructure contractor
  • Projects management and construction management of Metro projects:
  • Managed the design department: compiling the design and construction plans, BOQ as per the Contract Document
  • As a member of Engineer’s Team, I used to check contractor’s work quality, safety standard and progress record on a day- to-day basis
  • Reviewing of submitted method of statements, work procedure and shop drawings and highlighting comments for final approval of the same
  • Supervision of Tunnel shaft preparation, Transportation & Assembling of Tunnel boring machine (TBM), TBM launching & breakthrough
  • Responsible for reviewing the geotechnical interpretation and calculated face pressure to decide the advancement of TBM drive modes
  • Construction supervision of ten bored tunnel, two of the tunnels bored below the Dubai creek
  • Construction supervision of 6 Annex structure & 12 adits (By NATM method i.e., New Austrian Tunneling Method)
  • Instrumentation & Monitoring of the existing structures and roads during the Initial drive & main drive of tunnel
  • Participating in meetings with contractor & clients to discuss daily issues and to ensure compliance of contractor resources as per the planned program
  • Reporting to Resident Engineer on daily basis about quality and safety issues of various sites and preparation & submitting of daily/weekly reports and record
  • Reviewing of as built drawings and giving comments to contractor to incorporate it for final submission
  • Carrying out inspection with contractor to generate punch list and closing of the same after the rectification work.

Structural Engineer / Assistant, Resident Engineer

Systra, JV, Parsons
01.2006 - 01.2011

Rail India Technical & Economical Services Ltd, RITES Ltd
07.2006 - 10.2006
  • Nineteen nos
  • Of Rail over bridge in state

Assistant Manager

Punjab
07.2006 - 10.2006
  • Supervised the Geo-technical investigation of nineteen number of Rail over Bridge (ROB) sites, detail estimate of ROB and making of tender document, selection of contactors through opening of bid and recommending the suitable contractor to client.

Assistant Manager

Rail India Technical and Economical
01.2006 - 01.2006

Project Senior Section, Engineer /, Assistant Resident Engineer

Rail India Technical & Economical Services Ltd, RITES Ltd, Delhi Metro Rail
01.2001 - 01.2006
  • Under Ministry of Railways, Government of India) (Joint Venture with PC-Japan, PB-USA, TONICHI-Japan, JARTS-Japan) from

Delhi Metro Rail
01.2001 - 01.2006
  • This project involved construction of a Mass Rapid Transit Railway system, Delhi, India
  • This was one of the largest infrastructure projects for Metro Railway in India, costing Rs
  • 1800 Crore consist of 6.5 km of tunneling and 6 under ground stations
  • Being a member of Consulting Engineer’s Team, monitored contractor’s work quality, safety standard and progress record along with preparation of check list, reports and record in an MNC environment
  • Supervision of Utility diversion before and after the construction of metro station that’s include different size of water pipeline, sewer line and electrical utilities i.e., high tension & low-tension power cable
  • Construction supervision of road restoration (new road)as well restoration of median , land scaping etc
  • Monitoring of all activities from Geo-technical investigation to temporary retaining structures such as Sheet pile
  • Diaphragm wall, Soldier pile and timber lagging, Plunge column, secant piling, king pile, , strutting , base slab, concourse slab and top slab
  • Deep excavation in soil/rock by stabilizing the slopes by using soil nailing/ rock bolting, shotcreting etc
  • Construction supervision of one of the most critical and challenging station of Delhi Metro, where construction of station building is being carried with two shafts by top-down method and connecting them with tunnel by NATM (New Austrian
  • Tunneling Method)method
  • Under pinning of surrounded century old structures and sinking of 16 no column shafts & D- wall up to 32 meters for facilitating top-down construction work
  • Construction supervision of TBM shaft and three under ground stations box in alluvium soil and hard Quartz tic rock by cut and cover method
  • Construction supervision of twin tunnels each 1150 m by TBM(Tunnel Boring Machine), 879 m by EPBM(Earth pressure balance machine) and 288 m by NATM (New Austrian Tunneling Method)and construction of pilot tunnel & cross passages.

Senior section Engineer /, Assistant Resident Engineer

Rail India Technical and Economical
01.2001 - 01.2006

Geotech Consultants Pvt. Ltd
01.1998 - 01.2001

Senior Project Engineer

Authority, Power Grid, Indian Oil
01.1998 - 01.2001
  • I acquired good experience of handling independently execution of different types of Pile foundation work and geotechnical works maintaining proper quality and safety with full co-ordination and confidence among clients and consultants
  • I also have a capability of good public relation and handling a team of site engineers, safety engineer and other manpower in an efficient manner, thus getting the maximum output within a fixed time frame and keeping the profit of the company in mind
  • In Delhi Metro Rail Project site, I carried out surveillance of detailed Geo-technical investigation work with observation of change of strata and proper sampling, collecting UDS, conducting SPT, falling head & constant head permeability test in soil / rock, packer test, Plate load test, preparation of bore record
  • Installation of standpipe piezometers and measurements of ground water to check the seasonal variation as well as variation of water level on daily basis during dewatering works
  • Conducting of static cone and dynamic cone penetration tests as well as ERT test to calculate the soil resistance
  • Excavation of test pits, stratification, geological mapping, soil classification, conducting CBR, modified proctor compaction test, calculation of MDD, OMC
  • Rock drilling by using double core barrel/tube, split spoon sampler
  • Calculation of RQD, SCR and TCR
  • Carried visual, water absorption, porosity, density, specific gravity, hardness, unconfined compression test and point load strength index on rock samples
  • Responsible for all Technical related matters in Geotechnical Engineering regarding In-situ and laboratory testing
  • Attending and representing the team in Technical Meetings with designers, Consultants and Clients
  • In Delhi Metro Rail Project site, I carried out the construction of more than 200 bored cast in situ piles for one of the stations & for the connecting viaduct of 4 Km
  • Carried out the Pile load test and pile integrity test on test piles as well as routine piles according to applicable code of construction
  • Carried out layout of plot boundaries, back filling and compaction of soil and fly-ash in layers, Construction of 3,200 stone columns and 260 R.C.C Pile, Water bound Macadam, construction of bored cast- in- situ R.C.C Pile and stone column, Pile load test on single and group of pile as per IS-2911-part IV, Pile integrity test for Indian Oil corporation
  • Carried out Plate load test to Calculate bearing capacity and settlement
  • Finding way for soil improvement
  • Carried out construction of R.C.C Pile up to 1.0 mt
  • Dia and 20 mt
  • Depth, Pile chipping, Construction of Pile cap, Earth works, compaction of embankment in layers formation, sub-grade layer, sub-base layer for National Highway Project on
  • NH2
  • Responsible for Bar bending schedule, planning and scheduling of piling, preparing method statement and Pile load test up to 450 MT in compression, and lateral and pull-out test for Power grid corporation of India.

Senior Project Engineer

Geotech Consultants Private Limited
01.1998 - 01.2001

Assistant Engineer

Alig Builders Pvt. Ltd
01.1995 - 01.1997
  • Various residential and commercial building

Assistant Engineer

Private Owners
01.1995 - 01.1997
  • Involved throughout the different stages of construction as project initiation, planning, monitoring during execution of various project
  • Supervision of civil works and architectural works of residential and commercial buildings and Villas
  • Carried out lay out plans of different building
  • Supporting Site Engineers, supervisor, workers for various activities like earth work, masonry work, concrete work, woodwork, plumbing & sanitary works etc
  • Monitoring of materials stocks and timely requesting for procurement & arrangement of materials & required manpower from the company
  • Checking & approving of bills submitted by vendors, labor subcontractors.

Architect

Yadav & Associates
01.1994 - 01.1995
  • Various residential and commercial building

Civil Engineer

01.1994 - 01.1995
  • I was responsible for detailed estimation of residential, commercial, villas and other building projects
  • Helping & guiding draftsman for developing detailed construction drawings as per the designer guidelines
  • Preparing detailed estimation as per the developed drawings and calculating quantity of each item to be required
  • Estimation of the concerned project with the help of current analysis of rates
  • Site visit to facilitate the construction team.

Architect, Civil Engineer

Yadav & Associates
01.1994 - 01.1995

Education

Master's degree - civil/Structural Engineering

AMU
Aligarh, U.P
01.1997

Bachelor of Science - Civil Engineering

AMU
Aligarh, U.P
01.1995

Diploma in Engineering - Civil

AMU
Aligarh, U.P
01.1988

Skills

  • Etching management
  • Trapline management
  • Disability management
  • Fitness management

Currentposition

Engineering Manager/Tunnels Expert, Sports Boulevard Project, Riyadh, KSA, 06/23 - Present

Languages

English
Hindi
Urdu

Personal Information

Nationality: Indian

Professionalmemberships

  • Saudi Council of Engineers (SCE), 171196, 01/14
  • Institution of Engineers (India), F-1264318, 01/20
  • Tunnelling Association of Canada, 001815, 01/20

Timeline

Engineering Manager/Tunnels Expert

WSP
06.2023 - Current

Manager/Tunnels Expert

06.2023 - Current

Engineering Manager/Tunnels

WSP
06.2023 - Current

Facility Manager

SYSTRA, Egis Rail, Mugaddassah
10.2019 - 06.2023

Infrastructure and Facility Manager

WSP, Parsons Brinckerhoff
01.2019 - 06.2023

Consultant

01.2019 - 06.2019

WSP, Parsons Brinckerhoff
01.2013 - 01.2019

Expert/ Senior, Tunnel Engineer

Makkah Mass Rail
01.2013 - 01.2019

Tunnel and Underground

Middle
01.2013 - 01.2019

Construction Manager

Gammon India Limited
01.2011 - 01.2013

Geo technical

Chennai Metro, Rail Corporation
01.2011 - 01.2013

Rail India Technical & Economical Services Ltd, RITES Ltd
07.2006 - 10.2006

Assistant Manager

Punjab
07.2006 - 10.2006

Engineer/, Assistant Resident Engineer

Systra, Dubai Metro, RTA, Road
01.2006 - 01.2011

Structural Engineer/Assistant Resident Engineer

Transport Authority
01.2006 - 01.2011

Structural Engineer / Assistant, Resident Engineer

Systra, JV, Parsons
01.2006 - 01.2011

Assistant Manager

Rail India Technical and Economical
01.2006 - 01.2006

Project Senior Section, Engineer /, Assistant Resident Engineer

Rail India Technical & Economical Services Ltd, RITES Ltd, Delhi Metro Rail
01.2001 - 01.2006

Delhi Metro Rail
01.2001 - 01.2006

Senior section Engineer /, Assistant Resident Engineer

Rail India Technical and Economical
01.2001 - 01.2006

Geotech Consultants Pvt. Ltd
01.1998 - 01.2001

Senior Project Engineer

Authority, Power Grid, Indian Oil
01.1998 - 01.2001

Senior Project Engineer

Geotech Consultants Private Limited
01.1998 - 01.2001

Assistant Engineer

Alig Builders Pvt. Ltd
01.1995 - 01.1997

Assistant Engineer

Private Owners
01.1995 - 01.1997

Architect

Yadav & Associates
01.1994 - 01.1995

Civil Engineer

01.1994 - 01.1995

Architect, Civil Engineer

Yadav & Associates
01.1994 - 01.1995

Bachelor of Science - Civil Engineering

AMU

Diploma in Engineering - Civil

AMU

Management

WSP

Construction Manager

Chennai Metro Rail

Master's degree - civil/Structural Engineering

AMU
Mahmood Akhter Kidwai