

I have over 15.7 years of extensive experience as an Occupational Health and Safety professional in the construction industry. I was nominated for an award for achieving a remarkable 30 million man-hours without a Lost Time Injury (LTI) on the Royal Atlantis Resort and Residential project. My work experience encompasses high-rise buildings (up to 343 meters in height), villa projects, theme parks, canal and road infrastructure, water treatment plants, and the erection of factories.
Waste to Energy, Abu Dhabi,
ALEC, Duration: Dec 2024 - Present., Consulting - Zutari, Main contractor: ALEC-KENADEVIA, Scope: The Waste-to-Energy project in Abu Dhabi, handling civil, mechanical, electrical, and environmental works for a municipal solid waste plant generating renewable energy. Oversaw installation of waste handling systems, incinerators, boilers, turbines, and flue gas treatment equipment. Implemented HSE procedures and managed high-risk activities such as working at height, hot work, confined space entry, chemical handling, critical lifting, electrical works, and excavation/trenching. Coordinated multi-disciplinary teams, ensured regulatory compliance, and supported commissioning and operational readiness.,
Sea World Abu Dhabi, Abu Dhabi, ALEC,
PMC: EllisDon, Duration: Dec 2020 to 2024., Main contractor: ALEC Engineering and Contracting LLC., Scope: The construction activities involve the creation of the largest marine life theme park in the region, which spans approximately 183,000 square meters. The park will blend real marine environments with cutting-edge attractions, thrilling rides, and educational experiences focused on marine biology and water treatment systems. The project includes entertainment engineering and themed architecture, all kinds of high-risk activities involved as along with the erection of steel structures, use of quick deck, massive size class panel installation, MEWP usage, mobile crane operation, interior work, MEP work, as well as the installation of underground water pipelines and sewage systems.,
The Royal Atlantis Resorts & Residential, Dubai,
Six Construct Co, PMC: DYNAMIC ENGINEERING CONSULTANT, Duration: Dec 2018 - Feb 2020., Main contractor: Six Construct Co., Scope: High-rise building for resort and residential, 186-meter height (45 floors), total of six luxury towers of various heights. A slipform platform was used to construct the next floor of the building. Overall activities managing include subcontractors' work, such as civil work, MEP, façade work, interior work, slipform erection and modification, steel structure erection 200 ton (beam& column) for connecting slab between towers. finishing, landscape, heavy Equipment, traffic management...,
Warner Bros (Yas Theme Park), Abu Dhabi,
Six Construct Co, PMC: LOUIS BERGER., Duration: Oct 2017 – Dec 2018, Main contractor: Six Construction Co., Scope: Installation of various types of roller coasters for a Hollywood entertainment theme park includes the erection of steel structures, CAT walk installation, roof sheet installation, MEP work, and the installation of underground gas pipelines and sewage pipes, along with legendary theme work structures.,
Dubai Canal Water Infrastructure Package-3, Dubai,
six construct co, PMC: PARSON (RTA client), Duration: Jan,2016 – oct 2017., Main contractor: six Construct Co., Scope: The project involves the development of an infrastructure canal spanning a total of 80,000 square meters for public use and marine transportation. Additionally, three iconic steel structures have been created for crossing over the canal. All activities are monitored in accordance with municipal permit documents, which cover various tasks such as excavation, mobile crane lifting heavy rocks, and the installation of sewage pipelines alongside the road. The project also includes 22 kV electrical cables, a wastewater treatment plant, electrical tunnel work, and the operation of heavy equipment.,
Al Zorah Resorts (villa project), Ajman,
PMC: NORR., Duration: May,2015 – Jan,2016., Main contractor: six construct co., Scope: Constructed 45 individual resort buildings, including oversight of all activities such as civil work, MEP work, interior finishes, glass installation, tile work, road construction, landscaping, and swimming pool installation.,
Four Season Hotel Bahrain,
Six Construct Co, PMC: COWI., Duration: May 2012 –May 2015.,
Main contractor: six Construct Co., Scope: The construction of a high-rise building, reaching 200 meters in height (48 floors), utilizes an Auto Climbing System (ACS) platform for the progression to the next deck. The overall activities being monitored include the work of subcontractors, which encompasses civil tasks such as carpentry, concrete work, scaffolding, and steel installation. Additionally, earthwork, mechanical, electrical, and plumbing (MEP) services, façade work (including cradle and monorail platforms), landscaping, interior work, finishing tasks, and traffic management are all part of the project.,
ADNOC New Corporate Headquarter, Abu Dhabi,
Six Construct Co, PMC: HILL INTERNATIONAL., Duration: Mar 2012 to may 2012., Main contractor: Six Construction Co., Scope: High-rise building construction at 343 m height (74 floors) utilised an Auto Climbing System (ACS) for its erection. Activities included civil work such as WAH, excavation, lifting, carpentry, concrete, scaffolding, and steel work, as well as MEP work, lifting, and traffic management., Factory Erection (Renault Nissan), Tamil Nadu, Arun Excello co, PMC: STAR ENGINEERING., Duration: Mar 2010 to Jan,2012., Main contractor: Arun Excello Co, Scope: Steel structure erection work for a car manufacturing company involved activities such as civil works, excavation, column and beam erection, sheet installation, and earth work moving equipment.