Significant Accomplishments:
Significant Accomplishments:
Replacement of existing DPA & DSA units. Food Container Installation, Residential Villa Project, Duct Installation in 150 Villas
Technology : Project Management, Costing, Estimation, Technical Submission and Approvals, Project Schedule, Site Layout preparations, Site Engineering, Walk-down and Meetings, Variation Quotation, As Built , Quality Control and Assurance, Testing and Commissioning, Project Handover.
Significant Accomplishments:
Proved as a successful project engineer in the allotted new area by developing a prospective, appreciable installation base and developed professional relationship with almost all of the concerned biomedical and facilities department persons in the UAE market in various prestigious healthcare organizations listed below.
Project Handled and Completed
Details: 11 TR DSA x 2 & 8.5 TR DSA x 2
The project involves the installation and design of a stairwell pressurisation system for a four story building for sukhiyo mahikari in Kochi. A 4000 CFM axial fan was installed on top of the terrace from which equal throws were given to each of the floors inside the fire exit stairwell using square patched grills.
This project introduce normal Auditorium to centralize by installing 22 TR x 2 DP Unit.