Summary
Overview
Work History
Education
Skills
Work Availability
Timeline
MEENAKSHI SUNDARAM RAMACHANDRAN

MEENAKSHI SUNDARAM RAMACHANDRAN

Sr.MEP Coordinator
Sharjah

Summary

Electrical Engineer with 17+ years of experience in the MEP Engineering and Building construction industry- Engineering, project management, project coordination, site execution and erection, Testing and commissioning ,maintenance activities during the DLP period after handing over of the project. Currently seeking a long-term challenging opportunity for making a significant contribution towards self- growth and growth of the organization by utilizing my knowledge , excellent time management and problem-solving skills.

Hardworking and passionate job seeker with strong organizational skills eager to secure Construction Manager (Electrical) position. Ready to help team achieve company goals.

Overview

18
18
years of professional experience
4
4
years of post-secondary education
1
1
Language

Work History

Snr. MEP coordinator

BESIX
Dubai
09.2021 - Current
  • Projects involved : Uptown tower,Dubai
  • Coordinate and oversight of compliance of contractors, ensuring works are carried out as per the drawings, specifications and standards, as per schedule and ensures compliance to HSE plans, quality standards and local/national regulatory requirements
  • Coordinate with contractors, engineers, clients and all other trades in all phases of the project cycle for any sites related issues/ constraints
  • Coordinate with Civil construction team to obtain the clearance before starting the
  • MEP work to ensure smooth and efficient execution of work
  • Ensure continuous construction work fronts availability through review of look ahead schedules, resource charts, engineering deliverables, material delivery schedules and any other service requirements including contractor submittal
  • Ensure required clearances and necessary permits are in place prior to the start of the specific work at site and make sure Verifies compliance with Permit and License requirements and stipulations
  • Responsible for reviewing and approving the contractor's submittal, technical queries, Field change documents and other technical documents including
  • Drawings,As-built and Operation manuals as part of close out documents
  • Provide guidance and technical advice to the sub-contractors and monitor their performance
  • Follow up the of material/Equipments with Suppliers are delivered as per the contract requirements in terms of quality and time
  • Ensure all materials and equipment on the site fully comply with Projects specification requirements
  • Prepare the weekly reports and distribute to MEP manager/ other functional departments for information and necessary action
  • Manage and supervise the daily activities of the technical team
  • Ensures the optimal usage of manpower and resources.

Snr.MEP Coordinator

Bam international
Abu Dhabi
09.2012 - 08.2021
  • Projects involved : Hazza bin zayed stadium -Phase1,Hazza bin zayed stadium - Phase 2, Al-Ain: Premier Inn Hotel, Abu dhabi;Etihad Area, Abu Dhabi.
  • Responsible for reviewing the shop drawings, construction details, product data, material samples, inspection plans, methods statements, delivery schedules to confirm compliance with the requirements of the project
  • Provide technical leadership in reviewing the contractibility of the MEP design to meet the purpose and functionality of the building to the client’s requirements
  • Lead and coordinate with daily site supervision of MEP contractor to ensure that all works at various stages of the project are in compliance with the approved shop drawings,Projects specification and authority requirements
  • VEnsure all builders works drawings are comprehensive and discussed with the various engineers for the best implementation and installation of MEP services
  • Lead and develop the logistics plan that allows the MEP contractors to complete their equipments installations are coordinated, efficient manner
  • The plan should look to mitigate the impact of the project on the surrounding neighborhoods and traffic around the site
  • Coordinate with Supply Chain to ensure on timely arrival of all HVAC,Plumping and electrical equipment at site
  • Ensure all materials and equipment on the site fully comply with Projects specification requirements
  • Supervise the production of co-ordination drawings to ensure that all the MEP services are coordinated with each other and the building structure is complying with the contract requirements
  • Lead the MEP workshop with core team and conduct day-to-day follow up including the coordination between the MEP contractors
  • Lead and facilitate the development and direction of the project improvement program, including inter- divisional dimensions Keep records of site progress in order to maintain regular/timely update to Project
  • Manager
  • Ensures that both the quality and the quantity of the jobs are in line with Service
  • Level Agreements
  • Monitors project progress to determine any delays or deviations from the project milestones Work with the Quality manager to schedule, facilitate and document all quality aspects of the electrical and mechanical equipment including any and all factory witness testing required Prepare and distribute progress reports, meeting/ workshop records and minutes of meetings (MOM)
  • Prepare the corrective actions for SOR and NCRs and monitor its implementation and also assist our MEP subcontractors to close out the documentations
  • Preparation of DLP snags logs and closely working with maintenance team\ operators to close out the snag comments
  • Lead the project close out, co-ordinates the production of as-built drawings and
  • O &M manuals to ensure they are delivered as per the contract specifications
  • VEnsure that any maintenance during the DLP period is taken care of and closed immediately

Project Electrical Engineer

BK Gulf LLC
Dubai
05.2008 - 08.2012
  • Projects involved : Hotel Crown plaza and Stay bridge, Abu Dhabi
  • Eastern Mangrove development, Abu Dhabi
  • DUTIES & RESPONSIBILITIES vPreparing the schematic diagram for the LV system
  • VLoad calculations, voltage drop calculations and preparing the load schedule
  • VPrepare and submission of LV/ELV Shop drawing such as lighting ,small power, containment layout,lightning protection,Earthing layout,Central battery , fire alarm,
  • Access control , CCTV, Telephone and data layout for consultants approval
  • VPrepare and submission of Material submittal and method statement for consultants’ approval
  • Follow-up with main contaminator/consultants for approval of shop drawings,material submittal and method statements
  • Selecting the materials and material taking off and ordering the materials based on the approved drawings
  • Material follow-up with supply chain management for a timely delivery of materials on site
  • Lead the Electrical team to install the followings; Electrical installation of HV panels, Transformer, LV panels, Capacitor Bank,SMDB and DB as per Approved drawings
  • Coordinate with ADDC for shop drawing approval and site inspection
  • Liaising and demonstrate with 3rd party FLS consultants to verify all FLS system prior to the civil defense inspection
  • Lead and manage the Testing & Commissioning of Electrical/ ELV teams to ensure timely completion and handover of the project
  • Lead and manage the submission of as-built drawings, O &M manuals, T&C reports,DLP comments close out and MEP spare parts are handed over to the Main contractor/ client/operators as per the contract specification

Electrical design Engineer

Entask Electrics P. Ltd
Chennai
09.2005 - 04.2008
  • Preparation of Load calculation
  • Selection of Transformer and DG Size
  • Preparation of Single Line Diagram
  • Preparation of cable schedule
  • Designing of Lighting and power layout
  • Designing of External cable Routing layout
  • Preparation of tender


  • PROJECT INVOLVED: Isha’s Signature Villa (Group of 120 Villas) Hansa Projects (6 Towers of Residential Apartments,5 Floors Each) Oakwood (24 Types of Residential Apartments, each will have 3 Floors) Stanz, (Information Technology Park, located

Education

Bachelor of Science - Electrical & Electronics Engineering

University of Madras, Chennai
09.1999 - 08.2003

Skills

Background in the principal and practices of Electrical and Electronics Engineer-Electrical/ELV Engineering, Designing, installation,Testing and commissioning of the systems

undefined

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Snr. MEP coordinator - BESIX
09.2021 - Current
Snr.MEP Coordinator - Bam international
09.2012 - 08.2021
Project Electrical Engineer - BK Gulf LLC
05.2008 - 08.2012
Electrical design Engineer - Entask Electrics P. Ltd
09.2005 - 04.2008
University of Madras - Bachelor of Science, Electrical & Electronics Engineering
09.1999 - 08.2003
MEENAKSHI SUNDARAM RAMACHANDRANSr.MEP Coordinator