Project: DIFS Square Commercial Building
Budget: AED 720 million
Client: Dubai International Financial Centre - DIFC
As Construction Manager for the DIFS Square development, I am responsible for leading all on-site construction activities for this prime commercial project. My focus is on ensuring structural integrity, complex MEP coordination, and delivering a shell-and-core that is ready for high-quality tenant fit-outs, all while adhering to a fast-track schedule.
Key responsibilities include:
Project: BVLGARI Lighthouse Penthouses
Budget: AED 1 billion
Client: Dubai Holding
Tasked with the construction of ultra-luxury residential penthouses, I was responsible for delivering exceptional quality and precision. The role demanded a meticulous focus on high-end finishes, custom interior details, and fulfilling the exacting standards of a premier brand like Bulgari.
Key responsibilities included:
Structural Oversight: Managed the structural phase for multiple high-rise penthouses, ensuring adherence to complex engineering designs and specifications.
Trade Coordination: Supervised structural trades, including concrete formwork crews, steel erectors, and rebar placers, to ensure seamless integration of structural systems.
Project Planning & Scheduling: Developed detailed construction schedules to coordinate the sequence of structural trades, minimizing conflicts and ensuring workflow efficiency.
Budget Management: Monitored the budget for structural materials (e.g., concrete, rebar, structural steel) and specialized labor, maintaining financial control.
Stakeholder Relations: Collaborated with project engineers and architects to resolve structural challenges and realize the project's design intent.
Quality Control: Conducted rigorous inspections of structural work, including concrete pours, formwork, and steel connections, to ensure they met all engineering standards.
Safety Management: Enforced stringent safety protocols for heavy construction activities, with a focus on fall protection, crane operations, and structural stability.
Reporting: Reported directly to the Project Director on structural progress, quality status, and any design variations impacting the building's core and shell.
Material Procurement & Approval: Reviewed and approved material submittals for structural components, including concrete mix designs and steel mill certifications.
Project: Six Senses 5-Star Luxury Hotel
Client: Select Group
As a Construction Manager at INNOVO GROUP, I am responsible for leading and overseeing the execution and delivery of construction projects, ensuring they are completed on time, within budget, and to the highest quality standards. This role involves comprehensive oversight, coordination, and communication with various managers to facilitate seamless project execution.
Key responsibilities included:
1. Project Oversight:
2. Team Coordination:
3. Project Planning & Scheduling:
4. Budget Management:
5. Client Relations:
6. Quality Control:
7. Safety Management:
8. Reporting:
9. Material Procurement & Approval:
Project: Mr.Bishoy Azmy (ASGC/INNOVO Group CEO) Villa Renovation
Client: Mr.Bishoy Azmy - CEO
Led the successful completion of the opulent Villa Renovation for ASGC CEO.
1.Coordinated with stakeholders, ensuring alignment with the luxurious design specifications.
2.Managed and oversaw all aspects of the renovation project, maintaining high quality standards
3.Executed detailed project planning, optimizing resources and adhering to project timelines.
4.Facilitated effective communication among team members to achieve project goals.
5.I effectively coordinated with various stakeholders to ensure alignment with the luxurious design specifications.
6.Responsible for managing and overseeing all aspects of the renovation project.
7.I maintained meticulous attention to high-quality standards, By executing detailed project planning, optimizing resources, and adhering to project timelines
8.I contributed to the successful realization of this prestigious project. My role also involved facilitating effective communication among team members, ensuring a collaborative and goal-oriented approach to achieve the desired outcome.
Project: MARSA AL ARAB Hotel -5-Star Luxury Hotel
Budget: AED 1.8 billion
Client: Dubai Holding
Led critical responsibilities as a Project Engineer, overseeing the intricate phases of civil work, finishing, and joinery/fit-out for the prestigious MARSA AL ARAB Hotel project:
1.Spearheaded and managed the civil work stages, ensuring precision and adherence to high quality standards.
2.Managed the finishing stage, beginning with drywall partitioning and incorporating upscale elements to align with the precise standards of a 5qstar hotel. Supervised the execution of joinery, marble and fit-out work, ensuring the seamless integration of design elements with a focus on both aesthetics and structural integrity.
3.Collaborated with diverse teams to optimize project efficiency, meeting strict timelines and budget constraints.
4.Managed and coordinated with subcontractors, ensuring the timely execution of tasks within the specified budget.
5.Demonstrated a commitment to quality control, ensuring the delivery of a luxurious and high-end hotel facility.
Project: DEWA 132 KV Substation
Budget: 50 million Dirham
Client: DEWA
Spearheaded civil work stages for the DEWA substation in Hassyan Power complex starting from mobilization work to Energization stage.
Managing the construction of a 132 KV Substation, demonstrating expertise in overseeing critical responsibilities:
1.Directed and supervised the construction and finishing stages of the substation, ensuring adherence to high-quality standards and safety protocols.
2.Executed specialized tasks including foundation design and construction, structural analysis, and equipment installation.
3.Led a multidisciplinary team in implementing effective project planning, coordinating civil work with MEP and other subcontractors to optimize project efficiency.
4.Managed comprehensive paper work, handling tasks such as subcontractor invoices, payments, and variation orders.
5.Demonstrated adeptness in direct client communication, ensuring project alignment with expectations and satisfaction.
6.Upheld a commitment to safety regulations, fostering a secure working environment.
Skills and Achievements:
1.Successfully cleared DEWA exams and attained approved engineer status from DEWA
2.Proven ability to lead and coordinate across diverse teams, optimizing project outcomes.
3.Expertise in managing intricate paperwork, ensuring smooth project administration.
4.Comprehensive understanding of safety regulations and protocols in a high-voltage substation environment.
Project: Muhamed Saif Alshafaar (ASGC owner) New Majlis
Client: Muhamed Saif Alshafaar
Overseeing the completion of the opulent new majlis for Mr. Mohamed Saif Alshafaar, our esteemed company owner. The project showcased a luxurious design with an estimated cost of 55 million dirhams.
Key Responsibilities:
1.Supervised finishing stage works, including luxury marble installation, decorative paint application, and silver-plated paint finishes, wooden cladding, GRC work for facade cladding, and aluminum work featuring a full skylight roof.
2.Demonstrated skills in direct client interaction, ensuring satisfaction and project alignment.
3.Facilitated seamless coordination between civil, MEP, and other subcontractors.
4.Proficiently managed paper work, overseeing subcontractor-related matters such as invoices, payments, and variation orders.
5.Direct client engagement, fostering positive relationships
Project: Dubai Coca-Cola Arena
Budget: 1 billion Dirham
Client: MERAAS
Spearheaded civil work stages for the Dubai Coca-Cola Arena starting from Rafting stage to MERAAS Handing over, a half-million-square-foot global events destination, overseeing a 20,000-person capacity venue with an estimated cost of 1 billion dirhams.
Civil work Stage:
1.Managed projects from inception, leading excavation, backfilling, raft works, and cast-in-situ slabs, intricately connected with facade steel structure foundations.
2.Orchestrated the execution of complex cast-in-situ core walls, coordinating with roof mega trusses, and led precast work involving fixation, alignment, grouting, and slab topping.
3.Demonstrated expertise in steel and facade work, ensuring precision and alignment in all stages.
Finishing Stage works:
1.Directed finishing stage works, encompassing normal finishing (block, plaster, tiles, false ceiling, carpet,….etc) and specialized finishes such as block with direct paint, colored screed, and screed with resin epoxy paints.
2.Managed the execution of 3 substations, LV rooms, and a full production kitchen serving 20,000 people, overseeing concrete trenches, S.O.G, finishing, facade, and louvers.
Skills and Achievements:
1.Adhered rigorously to safety instructions and regulations, ensuring a secure working environment.
2.Demonstrated awareness and implementation of QC procedures.
3.Proficient in DEWA, DCD, and DM inspections and regulations, ensuring project compliance.
Project: City walk Project
Budget: 2.5 billion Dirham
Client: MERAAS
Recognized with the Shield Award for achieving 15 million safe man-hours from the safety department upon the successful completion of City Walk.
Project: Mall of Egypt
Client : Majid Al Futtaim
Overseeing construction of the mall building:
1.Executed diverse civil engineering tasks, ensuring adherence to project specifications and timelines.
2.Collaborated with multidisciplinary teams, managed construction activities, and maintained quality standards.
3.Supervising and coordinating underground services and concrete operations throughout the entire mall site.
Junior Site Engineer for the State Security Building project (Hurghada Branch):
1.Responsible for overseeing and implementing finishing works.
2.Contribute to seamless construction activities, ensuring quality standards and project timelines are met.
As a Lab Engineer at a Ready-Mix Concrete plant, I specialized in:
1.Proficiently handling concrete designs, ensuring optimal mixtures.
2.Expertly managing the addition of additives and troubleshooting any related issues.
3.These responsibilities showcased my in-depth knowledge and skills in the field, contributing to the plant’s operational efficiency and quality control.