A professional Piping Engineer/Designer with more than
13 years of experience and expertise in the field of Proficiency in use of simulation software's like SP3D (3D scanning/FEED/As built/Detail Engg.), Spoolgen, Spool man, PDMS, AutoCAD Plant 3D, AutoCAD 3D/2D, Auto Pipe etc. Site engineering Experience on onshore and offshore as well.
EPC FOR FUJAIRAH F2 POWER AND DESALINATION PLANT
Ceramic and Uranium units
As part of the project,(Brownfield)
1. Piping Modelling as per process requirements.
2. Equipment (Reactors, Coloume, Vessels etc) Modelling on smart plants 3D by Intergraph.
5. Coordinating with other discipline such as Civil, Electrical, Instrumentation.
EPC FOR CONVERSION OF HABSHAN-3 NGI COMPRESSOR PROJECT NO.0405297
Client: ADNOC Gas Processing/ARCHIRODON (As Built with 3D scanning)
As part of the project, HP, AND LP AREA DEVELOPEMENT(Brownfield)
1. Piping Modelling as per P&ID (3D Scanning)
2. Preparation of Equipment modelling. (3D Scanning & Cloud based)
3. Deliverables extractions from S3D, Piping Isometrics, Piping GA (UG/AG).
4. Preparation P&ID markups according to design modifications.
6. Attending and leading 30%/60%/90% Review with client.
5. Coordinating with other discipline such as Civil, Electrical, Instrumentation.
EPC for Ekofisk oil field Project-CSCC & Wellhead platform modification (Brown field), Norway
Client: EXXONMOBIL/PEG (brown Field Onshore & offshore)
As part of the project, the Existing well head platforms modified & developed, facilities shall be enhanced by providing the following:
1. Piping Modelling as per P&ID In AVEVA PDMS 12.1 SP4. (3D scanning)
2. Preparation & Modification of Equipment modelling wrt layout and site location.
3. Deliverables drafts from PDMS Piping Isometrics, Piping GA (UG/AG).
4. Attending and leading 30%/60%/90% Review with client.
5. Preparation P&ID markups according to design modifications.
6. Preparation of Valve data Sheets.
Following major activities were performed for as part of the project:
1. Preparation(Extractions) & checking of Piping GA. Governing case selection and establish sizing basis for equipment.
2. Attending and leading 30%/60%/90% Review with client.
3. Preparation & checking of Drawings for PIG Launcher & receiver.
4. Study for Pipeline/Piping Routings & Survey.
5. Preparation of Plot Plans.
6. Client Coordination's for Technical Queries.
Combined Das island offshore project Client: ADNOC Offshore (PDMS/E3D)
1. Piping Modelling as per P&ID In AVEVA PDMS 12.1 SP4.(3D Scanning)
2. Drafts extractions for spool drawings and IFC isometric.
3. Preparation of Bill of material & Mark-up drawings.
4. Piping Routing & studies in Field Layout for Wellhead platform's location in Das island
5. Preparation & CHECKING Piping MTO from 3D SOFTWARE.
6. Coordinating with ADNOC OFFSHORE for technical Queries.
7. Attending and leading 30%/60%/90% Review with client.
8. Preparation & Checking of Accommodation black water line drawing and isometric.
9. Preparation of Demolition drawings for Field layout, Routing plan, MTO, Station approaches and Detail drawings as per ADNOC Requirements.
10.Attending Field layout Rout studies and Review with client.
11. Coordinating with surveyors for comments on Alignment sheets.
12.Coordination with other Discipline for clash checks and other technical Queries.
BASRA REFINARY PROJECT modifications-Qatar
1. Preparation & checking of Piping GA.
2. Piping and Equipment Modelling in PDMS Aveva Package.
3. Extraction isometrics and Piping GA in Drafts.
4. Preparation & checking of Piping Isometrics.
5. Study for Piping Routings & Survey.
6. Attending and leading 30%/60%/90% Review with client.
7. Client Coordination's for Technical Queries.
8. Preparation of Field layouts & Markup drawings.
9. Preparation of Demolition drawings.
10. Piping modelling as per P&ID & PFD in SP3D/E3D Packages.
11. Equipment Modelling as per MDS & existing layouts.
Jabel Dana-Salt Dome (3D Scanning)
Replacement of 16” and 10” Gas line at BAB area
Neopharm Capsule plant
GASCO. EPC for tie-in work at Southeast Package-C BAB TH-B GAS INJECTION SYSTEM HOLISTIC – FEED
ENOC Power Plants
1. Preparation & checking of Extracted Piping GA.
2. Piping and Equipment Modelling in E3D Aveva Package.
3. Extraction isometrics and Piping GA in Drafts.
4. Attending and leading 30%/60%/90% Review with client.
5. Site verification and site survey for design feasibility issues.
6. Piping Isometric and spool drawing checking activity.
7. Spools extractions from PDMS draft for IFC.
JACOBS-Molecular Refinery Oil for All Phase (Texas)
JACOBS-EPC for Aberdeen Pipeline Phase-III (Houston-Pipeline)
Project Scope involved basic and detail engineering design for Caustic Soda plant and commissioning support. Actively involved in various activities such as:
1. Piping Modelling as per P&ID (3D Scanning)
2. Preparation of Equipment modelling. (3D Scanning & Cloud based) 3.Checking spool drawing received from Piping Draftsman.
4. Checking spools in shop for verifying design isometrics IFC.
5. Manhour's calculations and Project related activities for PMC team.
6. Preparation and Modification in Station approaches.
7. Checking Piping as built at site
8. Supervising Piping Designers team for UAE projects.
Project Title: FEED FOR QUSAHWIRA POTABLE WATER LINE TO CDS
1. Preparation & checking of Extracted Piping GA.
2. Piping and Equipment Modelling in PDMS Aveva Package.
3. Preparation and Checking Isometric drawings for AS BUILT.
4. Spoolgen operator work involvement for contractor work.
5. Golden join list preparation as per client requirement.
6. Isometric checking for Piping Construction at site.
Project Title: AS built, Al Shaheen Field Phase Nomics (QP)
1. Piping Modelling as per P&ID with PDMS.
2. Site verification survey and technical queries visit to Halul Island.
3. Preparation & Modification of Equipment modelling.
4. Deliverables drafts from PDMS Piping Isometrics, Piping GA (UG/AG).
5. Preparation P&ID markups according to design modifications.
6. Preparation of Valve data Sheets.
7. Modelling For Stress analysis in Ceasar II.
8. Preparation of Wall Thickness Calculation document as per client requirement.
Planning & coordinating with other discipline such as Civil, Electrical, Instrumentation
Project Title: BARC (Bhabha Research Centre India)
Nuclear Power Plant Khatara, India
1. Assist with the implementation of Intergraph Smart plant 3D.
2. Spoolgen Isometric generation for shop drawings.
3. Comment incorporation from piping Engineer.
Project Title: AS built, Al Shaheen Field Phase Nomics (QP)
1. Piping Modelling as per P&ID with PDMS (3D Scanning)
2. Site verification survey and technical queries visit to Halul Island.
3. Preparation & Modification of Equipment modelling.
4. Deliverables drafts from PDMS Piping Isometrics, Piping GA (UG/AG).
5. Preparation P&ID markups according to design modifications.
6. Preparation of Valve data Sheets.
7. Modelling For Stress analysis in Ceasar II.
8. Preparation of Wall Thickness Calculation document as per client requirement.
Planning & coordinating with other discipline such as Civil, Electrical, Instrumentation
1. Preparation of Piping GA, Piping Plot Plans, and Isometrics.
Preparation and Comment incorporation for barge
2. Comments Incorporation and preparation of isometrics.
Piping Engineering
3D Modelling
2D drafting
3D scanning
Piping Routing
Pipeline Engineering
SP3D
AutoCAD
Plant 3D
PDMS