Summary
Overview
Work History
Education
Skills
Languages
Custom Section
Timeline
Generic
Mohamed Al Halabi

Mohamed Al Halabi

Abu Dhabi

Summary

Seasoned engineering professional with over 24 years of engineering and contracting experience in the UAE construction industry. Demonstrated expertise in project planning and execution, cost optimization, contract management, and multidisciplinary team leadership. Proven track record of coordinating with government authorities to secure timely project approvals and ensure regulatory compliance. Adept at managing large-scale infrastructure and building projects, with deep knowledge of UAE construction regulations and industry best practices. Adaptable and result-driven professionals with strong leadership, teamwork, and communication skills. Excels in time management, multitasking, and performing under pressure. Quick learner with a continuous drive for development and proven ability to thrive in diverse environments.

Overview

21
21
years of professional experience

Work History

Resident Engineer

HDP OVERSEAS LIMITED CONSULTANTS
05.2025 - Current
  • Sheikh Mohammad Bin Zayed Hospital in Ajman, UAE.
  • Design of 280 Bed Sheikh Mohammad Bin Zayed Central Hospital, comprising of Main Hospital Building, CUP, Morgue and Mosque with approximate BUA of 81,000 m2.

Resident Engineer

CONIN INTERNATIONAL CONSULTANTS
03.2023 - 04.2025
  • JVC Violet Tower
  • The Project is located in Jumeirah Village Circle in Dubai, and consists of 30 stories tower with total area of 66,000 m2.

Projects Manager

ATN ENGINEERING LLC
01.2021 - 02.2023
  • Hatta Police Station (Infra Structure & Road Works).
  • DIFC Living & Innovation Landscaping & Irrigation works, Dubai.

Sr. Construction Manager

ARABTEC CONSTRUCTION
01.2013 - 12.2020
  • Zayed National Museum – Abu Dhabi
  • Project Management Hill International
  • Client Department of Culture & Tourism Company- DCT
  • Consultant Wsp / Foster and Partners
  • Project Value AED 2,000,000,000 Project Overview
  • The Project is located in the Saadiyat Cultural District on Plot with 112,500 m2 area and the total Built- up area of 83,572 m2. Museums comprise of gallery displays as well as special exhibition spaces in which visitors can explore the long history, heritage, and culture of the UAE and its place in the world. Each gallery is inspired by the values of Sheikh Zayed

Project Manager

AL ESLAH GENERAL CONT. EST
02.2011 - 12.2012
  • Al Madina Police Station – Al Ain Client Abu Dhabi Police GHQ Project Management Secure
  • Consultant Bainona Engineering Consultancy
  • Project Value AED 40,000,000
  • Project Overview
  • New police station with a total area of 9,1000 m2.
  • Scope of work included construction of all structures, MEP works, Infrastructure network, roads, an electrical substation and finishing works, aluminum and glazing works, external works and precast boundary walls.

Project Manager

ASWAR ENGINEERING & GEN. CONT. CO.
08.2009 - 02.2011
  • Al Hayer Police Station – Al Ain Client Abu Dhabi Police GHQ Project Management Secure
  • Consultant Bainona Engineering Consultancy
  • Project Value AED 43,000,000
  • Project Overview
  • New police station with a total area of 9,1000 m2.
  • Scope of work included construction of all structures, MEP works, Infrastructure network, roads, an electrical substation and finishing works, aluminum and glazing works, external works and precast boundary walls.

Project Engineer

EMIRATES LINK MALTAURO L.L.C.
03.2008 - 07.2009
  • Baniyas Towers – Abu Dhabi Client Aldar Properties | ALDAR Consultant Ehaf
  • Project Value AED 163,000,000
  • Project Overview
  • Two towers with total built up area of 69,764 m2, combine modern architectural design with a stylish, flexible interior. Natural materials dominate; a striking aluminum and glass façade, and granite and marble lined entrances, provide a strong professional atmosphere for international corporations. The Towers have over 900 underground parking spaces - one of the highest car parking ratios in Abu Dhabi.

Project / Coordination Engineer

AL SALMEEN GEN. CONT. EST.
05.2005 - 03.2008
  • Replacement of AC Water Pipes in Al Ain Client Al Ain Distribution Company | AADC Consultant MWH
  • Project Value AED 51,177,000.00
  • Project Overview
  • A mega project for the replacement of the old water network in Al Ain with a new network consists of AC pipes, HDPE pipes, all kind of valves and chambers.
  • Project required road crossings in which we used many ways to do it such as NDRC (Non-Disruptive Road Crossing), and open cuts of existing asphalt roads.

Education

Bachelor’s degree - civil engineering

Islamic University of Gaza
Palestine
01.2001

Skills

  • Microsoft Office
  • AutoCAD

Languages

Arabic
English

Custom Section

24

Timeline

Resident Engineer

HDP OVERSEAS LIMITED CONSULTANTS
05.2025 - Current

Resident Engineer

CONIN INTERNATIONAL CONSULTANTS
03.2023 - 04.2025

Projects Manager

ATN ENGINEERING LLC
01.2021 - 02.2023

Sr. Construction Manager

ARABTEC CONSTRUCTION
01.2013 - 12.2020

Project Manager

AL ESLAH GENERAL CONT. EST
02.2011 - 12.2012

Project Manager

ASWAR ENGINEERING & GEN. CONT. CO.
08.2009 - 02.2011

Project Engineer

EMIRATES LINK MALTAURO L.L.C.
03.2008 - 07.2009

Project / Coordination Engineer

AL SALMEEN GEN. CONT. EST.
05.2005 - 03.2008

Bachelor’s degree - civil engineering

Islamic University of Gaza
Mohamed Al Halabi