Summary

Materials and QA/QC manager with 20 years of experience in civil engineering infrastructure projects. Expertise in managing production at asphalt and concrete plants, ensuring compliance with project specifications and regulatory standards. Proficient in ISO 9001:2015 quality assurance, process optimization, and enhancing team performance through strategic management and risk assessment. Key projects include collaborations with RTA, DM, DEWA, Abu Dhabi Municipality, and Al Ain Municipality, with a strong focus on material testing methods per ASTM, AASHTO, DIN, ISO, ACI, BS, and BS EN standards. Dependable and diligent professional with experience analysing and developing procurement plans and strategies. Collaborates well with technical experts to manage successful vetting processes for issued tenders. Proactively seeks cost-effective solutions to business requirements. Committed and reliable communicator with excellent organisation and time management skills. Eager to learn and develop industry knowledge to assist and support procurement team. Offers creative, innovative mindset to help improve procurement strategies. Logistical planner and team leader with supply management experience. Background in record-keeping and inventory control. Proactive, resourceful and results-driven professional. Takes on challenging new role harnessing interpersonal skills, collaboration and problem-solving. Driven to deliver high-quality service and consistent results. Loyal employee with solid understanding of training and mentoring employees. Dedicated team player, proactive and hands-on in task completion.

Overview

21
21
years of professional experience
1
1
Certification

Work history

Materials Manager

CSCEC
2025.01 - 2026.03
  • R1181/1 – Improvement of Umm Suqeim Roads from Jumeirah to Al Khail Roads
  • Umm Suqeim Street Improvement Project (R1181/1A), Dubai
  • Upgraded 4.5 km corridor from Al Khail Rd to Sheikh Zayed Rd
  • Delivered bridges, underpasses, road widening, utilities relocation, drainage, and traffic systems
  • Improved traffic capacity, safety, and reduced congestion
  • Milestone: Completed bridge & ramp to Al Quoz Industrial Area and at-grade roads up to Al Asayel Junction within 15 months of Design NOC
  • Umm Suqeim Street Improvement Project (R1181/1B), Dubai
  • Upgraded corridor from Jumeirah Junction to Al Wasl Junction
  • Constructed underpasses and widened roads/junctions
  • Executed utilities relocation, drainage, and traffic systems
  • Enhanced capacity, safety, and reduced congestion
  • Client: RTA
  • Consultant: Parsons
  • Project Value: 1.300 Billion

Materials & QA/QC Manager

NCTC
2023.11 - 2025.11
  • Implementation of Model Neighbourhood in Al-Barsha 2 & Al Khawaneej 2
  • Transforming residential areas into “20-minute city” model neighbourhoods with pedestrian-priority design and multi-modal connectivity: 17–30 km of integrated walking, cycling and micro-mobility tracks; smart mobility hubs and signage; shaded walkways and rest zones
  • Upgrading infrastructure: internal and collector roads; stormwater drainage; street lighting (LED); utility relocations and enhancements; landscaping and planting schemes (650+ trees and green corridors)
  • Leading full QA/QC lifecycle: materials approval, lab & site testing for pavements, concrete, lighting, drainage and structural elements; supervise compliance with RTA/ISO specifications.
  • Client: RTA
  • Consultant: CDM SMITH
  • Project Value: 220 millions

NCTC
2022.11 - 2024.11
  • Internal Roads in Margham, Lehbab, Al Lisaili & Hatta (2nd Phase)
  • Constructing approx. 37 km of new internal roads and upgrading 21 km of existing roads — including pavement layers, subbase stabilization, asphalt overlay; junctions, roundabouts and intersections for improved vehicular flow Installing supporting infrastructure: stormwater drainage networks, LED street lighting, utility shifts, bus stops, parking bays and pedestrian crossings.
  • Managing QA/QC and materials testing (soil, aggregates, asphalt, concrete), issuing ITPs, coordinating contractor interventions, supervising testing labs and ensuring deliverables meet RTA's technical requirements.
  • Client: RTA
  • Consultant: Khatib & Alami
  • Project Value: 150 Million

Sr. Material Engineer / QA/QC Manager

NCTC
2022.01 - 2022.11
  • Internal Roads in Al Quoz (2nd Phase)
  • Construction of ~16 km internal road network: subgrade/sub-base preparation, granular base, asphalt layers.
  • Installation of LED streetlights, stormwater drainage manholes with interconnecting pipes, traffic signage, curbs, gutters.
  • Strengthening junctions, signalized intersections, pedestrian crossings, ADA-compliant sidewalks.
  • Full labs & on-site QC: compaction, bitumen content, aggregate gradation, concrete strength.
  • Coordinated multi-utility relocation (water, telecom, irrigation).
  • Client: RTA
  • Consultant: Aqleh Engineering
  • Project Value: 160 Million

Sr. Material Engineer

NCTC
2020.11 - 2022.01
  • Sheikh Khalifa Road → Al Madam → Al Showaib Road Links (Phase-3)
  • Phase-3 of the Sheikh Khalifa Road–Al Madam–Al Showaib Road Links project comprises the construction and upgrading of dual carriageway road sections, including pavement and earthworks, development of interchanges, junctions, bridges, and culverts, installation of traffic management and road safety systems, implementation of stormwater drainage networks, relocation and protection of existing utilities, execution of landscaping and environmental works, provision of temporary traffic diversions during construction, and completion of testing, commissioning, and final handover to deliver a fully operational and efficient road network.
  • Client: Ministry of Presidential Affairs
  • Consultant: CORE Engineering
  • Project Value: 400 Million

Sr. Material Engineer

Ghantoot Group
2018.06 - 2020.10
  • Linking Sheikh Khalifa Specialty Hospital with Federal Roads (Packages 1 & 2)
  • The project involves the comprehensive development of road infrastructure to link Sheikh Khalifa Specialty Hospital with key federal highways in Ras Al Khaimah, including the construction of new dual carriageway roads and upgrading of existing routes to improve traffic capacity and flow. The scope includes the development of major interchanges with loop ramps, incorporating two large bridges and eight underpasses to ensure grade-separated, uninterrupted traffic movement.
  • The works also comprise advanced pavement construction utilizing geogrid materials for subgrade stabilization and pavement reinforcement, along with the application of Polymer Modified Bitumen (PMB) for loop ramps to enhance durability and performance under high stress conditions. In addition, the project includes installation of traffic management and road safety systems such as signage, markings, barriers, and street lighting, as well as stormwater drainage networks for effective runoff management.
  • Further activities involve utility relocation and protection, earthworks and embankment construction, landscaping and environmental works, and implementation of temporary traffic diversions during construction. The project concludes with testing, commissioning, and final handover, delivering a safe, efficient, and high-performance road network providing direct access to the hospital.
  • Client: MOID
  • Consultant: Dorsch
  • Project Value: 260 Million

Sr. Material Engineer

Ghantoot Group
2018.06 - 2020.10
  • Extension of Sheikh Zayed Bin Sultan Street to Al Reem Island
  • The project involves the extension of Sheikh Zayed Bin Sultan Street to Al Reem Island, creating a high-capacity multi-lane dual carriageway with enhanced connectivity between the mainland and the island. A major component of the works is the demolition of three existing bridges linking the two islands, followed by the construction of three new replacement bridges—both onshore and offshore—to provide safer, more durable connections.
  • The road works include cement-stabilized subbase pavement construction, earthworks, stormwater drainage systems, utility relocation and protection, and traffic safety installations such as signage, barriers, and lighting. The project also features grade-separated interchanges, loops, and ramps to facilitate smooth traffic flow. Landscaping and environmental enhancements are included along the medians and roadside areas.
  • This extension significantly improves accessibility, reduces congestion, supports urban development, and delivers a safe, modern, and resilient transport corridor connecting the mainland to Al Reem Island.
  • Client: Musanadah
  • Consultant: Tubodin

Sr. Material Engineer

NCTC
2015.08 - 2018.03
  • Internal Roads – Oud Al Muteena No. 02 & Cycle Track (R931/3 & R978/3A)
  • The project focuses on the upgrading and construction of internal roads within Oud Al Muteena No. 02, along with the creation of a dedicated cycle track along routes R931/3 and R978/3A. The works include pavement construction with durable materials, earthworks, stormwater drainage systems, street lighting, road markings, traffic signage, and landscaping, ensuring improved functionality and safety for all users.
  • The cycle track promotes active transportation and recreational mobility, while the upgraded internal roads enhance vehicular circulation, connectivity between neighborhoods, and access to local amenities. This project supports Dubai's broader vision of sustainable urban development, smart mobility, and community-friendly infrastructure, providing a modern, safe, and environmentally-conscious transportation network for residents and visitors.
  • Client: RTA
  • Consultants: AECOM & Parsons
  • Project Value: 600 Million

Sr. Material Engineer

NCTC
2014.04 - 2015.07
  • Internal Roads – Al Hamidiyah (Ajman) & Ahmed Bin Rashid Road (Umm Al-Quwain)
  • Widening and pavement upgrade on ~10 km existing roads; subbase, base, asphalt overlay.
  • Drainage improvements: culverts, gully traps, lined channels; improved traffic signs and markings.
  • On-site QA of compaction, concrete kerbs; lab validation on bitumen and concrete.
  • Client: Ministry of Public Works
  • Consultants: Conser & Idroesse
  • Project value: 80 Million

Sr. Material Engineer

NCTC
2013.04 - 2014.03
  • Upgrade – Masafi–Fujairah & Fujairah Airport Roads
  • 1. Internal Roads – Al Hamidiyah, Ajman
  • This project involves the upgrading and construction of internal roads in the Al Hamidiyah area of Ajman. The scope includes pavement construction, earthworks, stormwater drainage, street lighting, road signage, and landscaping, providing improved vehicular circulation, local connectivity, and access to residential and commercial areas. The project enhances community mobility, road safety, and urban infrastructure standards in line with Ajman's urban development goals.
  • 2. Ahmed Bin Rashid Road – Umm Al-Quwain
  • This project focuses on the upgrading of Ahmed Bin Rashid Road in Umm Al-Quwain, improving a key arterial route for regional connectivity and traffic flow. The works include road widening, pavement reinforcement, stormwater drainage systems, street lighting, traffic signage, and landscaping, ensuring efficient movement of vehicles and safer access for local residents and commuters. The project supports Umm Al-Quwain's urban development plan and infrastructure enhancement initiatives.
  • Overall Impact:
  • Both projects strengthen internal road networks, enhance traffic efficiency, improve safety, and provide modern, durable infrastructure, contributing to sustainable urban growth and better connectivity.
  • Client: Ministry of Public Works
  • Consultants: Conser & Idroesse
  • Project Value: 200 Million

Material Engineer

Al Ahmadiah Aktor
2011.10 - 2012.07
  • DS-162/2 – Main Pump Station Upgrade (Phase-1)
  • The project involves the upgrade of four main sewage pump stations (including DS-162/2) in Dubai, aiming to enhance pumping capacity, reliability, and efficiency of the city's wastewater network. The works include replacement and installation of pumps, rehabilitation of pipelines, valves, pressure control systems, civil strengthening of station structures, and modernization of electrical and control systems. Safety, operational monitoring, and environmental measures are integrated throughout. The upgrade ensures efficient, continuous, and sustainable sewage pumping and management, supporting the growing population and urban development in Dubai.
  • Client: Dubai Municipality
  • Consultant: MWH
  • Project Value: 90 Million

Material Engineer

Al Ahmadiah Aktor
2009.10 - 2011.10
  • Dubai–Fujairah Freeway Construction
  • Summary – Dubai–Fujairah Freeway Construction (Mountainous Terrain & Major Structures):
  • The Dubai–Fujairah Freeway is a flagship infrastructure project in the UAE, constructed through highly challenging mountainous terrain. The works involved excavation of over 5 million m³ of rock cuttings, with drill-and-blast techniques creating cuttings exceeding 100 m in height. The excavated Gabbro was processed on-site using mobile crushers and reused as high-quality aggregate for pavement and reinforced soil walls, reducing costs and environmental impact.
  • To traverse steep valleys and ravines, the project implemented 26 reinforced soil walls using the TensarTech TW1 system, including single-tier walls up to 22 m, two-tiered walls up to 40 m, and three-tiered walls reaching 60 m—the tallest ever designed by Tensar. These walls formed massive embankments and included 4 m × 4 m culvert openings to maintain water flow during the rainy season, allowing rapid construction and significant cost savings compared to traditional cast-in-situ or precast concrete.
  • The project also included five major bridges, incorporating box girders and precast girders, built across difficult terrain. The bridge works encompassed foundation construction, concreting, post-tensioning, installation of modular and elastomeric bearings, and expansion joints, demonstrating advanced experience in complex bridge engineering.
  • These bridges provided safe and durable continuity for the four-lane freeway where embankments were not feasible.
  • With multiple installation teams achieving up to 150 m² of wall face per day, the combination of reinforced soil walls, major bridges, and innovative use of excavated material enabled the freeway to navigate extreme topography efficiently. The project delivered a high-speed, safe, and durable corridor between Dubai and Fujairah, setting a benchmark for mountain road and bridge construction in the UAE and demonstrating best practices in civil and structural engineering, sustainability, and project execution.
  • Client: Ministry of Public Works
  • Consultant: Dorsch
  • Project Value: 460 Million

Material Engineer

Al Nuemy Group
2007.11 - 2009.11
  • Fujairah–Qusaid Road Maintenance & Improvement
  • The project involves the construction of new road sections and upgrading of existing stretches along Al Qasr Road in Fujairah. The pavement is constructed in two layers: subbase and road base, topped with three layers of asphalt, providing a durable and high-performance roadway. The project also includes drainage systems, earthworks, landscaping, and architecturally designed street lighting on both sides of the road, enhancing safety and aesthetics. The works deliver a safe, efficient, and visually appealing transport corridor, improving connectivity and supporting regional development in Fujairah.
  • Client: Ministry of Public Works
  • Consultant: Jouzy
  • Project Value: 60 Million

Material Engineer

Al Nuemy Group
2005.05 - 2007.11
  • Fujairah–Khor Fakkan Highway Widening & Improvement
  • The project involves widening and upgrading 22 km of the Fujairah–Khor Fakkan Highway, including re-laying existing pavement, constructing new asphalt wearing layers, and improving road alignment. A new 6 km bypass has been constructed to ease traffic congestion and enhance travel efficiency between Khor Fakkan and Fujairah.
  • Key works also include:
  • Box culverts and stormwater drainage systems to manage runoff and prevent flooding.
  • Street lighting installation along the highway to improve nighttime safety.
  • Road markings and signage for enhanced traffic management.
  • ETISALAT infrastructure relocation/protection along the route.
  • This project delivers a safer, higher-capacity, and durable roadway, improving connectivity, reducing travel time, and supporting economic and regional development in the region.
  • Client: Ministry of Public Works
  • Consultant: Jouzy

Education

Bachelor Of Science / B.Tech - Civil Engineering

AL Azhar University
CAIRO
2004

Certified Quality Engineering Diploma - QUALITY MNAGEMENT

ESQ
CAIRO
08.2020

Skills

Office software proficiency

Internet navigation and applications

  • Technical issue resolution

Certification

  • Lead Auditor of ISO 9001" 2015
  • Internal Quality Auditor of ISO 9001
  • Internal Quality Auditor of ISO 45001:2018

Languages

Arabic mother tongue
English fluent (spoken & written)

Disclaimer

Finally I am looking forward to be one of your team and I hope you will find the proper and qualified, really motivated and very active Material & QA/QC Manager I can deal with deeds and I verified many deeds. Reference available upon request. Best regards, Yours Mohammad Naeim

Summary of Achievement

  • Management:
  • Good understanding of business and strategic management / Risk Management Analysis / ‘Value Engineering” and “Cost / Quality Control” / Implement incentive system to achieve the max. Effort of the team. Forecast needs. Problems / Clashes and propose Solutions.
  • Quality Control:
  • Control the Quality of work, materials, design / production of different mixes, Construction of different road layers, pipelines and structures to the required quality control / quality assurance procedures.
  • Follow the maintenance and calibration of different plants and equipment in order to keep them in proper accurate condition.
  • Evaluate / interpret the output results and implement safety and quality measures as per the quality and safety plans.
  • Survey the required products, materials, crushers and manufacturers, plant / equipment suppliers to maintain high quality alternative resources.
  • Technical
  • Reviewing, design mixes, shop drawings and related specification of all the procured materials., evaluate the cost of quality control testing as per B.O.Q items at the stage of tendering, preparing the project quality plane, close NCR'S , make internal /external audits , maintain the project dashboard , making the project ITP.
  • Preparing construction planes and monitoring work-in progress for ensuring adherence to quality standards.
  • Ensure that as -built drawing, method statements, risk assessment, ITP'S etc. are up to date relevant and any changes to be incorporated and resubmitted.
  • Supporting project requirements with respect to quality, preservation, cost and schedule.
  • Monitor bid plan verses actual plan to establish order progress and tracking % bid vs.% ordered vs. % delivered.
  • Lead material team and collaborates with engineering team to interpret engineering requirements.

Timeline

Materials Manager

CSCEC
2025.01 - 2026.03

Materials & QA/QC Manager

NCTC
2023.11 - 2025.11

NCTC
2022.11 - 2024.11

Sr. Material Engineer / QA/QC Manager

NCTC
2022.01 - 2022.11

Sr. Material Engineer

NCTC
2020.11 - 2022.01

Sr. Material Engineer

Ghantoot Group
2018.06 - 2020.10

Sr. Material Engineer

Ghantoot Group
2018.06 - 2020.10

Sr. Material Engineer

NCTC
2015.08 - 2018.03

Sr. Material Engineer

NCTC
2014.04 - 2015.07

Sr. Material Engineer

NCTC
2013.04 - 2014.03

Material Engineer

Al Ahmadiah Aktor
2011.10 - 2012.07

Material Engineer

Al Ahmadiah Aktor
2009.10 - 2011.10

Material Engineer

Al Nuemy Group
2007.11 - 2009.11

Material Engineer

Al Nuemy Group
2005.05 - 2007.11

Bachelor Of Science / B.Tech - Civil Engineering

AL Azhar University

Certified Quality Engineering Diploma - QUALITY MNAGEMENT

ESQ