Astute Sr.Project Engineer equipped to monitor and oversee diverse projects. Evaluates requirements and scope to determine feasibility and allocate resources. Superior record of success overseeing both large- and small-scale projects and I have 6 years of expertise in completing projects to meet client expectations. Expert in coordinating project estimates, risk assessments and technical drawings to prepare for projects. Attentive in consistently analyzing real-time project data and reviewing reports for informed decision-making and ongoing support.

Overview

6
6
years of professional experience
5
5
years of post-secondary education

Work history

Senior Project Engineer

Emirates Fire Fighting Equipment Factory (FIREX)
Dubai, UAE
08.2018 - Current


  • Ensuring project data is entered into the planning and scheduling process, provide input into the timing of the projects and assign resources to the project as needed.
  • Prepare monthly payments and following with clients.
  • Site Management & Supervising the installation of all systems in firefighting { Sprinkler & Firefighting systems,Fm2oo system,Deluge system,Preaction system,Foam system,Fire hydrant system }
  • Prepare technical or operational reports.
  • Prepare detailed work plans.
  • Determine B.O.Q of materials needed in the project.
  • Manage and coordinate multi-discipline engineering activities to ensure projects are executed in a safe, efficient, cost effective and timely manner.
  • Maintain a detailed diary of the day's work activities, issues, work approvals or rejection, hours of operation, labor and equipment used. Etc.
  • Act as primary technical co-ordination interface with client to ensure that the client's expectations are satisfied.
  • Ensure the project conforms to the client's approved Basis of Design and all applicable regulatory and code requirements.
  • Coordinating between project disciplines to support project wide deliverables within the appropriate project schedule.
  • Advice architects, builders, and other construction personnel on fire prevention equipment and techniques, and on fire code and standard interpretation and compliance.
  • Prepare technical or operational reports.
  • Monitoring engineering, design and drawing drafting, design calculations, specifications, budget and schedule. Preparing, review and approve the specifications, drawings, material submittals, method statements.
  • Preparing the monthly invoice as per site progress.
  • Providing technically integrated solution for firefighting and fire alarm issues.
  • Coordinate daily, weekly and monthly progress reports (project progress, material procurement, submittals and approval, manpower utilization.)Continuous communication with workers and knowledge of the problems during work.
  • Responsible for following up the projects and follow up the work according to the code and preparing work inspection (WIR), material inspection (MIR).
  • Ensured customer satisfaction by effectively balancing project resources against customer needs.
  • Achieved 100% compliance across projects, verifying all designs met legislative requirements.
  • Maintained business continuity, developing contingency plans to minimize project risk.
  • Directed and supervised work of 100 labors+ subcontractors.
  • Resolved project engineering issues, developing innovative solutions that resulted in cost savings.
  • Oversaw many projects from concept through completion, managing budgets of up to 30 million AED.
  • Optimized costs by negotiating with suppliers to source efficient materials and services.
  • Facilitated smooth project execution by providing technical guidance and on-site support.
  • Created detailed project schedules, working closely with contractors to manage deadlines.
  • Reduced costs by allocating site resources and subcontractors for strict budget controls.
  • Assessed costs of labor and materials for each project, ensuring adherence to budgetary requirements.
  • Completed project goals safely on budget and to desired deadline.
  • Reviewed designs, plans and reports to ensure constant compliance with project specifications.
  • Enforced health and safety protocols to minimize accidents and injury.
  • Checked client requirements and generated solutions from identified needs.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Used different troubleshooting strategies to locate and diagnose system faults.
  • Executed quality assurance activities, checking project results against client requirements.
  • Monitored and escalated project risks reducing effects on project deliverables.
  • Identified and rectified quality issues, minimizing operational disruption.
  • Coordinated project resources, goals and activities, facilitating successful closure and handover.
  • Assessed effects of changes to project timelines, costs and resource requirements.
  • Followed established organisational processes for work and task completion.
  • Produced project progress reports for stakeholder reviews and meetings.



Site Engineer

Ever Secure Mechanical Contracting llc
Abu Dhabi, uae
07.2017 - 07.2018
  • Responded to technical concerns quickly and effectively, devising strategic solutions to minimise project disruption.
  • Motivated teams to deadline through regular site visits and inspections, problem-solving accordingly and eliminating bottlenecks.
  • Minimised project risks, conducting structural monitoring to ensure maximum safety and stability.
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and associated documents.
  • Outlined construction schedules, equipment and labour requirements using Gantt charts.
  • Oversaw Quality Control (QC) for construction teams, delivering results in line with project specifications.
  • Completed projects on time and within budget by collaborating with contractors, architects and public authorities.
  • Onboarded and inspected work of subcontractors to drive quality and performance.
  • Reviewed construction plans and financial projections, verifying project scope accuracy and feasibility.
  • Surveyed, graded and levelled construction sites within assigned timeframes.
  • Checked technical drawings for adherence to standards, maintaining operational compliance.
  • Documented daily progress, incidents and issue resolutions for accurate site records.
  • Compiled and presented reports explaining project details to non-technical stakeholders.
  • Suggested process and technical design changes to improve performance and efficiency.
  • Liaised with local authority to confirm compliance with local constructions and regulations throughout project cycle.
  • Communicated with clients and client representatives, attending regular meetings to update on progress.
  • Oversaw selection and requisition of materials.
  • Researched environmental impact of projects and incorporated eco-friendly and sustainable features into design plans.
  • Wrote down work schedules and communicated changes to crew members and clients.

Education

Bachelor of Engineering - Mechanical Engineer

Jordan University of Science & Technology (JUST)
Jordan
09.2012 - 05.2017

Skills

  • Failure investigations
  • Communication & Team work
  • Time Management & Multi Tasking
  • Tender documentation
  • Process engineering
  • Technical liaison
  • Validation testing
  • Project risk analysis
  • Sustainable engineering principles
  • CAD proficiency
  • Discrepancy reporting
  • Cross-functional team coordination
  • Test documentation
  • Subcontracting management
  • Project estimation
  • Presentation creation
  • Writing Requests For Information (RFI)
  • Blueprint reading
  • AutoCAD knowledge
  • Quality inspections
  • Construction safety
  • Change order management
  • Document control
  • Contract negotiation
  • Construction design
  • 3D drawing
  • Team supervision

Languages

English
Fluent
Arabic
Native

Projects

1- PENINSULA PROJECT (B2, G+36) (BUSINESS BAY-DUBAI) (Present)

2- PENINSULA PROJECT (B3, G+36) (BUSINESS BAY-DUBAI) (Present)

3- PENINSULA PROJECT (B1, G+5) (BUSINESS BAY-DUBAI) (Present)

4- DOWNTOWN VIEWS (B1, G+70) (DOWNTWON-DUBAI)

5- DOWNTOWN VIEWS (B1, G+64) (DOWNTWON-DUBAI)

6- DOWNTOWN VIEWS (B1, G+55) (DOWNTWON-DUBAI)

7- B1&B2 EMMAR PROJECT (BASMENT 5+ GROUND) (DOWNTWON-DUBAI).

8- EMMAR OPERA GRAND TOWER (B4, G+70+Roof) (DOWNTWON-DUBAI).

9- DANAT AL QUDRA TOWER (B4, G+22) (ABU DHABI).

Timeline

Senior Project Engineer

Emirates Fire Fighting Equipment Factory (FIREX)
08.2018 - Current

Site Engineer

Ever Secure Mechanical Contracting llc
07.2017 - 07.2018

Bachelor of Engineering - Mechanical Engineer

Jordan University of Science & Technology (JUST)
09.2012 - 05.2017
Mohammad Omar