MD RAUKESH

Ninga

Summary

Ensures that all pipelines and associated facilities are designed in accordance with all regulations, applicable industry codes and client specifications and standards Support development of the final construction methodology and work prioritization.

Over 17Years, Experience at Site management, planning and construction work in Oil & Gas Projects including in Pipeline, Piping, Refinery. Good knowledge of Standard Code & Specifications gained through Working on different projects Technical Knowledge in Inspection Welding Quality Management and International Codes and Standards. KNOWLEDGE OF INTERNATIONAL CODES AND STANDARDS SUCH AS API API 650 Specification, world wide standard for above ground Tank Design & Construction. API 653 Tank Inspections, Alteration & Re-Construction. API 510 Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration API 570 Piping Inspection Code: Inspection, Repair, Alteration, and Rerating of In-service Piping Systems ASME B16.34 Valves—Flanged, Threaded, and Welding End B31.3 Process Piping Section II: Materials Section V: Non Destructive Examination Section VIII: Division 1, Rules for Construction of Pressure Vessels Section IX: Welding and Brazing Qualifications ASNT SNT-TC-1A Personnel Qualification and Certification in Non-destructive Testing.

Overview

17
17
years of professional experience

Work History

Pipeline Mechanical Engineer

INTERNATION MECHANECHAL ELECTRICAL ENGINEERING
Abu Dhabi
10.2025 - Current
  • Project Execution & Supervision
  • Supervise and coordinate pipeline construction activities at the site to ensure they are executed in accordance with project specifications, approved drawings, and schedules.
  • Monitor day-to-day progress and provide updates to project management.
  • Technical Oversight
  • Review and interpret engineering drawings, specifications, and piping isometrics.
  • Ensure proper fit-up, welding, alignment, and installation of pipeline sections.
  • Verify that materials, equipment, and construction methods meet project and industry standards.
  • Quality Assurance & Control
  • Conduct inspections and checks on welds, joints, and pipeline components.
  • Ensure compliance with approved Welding Procedure Specifications (WPS), Non-Destructive Testing (NDT), and coating requirements.
  • Document and report quality issues, non-conformities, and corrective actions.
  • Health, Safety, and Environment (HSE)
  • Implement and enforce project HSE policies and safe work practices at the construction site.
  • Conduct safety briefings, toolbox talks, and risk assessments for site activities.
  • Ensure proper use of personal protective equipment (PPE) and adherence to confined space, lifting, and excavation safety rules.
  • Coordination & Communication
  • Coordinate with construction teams, subcontractors, vendors, and inspectors to ensure smooth workflow.
  • Liaise with project engineers, planners, and QA/QC teams to resolve technical issues.
  • Maintain accurate records of site activities, daily progress reports, and material usage.
  • Material & Equipment Management
  • Verify receipt, storage, and handling of materials and equipment at the site.
  • Ensure proper maintenance and deployment of tools, machinery, and temporary supports.
  • Problem Solving & Reporting
  • Identify potential delays, technical issues, or risks, and propose solutions.
  • Prepare daily, weekly, and monthly reports on site progress, challenges, and completed works.
  • Compliance & Documentation
  • Ensure all work is compliant with local regulations, client requirements, and industry codes.
  • Maintain proper documentation, including inspection reports, welding records, and test certificates.
  • ADNO

Construction Engineer

STRILING OIL & GAS GROUP
03.2025 - 09.2025
  • Oversee and direct construction projects from conception to completion.
  • Review the project in-depth to schedule deliverables and estimate costs.
  • Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations.
  • Coordinate and direct construction workers and subcontractors.
  • Select tools, materials and equipment and track inventory.
  • Meet contractual conditions of performance.
  • Review the work progress on daily basis.
  • Prepare internal and external reports pertaining to job status.
  • Plan ahead to prevent problems and resolve any emerging ones.
  • Negotiate terms of agreements, draft contracts and obtain permits and licenses.
  • Analyze, manage and mitigate risks.
  • Ensure quality construction standards and the use of proper construction techniques.
  • Nigeria

Sr Engineer Pipeline

Tractable engineering pvt. ltd.
05.2022 - 01.2025
  • Implementation quality control plans and procedure to provide the most efficient and effective onsite construction works.
  • Review QC procedures, ITP and Quality plan & assist with establishing acceptable working practices for construction activities.
  • Monitor delivery of permanent material & ensure the quality product /Consumables/Material comply with requirement of established standard & specification.
  • Establishes and assists in establishing the detailed project execution plan and the development of the overall project engineering and schedule.
  • Directs and coordinates Pipeline engineering activities for the project on assigned areas including supervision of engineers to meet project goals and objectives.
  • Handling of Hydro test Packages and Planning for execution of hydro tests on a look ahead schedule.
  • Modification and repair works for mechanical and pipeline activities during commissioning phase.
  • Ensures the Zero Accident Philosophy is incorporated into every aspect of construction/commissioning operations. Actively participates in scheduled safety meetings.
  • Management, in assigned areas of all field erection and installation supervision including safety, quality, labor relations and waste management, and adherence to work plans and schedule.
  • Determining the appropriate materials, processes, and equipment needed to meet project goals within the specified timeframe and budget.
  • Coordinating with other departments such as engineering or human resources, as needed, to ensure that all project requirements are met.
  • Establishing a schedule of milestones and deadlines for each stage of the project, then tracking progress against them to ensure they are met.
  • Monitoring the work of engineers, architects, and contractors to ensure that projects are completed on time and within budget.
  • Ensuring that safety standards are met on site at all times.

Sr. Engineer Pipeline/Piping

ARSH INFRASTRUCTURE
Delhi
06.2020 - 02.2022
  • Defines the scope, schedule and budget for the design and materials for pipeline projects.
  • Manage the execution of the deliverables against the project budget and schedule.
  • Reviews the design deliverables and construction deliverables to ensure all teams perform as per project requirements.
  • Ensure Client free issue a material and project material purchased by contractor are kept safely and installed in line with specifications.
  • Ensure all resources are properly assigned and teams are properly planned to get best output, progress and productivity.
  • Ensure all front end and back-end pipeline activities are closely managed along with TCP & OFC activities, and hydro testing also is done as early as possible.
  • Reviews lessons learned from past projects and incorporates recommendations into construction methodologies.
  • Provide technical guidance to junior engineers within the team.
  • Support department initiatives like team incentives, rewards, QHSE requirements etc.

Inspection Engineer

VCS Quality Services Pvt.Ltd
Siv Sagar, Assam
10.2017 - 12.2019
  • Oversee and direct construction projects from conception to completion.
  • Review the project in-depth to schedule deliverables and estimate costs.
  • Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations.
  • Coordinate and direct construction workers and subcontractors.
  • Select tools, materials and equipment and track inventory.
  • Meet contractual conditions of performance.
  • Review the work progress on daily basis.
  • Prepare internal and external reports pertaining to job status.
  • Plan ahead to prevent problems and resolve any emerging ones.
  • Negotiate terms of agreements, draft contracts and obtain permits and licenses.
  • Analyze, manage and mitigate risks.
  • Ensure quality construction standards and the use of proper construction techniques.

Inspection Engineer

Sanmarg Projects. Pvt. Ltd. (DNEPL, Reliance Ltd.)
Valsad
05.2016 - 10.2017
  • 240 KM Pipeline Project in Gujarat region.
  • My spread is 80 KM which is known as Spread: -03.
  • Mainline Welding inspection Like before Welding Bevel, Root gap, inspect the electrode, Welder ID Card.
  • Blasting, Coating, Peel test & all incoming material at site.
  • HDD, Auger Boring, HPT.
  • Pushing, pulling in following section.
  • Pre-hydro test, and hydro test of following section.
  • Monitor delivery of permanent material & ensure the quality product /Consumables/Material complies with requirement of established standard & specification.
  • Establishes and assists in establishing the detailed project execution plan and the development of the overall project engineering and schedule.
  • Directs and coordinates Pipeline engineering activities for the project on assigned areas including supervision of engineers to meet project goals and objectives.
  • Handling of Hydro test Packages and Planning for execution of hydro tests on a look ahead schedule.
  • Modification and repair work for mechanical and pipeline activities during commissioning phase.
  • Ensures the Zero Accident Philosophy is incorporated into every aspect of construction/commissioning operations. Actively participates in scheduled safety meetings.
  • Management, in assigned areas of all field erection and installation supervision including safety, quality, labor relations and waste management, and adherence to work plans and schedule.
  • Support development of the final construction methodology and work prioritization.

Inspection Engineer

Sanmarg Projects Pvt.Ltd (SHPPL, Reliance Ltd.)
Shadhol
10.2014 - 05.2016
  • Implementation quality control plans and procedure to provide the most efficient and effective onsite construction works.
  • Review QC procedures, ITP and Quality plan & assist with establishing acceptable working practices for construction activities.
  • Monitor delivery of permanent material & ensure the quality product /Consumables/Material comply with requirement of established standard & specification.
  • Establishes and assists in establishing the detailed project execution plan and the development of the overall project engineering and schedule.
  • Directs and coordinates Pipeline engineering activities for the project on assigned areas including supervision of engineers to meet project goals and objectives.
  • Handling of Hydro test Packages and Planning for execution of hydro tests on a look ahead schedule.
  • Modification and repair work for mechanical and pipeline activities during commissioning phase.
  • Ensures the Zero Accident Philosophy is incorporated into every aspect of construction/commissioning operations. Actively participates in scheduled safety meetings.
  • Management, in assigned areas of all field erection and installation supervision including safety, quality, labor relations and waste management, and adherence to work plans and schedule.
  • Support development of the final construction methodology and work prioritization.

Site Engineer

Punj Lloyd Ltd. (J3 Refinery RGPL)
10.2013 - 09.2014
  • Additional Knowledge Testing methods like Hardness test, Tensile test, Bend test, harpy Impact test and Third-Party Inspection methods.
  • Managerial skill management by objective & strong communication skill.
  • Prepared for Time Schedules, Plans, Conducts and Coordinates Detailed Phases Of Engineering.
  • Reviewed and Checks Work of Other Piping and Valve of Contractor Engineers.
  • Assists in On-the-Job Training of Assigned Personnel. Perform Supplier Document Reviews. Improvement Work Process Improvement Goals.
  • Supervising the Prefabrication and Erection of the Pipe Networks at Site with All Related Construction, punch list, Hydrostatic Test and Pneumatic Test & Commissioning.
  • Reporting Technical Except for Received Materials on Site.
  • Received And Review for All Vendor Drawing & Vendor Package.
  • Comparison between Layout, GA, P&ID and Drawing.
  • Continuous Monitoring of Contractors to Avoid Wasting Time and Materials and Solutions in Conjunction with the Event.
  • Review & Approved WQT, PQR & WPS for This Project.
  • Prepare WPS.
  • Inspection of DT (HARDNESS TEST, CHARPY V-NOTCH, NICK BREAK, TENSILE TEST) NDT: -DP, UT, RT, MPT.
  • Jamnagar

Site Engineer

Punj Lloyd Ltd. (MCPL Project. Myanmar to China)
10.2012 - 09.2013
  • Conduct fit-up inspection & welding visual inspection of pipeline welding procedure specification and ASME VIII, IX.
  • Confirm & review final inspection records prepared by Vendors/Subcontractors and signature of the inspectors.
  • Prepare pipe spooling on isometric drawings by identifying shop fabrication and field installation to be carried out by sub-contractor Follow up by preparing this spool drawing for quality control NDE records.
  • Ensure that all works are done in accordance to the inspection work list based on applicable specification and in conformity with the approved plans.
  • Played a pivotal role in Planning, schedules, conducts, and coordinating detailed phases of pipeline engineering work for the construction phase of the project.
  • Work closely with the Superintendent General utilities in defining scope, schedule and management of interface.
  • Assist in preparation of the detailed construction schedule for assigned areas.
  • Scheduling Master plan and monthly plan for piping fabrication/erection activities, to monitor the piping progress in accordance with the Project schedules.
  • Ensuring that all construction activities are being carried out in accordance with the Project specification, procedures and Drawings as well, as in accordance w Scheduling weekly progress as per the projected planned targets.
  • Finalizing reports for the Weekly Client and PMT meetings.
  • Coordination and Initial Planning for streamlined pipe spool feed to site for laying and erection with the approved ITP.

Site Engineer

Punj Lloyd Ltd. (DBPL Project. Ratnagiri to Bangalore)
01.2009 - 09.2012
  • Supervise and coordinate pipeline construction activities at the site to ensure they are executed in accordance with project specifications, approved drawings, and schedules.
  • Monitor day-to-day progress and provide updates to project management.
  • Review and interpret engineering drawings, specifications, and piping isometrics.
  • Ensure proper fit-up, welding, alignment, and installation of pipeline sections.
  • Verify that materials, equipment, and construction methods meet project and industry standards.
  • Verify receipt, storage, and handling of materials and equipment at the site.
  • Ensure proper maintenance and deployment of tools, machinery, and temporary supports.

Education

B-Tech - Mechanical Engineering

C.C.S. University
Meerut
01-2008

Intermediate - science

B.I.E.C.
Patna
01-2003

Matriculation -

B.S.E.B
Patna
01-2000

Skills

  • Site management
  • Planning
  • Construction work
  • Oil & Gas Projects
  • Pipeline
  • Piping
  • Refinery
  • Standard Code & Specifications
  • Technical Knowledge in Inspection
  • Welding Quality Management
  • International Codes and Standards
  • API 650 Specification
  • API 653 Tank Inspections
  • API 510 Pressure Vessel Inspection Code
  • API 570 Piping Inspection Code
  • ASME
  • B1634 Valves
  • B313 Process Piping
  • Section II: Materials
  • Section V: Non Destructive Examination
  • Section VIII: Division 1
  • Section IX: Welding and Brazing Qualifications
  • ASNT
  • SNT-TC-1A Personnel Qualification and Certification in Non-destructive Testing

Custom Section

  • 0917600651987
  • +971547665967

Personal Information

Passport Number: G9042413

Disclaimer

2026-02-24, MD RAUKESH, I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Timeline

Pipeline Mechanical Engineer

INTERNATION MECHANECHAL ELECTRICAL ENGINEERING
10.2025 - Current

Construction Engineer

STRILING OIL & GAS GROUP
03.2025 - 09.2025

Sr Engineer Pipeline

Tractable engineering pvt. ltd.
05.2022 - 01.2025

Sr. Engineer Pipeline/Piping

ARSH INFRASTRUCTURE
06.2020 - 02.2022

Inspection Engineer

VCS Quality Services Pvt.Ltd
10.2017 - 12.2019

Inspection Engineer

Sanmarg Projects. Pvt. Ltd. (DNEPL, Reliance Ltd.)
05.2016 - 10.2017

Inspection Engineer

Sanmarg Projects Pvt.Ltd (SHPPL, Reliance Ltd.)
10.2014 - 05.2016

Site Engineer

Punj Lloyd Ltd. (J3 Refinery RGPL)
10.2013 - 09.2014

Site Engineer

Punj Lloyd Ltd. (MCPL Project. Myanmar to China)
10.2012 - 09.2013

Site Engineer

Punj Lloyd Ltd. (DBPL Project. Ratnagiri to Bangalore)
01.2009 - 09.2012

B-Tech - Mechanical Engineering

C.C.S. University

Intermediate - science

B.I.E.C.

Matriculation -

B.S.E.B
MD RAUKESH