Summary
Overview
Work History
Education
Skills
Timeline
Generic
MOHAMMAD SHANE ALAM

MOHAMMAD SHANE ALAM

Electronic Engineer
Abu Dhabi

Summary

EPC Project (Engineering, Procurement ,Construction Experience) (ADNOC ONSHORE) Career Objective To obtain a challenging and responsible position in a professionally managed organization. I am looking forward to an opportunity where I can utilize my skills in contribution effectively to the success of the organization and further improve my personal skills.

Overview

6
6
years of professional experience
1
1
Language

Work History

Foreman

Adyard Abu Dhabi LLC
Abu Dhabi
11.2020 - Current
  • Reworked positions and workflow based on individual abilities and production targets.
  • Checked equipment to determine if maintenance was required.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Strong technical skills and project handling capabilities with strong knowledge in any types of drawing handling like P & ID drawing, GA layout, Cable Routing,Cable Schedule , Block Diagram and other process drawing and do the appropriate RLM and FCN as per the Site Condition.
  • Reviewed all drawings like P&ID ,Equipment Layout ,Civil GA layout, Cable routing, cable Schedule, Block diagram,equipment Installation Drawing related to construction and kept a proper record of drawing and do the Appropriate RLM as per the Site condition
  • Planning of daily activities based on the schedule.
  • Monitor the E&I/CIVIL works and expediate the job.
  • Construction and dismantling of Equipment as per the drawing along with tagging.
  • Train the newly joined employee about work related activity
  • Supported QC engineer to complete the site audit and RFI.
  • Attended all punch point given by Site Engineer and Supervisor.
  • Monitor daily activities work carried out at site and report to the Site Engineer and Construction Manager.
  • Handling of Contractors and Manpower at Site.
  • Dealing with the Operation Team related to Permit and Work Related Activity.
  • Checking of all the materials as per the packing list there Specifications.
  • Going for site visit to collect necessary information and analyzing construction constrain before starting the job.
  • Sound knowledge of E&I and Civil engineering works related to Excavation ,cable laying,Equipment Installation,Foundation Installataion,Backfilling cable tray Stanction support Etc.
  • Daily bases timesheet , daily progress report and Material request Handling in Excel sheet.
  • Demolision and Reinstalaltion Of Various System inside Out station.

Supervisor

NEW ALFA CONSTRUCTION
Bhopal
03.2017 - 09.2019
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Created successful work schedules for each team member to maintain deadlines and fully staff shifts.
  • Evaluated employee performance and coached and trained new employees for production positions.

Project Undertaken and Certification

Adyard
abu dhabi
08.2015 - 01.2016
  • Pipeline surveillance system and upgradation of Telecom Network (SDH) and F&G SystemPipeline surveillance system and upgradation of Telecom Network (SDH) and F&G System
  • WMS Authorization Card for ADNOC Pipeline Project as Job Performer (JP)
  • Certified Fiber Optical Cable Splicing & testing for Single mode and Multimode cable from Oman Fiber Optic Co.S.A.O.C,Abu Dhabi
  • Hold UAE Driving Licence.
  • work in bob and habshan plant ,Abu dhabi

Embedded Engineer

Robokidz Eduventures Pvt Ltd
Pune
06.2014 - 02.2015
  • Collaborated with software, firmware and hardware engineers to develop complete embedded solutions.
  • Researched and identified new technologies and approaches, helping to proactively solve unique issues.
  • Engineered software components for automation hardware such as microcontrollers and sensors.
  • Worked in the development module of Robot Applications.
  • Implemented and interfaced the architectural module of various sensors like RF Sensor, IR Sensor, Ultra Sonic Sensor and Zig-bee.
  • Responsible for carrying out modifications in existing software and hardware to improve their performance, to be delivered in the market

Project Undertaken During College

MIT
Pune
12.2012 - 06.2013
  • Solar Operated Automatic Irrigation System For Terrace Garden(Project undertaken during BE Course)
  • Intelligent Energy saving System using Embedded System(Project undertaken during BE Course).

Education

MIT Academy of Engineering
Pune

Electronic Engineering

University of Pune

ICSE - undefined

Spicer Higher Secondary School

Skills

MS office Word, Excel ,power point, C programming, Embedded Programming, SQL ,JAVAInstrument UsedOTDR Machine , Fiber optic Splicing Machine , Multimeter , Megger, RFID Scanner ,Cable Scanner, Oscilloscope , Soldering gunHobbiesTravelling, Sketching , Painting

Team work,leadership,hard working,adaptablity

Timeline

Foreman

Adyard Abu Dhabi LLC
11.2020 - Current

Supervisor

NEW ALFA CONSTRUCTION
03.2017 - 09.2019

Project Undertaken and Certification

Adyard
08.2015 - 01.2016

Embedded Engineer

Robokidz Eduventures Pvt Ltd
06.2014 - 02.2015

Project Undertaken During College

MIT
12.2012 - 06.2013

MIT Academy of Engineering

Electronic Engineering

University of Pune

ICSE - undefined

Spicer Higher Secondary School
MOHAMMAD SHANE ALAMElectronic Engineer