Detail-oriented professional with advanced research abilities and a strong foundation in computer skills, including proficiency in MS Project and AutoCAD. Recognised for high communication skills, adaptability, and the ability to work both independently and collaboratively within teams. Demonstrates a self-motivated approach to tasks, excelling in interactive environments and consistently delivering results through fast learning and effective teamwork. Committed to leveraging technical expertise and interpersonal strengths to contribute meaningfully to organisational goals.
Overview
29
29
years of professional experience
2011
2011
years of post-secondary education
1
1
Certification
Work history
Site Manager
ACINTYA RENEWABLES PRIVATE LIMITED
Hyderabad
09.2020 - 02.2025
Overseeing and directing construction projects from conception to completion
Reviewing projects in-depth to schedule deliverables and estimate costs
Coordinating and supervising construction workers
Selecting tools and materials and ordering and purchasing materials appropriately
Ensuring adherence to all health and safety standards and reporting issues
Managing the use of construction equipment and machinery
Resolving problems and implementing improvements in construction processes
Maintaining communication between project managers, site staff, and clients
Planning daily work schedules and coordinating workers on site
Inspecting construction sites regularly to identify and eliminate potential safety hazards
Supervising and providing guidance to construction workers and subcontractors
Ensuring materials are supplied and work is completed on schedule
Preparing and submitting project estimates and budgets
Documenting and reporting progress to stakeholders and adhering to compliance regulations
Site Engineer
Combined Group Contracting Company CGCC
05.2017 - 12.2019
Review the Method Statements according to the project specifications as well as HSE requirements & work instructions
Executing the erection work for the different material types as per KOC procedure and specification
Conducting material receiving inspection as per approved drawings, review of material data sheets and coordination of material inspection activities with client
Preparing of engineering drawings as per site conditions and work requirement following standards specification for mechanical engineering design
Review of approved P&ID, layout and isometric drawings
Knowledge in referring piping class based on the client specification
Checking the Material inspection such as pipes, fittings, gaskets, flanges, valves, and review of material data sheet
Inspection of piping fabrication and erection according to the client specification, codes and standards
Review of hydro test packages for Hydro/Pneumatic testing
Review the required inspection for the erected lines like flange tighten, holiday test, wrapping inspection, hydro test as per KOC regulation
Review of test packages to conduct walk through to check for line verticality, line bend, dog leg and installed pipe supports
Ensuring the HSE procedure and precautions to do the work safely
Pre-commissioning and commissioning of the completed facilities
Arranging the work execution plan and arranging the required resources
Ensuring the work procedure as per KOC standard and specification
Ensuring the QC/QA for the executed work to maintain the client satisfaction
Mechanical Construction Engineer
Combined Group Contracting Company CGCC
01.2015 - 04.2017
Engineering Drawings Co-ordination for Tanks, Drain Vessels, Skids, Associated Piping, layouts, P&IDS, Control Cabin, Security Cabins, Shelters, for Tanks and Skids, Platforms, Ladders for Tanks, Associate Piping Drawings from our Design Engineering Sub-Contractor Aker Solutions to our Client KOC for Review and Approval
Daily Co-ordination with SUB-CONTRACTORS to Complete the Construction Operations as per Scheduled time
Preparation of Construction Procedures/Quality Procedures for KOC Review and Approval
Preparation of Daily, weekly Plan for Construction Operations and Client KOC Approval
Execution and Co-ordination from KOC Approved Subcontractors Arabi Enertech for 11TANKS and GSS Factory for 6 Drain Vessels Fabrication/Construction at their Workshops and Construction sites
Review of all Engineering Documents, Quality Procedures from Approved Sub-Contractor and submission for KOC REVIEW AND APPROVAL
Daily Report to Project Manager and Client KOC
Execution in Construction of Chemical Storage Tanks (11Nos) S.S and C.S Tanks (Demulsified Tanks, Scale Inhibitor /Corrosion Inhibitor Tanks, Oxygen Scavenger Tanks and Fire Water Tanks Construction and Associated Piping, Hydro-Test for Tanks and Piping and Commissioning for Primary Facility at Burgan Area
Secondary Facility at 20 Gathering Centers for KOC West Kuwait, North Kuwait, South & East Kuwait Area, SKIDS Fabrication, Construction/Erection at each Gathering Centre with Associated Piping and Commissioning
Shelters for all Tanks and Skids, Fabrication and Construction/Erection of Drain Vessels IN Drain Pit
Construction of Control Building, Security cabins
Estimation of SKIDS Piping, Engineering Drawing Co-ordination from Approved Sub-Contractor AKER to Client KOC FOR Review and Approval
Daily/weekly Plan for Manpower, Equipment for Construction and Operations of Secondary Facility
Co-ordination with Project Management, Quality, Planning, Construction, Engineering Departments to Complete the Project as per Client Approved Plan
Senior Site Engineer
Heavy Engineering Industries & Shipbuilding HEISCO
01.2012 - 12.2014
Executing the erection work for the different material types as per KOC procedure and specification
Insuring the QC requirement and HSE instructions
Adjusting the engineering drawing as per site conditions and work requirement following the standers specification for mechanical engineering design
Executing the required inspection for the erected lines like flange tighten, holiday test, wrapping inspection, hydro test as per KOC regulation
Preparation of various types of design drawings for projects related to Mechanical, Piping, Flow lines, Instrumentation, Schematic diagrams, Loop diagram, P & ID, Layout plans, Isometrics and other engineering related works
Marking of pipe supports and their details in piping layout plan
Preparation of General Layout drawings of pump house piping
Preparation of Isometric drawings, Assembled drawings, Construction drawings (Piping, Civil & Electrical), Bill of Materials, Structural Bridges, Pipe routings, Piping profiles, Reconciliation of total piping, etc
Preparing drawings for Tie-in details with existing line to new drain pipeline inside the GCs
Preparing drawings for Firefighting system showing hydrant and tie-in connections, Pipeline layout and detailed arrangement
Site Engineer
Heavy Engineering Industries & Shipbuilding HEISCO
05.2010 - 12.2011
Inspection of Fit up and fabrication of the piping to ensure whether it's as per approved isometric drawings
Inspection and Hydro Test works Arrangement
Site Supervision and Erection of the fabricated spools
Commissioning, testing and pigging works for pipelines
Senior Site Supervisor
Heavy Engineering Industries & Shipbuilding HEISCO
12.2006 - 04.2010
Update drawing / Projects files / records to include in new drawings
Maintain Proper Drawings/Documents register & System filing system as per Company document Control Procedure
Distributions of Drawings & Documents to the concerned divisions as per requirement
Controlling of Drawings/Documents and ensuring that latest revisions being used at site
Modification and preparation of final As-Built drawings as per instructions/feedback provided by the client engineering department and site latest information
Site visit to take existing measurements to prepare detail design drawings
Preparing As-built drawings for client approval
Site Supervisor
Heavy Engineering Industries & Shipbuilding HEISCO
09.2002 - 11.2006
Preparation of Piping & Instrument Diagrams for different system (P&ID) as per engineer directives
Preparation of Instrument symbols, Key Plans, Fire Alarm & legend Drawings
Preparation of Overall Block Diagrams for different systems
Preparation of Instrument wiring, Main Cable Route & Fiber optic cable Layout
Preparation of Isometrics drawings of fire water system
Preparation of P & ID, Layout plans Isometrics and other engineering related works
Preparation of Flow lines & water injection pipeline network
Marking of pipe supports and their details in piping layout plan
Modification and preparation of final As-built drawings as per instructions given by site engineers
Site Supervisor
NARENDRA ASSOCIATES
Hyderabad
11.1995 - 09.2002
Structural Arrangement Drawing for Pipe racks, shade and conveyer etc
G.A
Drawing for Valve Access Platforms, Tank Platforms, Ladder and Handrail etc
Preparation of GAD & Detail Fabrication Drawings for Vessels, Storage Tanks etc
As per the analysis report
Preparation of fabrication detail drawings with Material list for piping and equipment's
Preparation of Excavation sketches/drawings for different size of valve Pits, underground Pipes, Equipment and Platform Foundation, Cable rack & Pipe rack foundation, Demolition of existing equipment foundation, Electrical and Instrument cable trenches etc
Education
B.Tech. - Mechanical Engineering
Diploma - Draftsmanship
Skills
Computer Skills
MS Project
AutoCAD
Interactive
Fast Learner
Advanced Research Abilities
High Communication Skills
Self-Motivated
Teamwork
Independent Work
Certification
Kuwait Society of Engineering (KSE) Card Holder, 51126, 08/16/18
Languages
English
Hindi
Arabic
Telugu
Custom
04/01/25
Personal Information
Passport Number: Z3810082
Date of birth: 04/05/76
Nationality: INDIAN
Marital status: Married
Visa status: Currently in Dubai on visit visa
Timeline
Site Manager
ACINTYA RENEWABLES PRIVATE LIMITED
09.2020 - 02.2025
Site Engineer
Combined Group Contracting Company CGCC
05.2017 - 12.2019
Mechanical Construction Engineer
Combined Group Contracting Company CGCC
01.2015 - 04.2017
Senior Site Engineer
Heavy Engineering Industries & Shipbuilding HEISCO
01.2012 - 12.2014
Site Engineer
Heavy Engineering Industries & Shipbuilding HEISCO
05.2010 - 12.2011
Senior Site Supervisor
Heavy Engineering Industries & Shipbuilding HEISCO
12.2006 - 04.2010
Site Supervisor
Heavy Engineering Industries & Shipbuilding HEISCO