A technically proficient Mechanical engineer with over 8+ years of experience in various capacities of Mechanical engineering like Designing, Drafting, Estimation, Submittal Preparing from Supplier as per Specification & Purchasing for HVAC, Plumbing & Firefighting.
Overview
10
10
years of professional experience
4
4
years of post-secondary education
Work History
Mechanical engineer
Capital Engineering Consultancy
Sharjah, UAE
07.2024 - Current
Responsibilities:
Completed mechanical designs for HVAC System while providing SME input to client and design teams.
Calculated energy savings to promote environmental sustainability and energy conservation to meet aggressive project LEED requirements.
Responsible for developing the design concepts of Mechanical systems and perform analysis of the same
Heat Load calculation after the building survey using Carrier and ASHRAE standards by the E20 form & HAP. Duct design following SMACNA duct design codes, Pipe design, selection of diffusers, grilles etc. (Mc Quay Duct & Pipe Sizer)
Project & Summary:
Etihad Rail Visitor Centre, Abu Dhabi. · Design & drafting of Mechanical Works
2B+G+M+15F+R Residential Building, Ras Al Khaimah. · Design & drafting of Mechanical Works
Al Miraya, Ras Al Khaimah. Design & drafting of Mechanical Works
Pullman Resort, Ras Al Khaimah. Design & drafting of Mechanical Works
Angel Bay, Ras Al Khaimah. Design & drafting of Mechanical Works
Mechanical Design Engineer
Al Hoson Group
Ajman, UAE
06.2017 - 06.2024
Responsibilities:
Responsible for developing as the design concepts of Mechanical systems and perform analysis of the same
Heat Load calculation after the building survey using Carrier and ASHRAE standards by the E20 form & HAP
Duct design following SMACNA duct design codes, Pipe design, selection of diffusers, grilles etc. (Mc Quay Duct & Pipe Sizer)
Preparing monthly work progress and attending weekly client meetings
Reviewing Mechanical Shop Drawing, MEP Coordination Drawing (Fire Fighting Plumbing, HVAC & Electrical) for the contractor to proceed with the work on site
Work will carry out as per Drawing, Project Specification and Coordinate with other Engineers like [civil, Electrical etc.] for more accuracy in work
Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines
Assisted in the preparation of a procurement plan with the buying department to agree suppliers &sub-contractors, terms & conditions, and discount levels
Developed database for mechanical equipment
Always established and maintained good client relationships
Ensured Company procedures and processes are implemented
Prepared tender prices and quantities from drawings and designs
Calculated cost estimates for projects, compiled and analyzed data that influenced cost estimates
Developed unit costs for labor items
Analyzed and evaluated received quotations to select most competitive supplier
Ensured quality while submitting more comprehensive alternative solutions for clients
Completed mechanical designs for HVAC, air control, fire protection and elevators while providing SME input to client and design teams
Designed budgets and cost estimates for projects with speed and accuracy while working closely with clients, drafters and employees to determine the best courses of action
Projects & Work Summary:
B+G+5F+R Residential Building, Warsan Fourth, Dubai. Design & drafting of Mechanical Works (Client: Issa Youssef Hassan, Consultant: Sigma Art & Main Contractor: Steel Construction Engineering Co L.L.C)
(B+G+3+R) Hospitality Care Centre, Dubai. Making of Shop Drawing, Calculations, Meeting with Clients & Consultant for Mechanical Works (Client: Dubai Health Authority, Consultant: Eng. Adnan Saffarini & Main Contractor: Unesia Interior LLC.)
Rashid hospital OPD, Dubai. Design, Drafting & Excavation of Mechanical Works (Client: Dubai Health Authority & Main Contractor: Unesia Interior LLC.)
B+G+2F Autism center, Sustainable City, Dubai. Making of Shop Drawing & Excavation of HVAC Works (Client: The Sustainable City, Consultant: Arif & Bintoak & Main Contractor: Jeet Building Cont. L.L.C.)
Dubai Land Residence Complex District Cooling Plant DCP-01, Dubai. Design, Drafting & Excavation of HVAC & Plumbing Works (Client: Empower, Consultant: Allied Consultant & Main Contractor: Chicago Maintenance & Construction CO LLC.)
Fly High Gymnastic, Dubai. Design, Drafting & Excavation of HVAC Works (Client: Fly High Fitness LLC & Main Contractor: Mittal Contracting LLC.)
Extension of restaurant with Facilities to top roof floor on additional two floors (12+13)Ibn Battuta Gate, Dubai. Design, Drafting & Excavation of HVAC Works (Client: Layalina Events Management, Consultant: Image Engineering Consultant & Main Contractor: Chirag Contracting LLC.)
Sheik Majed Al Qasimi G+1 Villa, Ras-al-Khaima, Making of Shop Drawing & Calculation of Mechanical Works (Client: HH Sheikh Majed Bin Sultan Al-Qasimi, Consultant: HME & Main Contractor: Unesia Interior LLC.)
Office on the 8th Floor of Index Tower, Dubai. Design & drafting of Mechanical Works (Client: First EFM Limited, Consultant: First EFM Limited & Main Contractor: Sukounu.)
Internal Modification Pediatric Inpatient Department, Mediclinic Al Noor Hospital, Abu Dhabi Making of Shop Drawing & Calculation of Mechanical Works (Client: Mediclinic International, Consultant: LEO A DALY & Main Contractor: Bond Interiors.)
Beit-El-Kell Restaurant & Shisha Area, DFC, Dubai. Design & drafting of Mechanical Works (Client: Beit-El-Kell Restaurant, Consultant: DFC & Main Contractor: Mazaya Middle East Interior LLC.)
Mubadala Health Point Hospital, Abu Dhabi. Making of Shop Drawing & Calculation of Mechanical Works (Client: Mubadala Medical Holding Company LLC., Consultant: LEO A DALY & Main Contractor: Arabian Company.)
Mechanical Design Engineer
Al Bionian consultant
Ras al-Khaimah, UAE
12.2016 - 06.2017
Responsibilities:
Completed mechanical designs for HVAC, air control, fire protection and elevators while providing SME input to client and design teams
Calculated energy savings to promote environmental sustainability and energy conservation to meet aggressive project LEED requirements
Tested models of alternate designs and processing methods to assess feasibility and operating condition effects
Responsible for developing the design concepts of Mechanical systems and perform analysis of the same
Heat Load calculation after the building survey using Carrier and ASHRAE standards by the E20 form & HAP
Duct design following SMACNA duct design codes, Pipe design, selection of diffusers, grilles etc. (Mc Quay Duct & Pipe Sizer)
Reviewing Mechanical Shop Drawing, MEP Coordination Drawing (Fire Fighting Plumbing, HVAC & Electrical) in order for the contractor to proceed with the work on site
Attending the meeting with clients upgrading the weekly progress of the projects & resolving the issues