Recognized Civil Engineer with 7 years of progressive experience in design, technical specification, construction inspections and survey work to maintain ethical knowledge and behavior consistent with high aims of civil engineering profession. Working knowledge of public works construction, inspection and CAD systems and skilled in operating survey equipment accurately.
Project: Construction of Sewerage Network Replacement & Rehabilitation in Al Ain
Project Description: The project involves the assessment, rehabilitation and replacement of the existing sewerage network to improve functionality and extend service life.
Key Contributions: Successfully executed trenching, bedding, over-pumping bypass strategies, and backfill compaction tests while maintaining uninterrupted municipal flow
Project: Expansion of Phase 2 Facilities, Ajman Waste Water Treatment Plant
Client: Ajman Sewerage Private Company Limited
Consultant: Jacobs
Project Description: The Influent flow at the existing WWTP Phase 2 head works is expected to increase from 40,000 m3/day to 60,000 m3/day (maximum 7 day rolling average capacity).
Key Contribution: Supervised mass reinforcement, formwork, and water-tight concreting for MBBR tanks, disc filters, and valve chambers
Project: Construction of Main Sewage Pumping Station at Muwaileh & Rising Main to Al Houma STP
Open Cut Excavation