Highly motivated Mechanical Design & Production Engineer looking to enhance my knowledge along with my managerial and technical skills by utilizing them in a reputable and growth-oriented organization resulting in the prosperity and growth of the company.
Overview
6
6
years of professional experience
8
8
years of post-secondary education
Work history
Production Engineer
Shielders Advance Industries
Abu Dhabi, UAE
06.2022 - Current
Performing the following duties during various Project Life Cycles: Production Planning and analysis of production as per the capacity
Measured process performance through tests, recommending improvements to increase productivity.
Designed improvements to existing systems, boosting production output.
Analysis of production Drawings and producibility of the product accordingly
Extraction of data pack & BOM from Step files as per Client's specifications
Making Production and Engineering Drawings from 3D Models
Controlling the Production line to work efficiently
Design and Fabricate JIGs and Fixtures to enhance the Production
Time Management through Multi-tasking, Work Break-down Structure and pushing the team to meet deadlines
Cost Management of the complete projects through appropriate selection of material and looking for alternate materials.
Design & Production Engineer
Blitzkrieg Defense Solution (BDS)
Islamabad
06.2018 - 06.2022
Successfully performed the following duties during various Project Life Cycles: Design optimization of interceptor 4x4 vehicle for fast production and better reliability and develop production drawings
Fabricated first six vehicles to deliver to Bahrain National Guards (BNG) and build a ground up for smooth production
Design and analyze reinforcements for LC-79 chassis to increase Gross Vehicle Weight (GVW) up to 5.5 tons for special operation vehicles
Designed Armoured vehicle cabins for various Ballistic and STANAG protection levels based upon the user requirement
Design and fabricated Ballistic doors for Pakistan Navy
Design Armoured Guard Posts for Pakistan Military for B6 level protection
Installation and maintenance of Face Mask machine and made improvements in the assembly for higher production
Cost Management of the complete projects through appropriate selection of material and looking for alternate materials
Time Management through Multi-tasking, Work Break-down Structure and pushing the team to meet deadlines.
Internee
Atlas Honda
Lahore, Pakistan
07.2015 - 08.2015
Atlas Honda is production plant for Honda vehicles
During Internship, spent one week each on Assembly Line, Paint Shop, Testing and Quality Control department and tried to understand there way of working.
Wrote reports outlining project progress and results.
Internee
Heavy Mechanical Complex (HMC)
Taxila, Pakistan
06.2014 - 08.2014
HMC has biggest infrastructure for forging, machining and casting
During Internship, have worked on CAD modelling and studied the tolerances that are required for forging, machining, casting, cutting, fabrication & welding.
Vertical Take-off and Landing (VTOL) Platform, In places where route restrictions prevent ambulances from moving, a vertical take-off and landing platform can be used to move the patients over those obstacles to the other side. Our designed drone was a scaled down prototype of it and it was able to carry a payload up to 1kg.